This is an old revision of the document!
Table of Contents
Yankton Station
| Yankton | |
“Yankton Circuit”Station Art in Yankton Station |
|
| Overview | |
|---|---|
| Operators | Yankton Railway |
| Qingli Railways | |
| Lilypad Rail | |
| Lines | Snowie Line |
| Snowtral Line | |
| Wanton Line | |
| Lakeside Mystic Line | |
| South Continental Line | |
| Airport Express | |
| HSR Northern Heights Line | |
| HSR Southern Cross Line | |
| KTT | |
| HSR Yankton APM | |
| Owners | Stronger Lock |
| Region | Yankton |
| Platforms | 17+4 (14 island, 3 dock, 4 dock APM) |
| Tracks | 21 |
| Coordinates | (3022, 5091) |
| Translations | |
| Traditional | 楊克頓 |
| Simplified | 楊克頓 |
| Colors | |
| Blue | |
| White | |
| Station | |
| Type | Underground |
| Phases | 3 |
| Floors | 9 |
| Platform Floors | 6 |
| Step-Free Accessible | Yes |
| Station Code | YAN |
| Opened | 27 September, 2022 |
| Electrification | - |
Yankton Station (Chinese: 楊克頓站) is a station of 9 lines, including Snowie Line, Snowtral Line, Wanton Line, Lakeside Mystic Line, South Continental Line, Airport Express, HSR Northern Heights Line, HSR Southern Cross Line, KTT. It is one of the most busiest and nostalgic station in the Let's Play Server.
The station is split into 3 phases, the Main Metro Phase, Airport Express Phase and the High Speed Railway Phase. There is APM Service and passageway connected both phases and Yanktei Station.
There is a station art, “Yankton Circuit”, in the middle of the main concourse where it shows the line colours passing through Yankton Station. An interesting fact is that although HSR platforms are in underground, it is designed to be the look of ground platforms.
There is also a ground station building in the Airport Express phase with car lanes for commerical uses.
History
- 18 August, 2022: Snowie Line starts construction. Stronger Lock (Yankton Railway) is responsible for this work. On the same day, Yankton Station starts construction.
- 24 August, 2022: Lakeside Mystic Line extends its service via Yankton, uses platforms 7-8.
- 11 September, 2022: Yankton Station platforms 1-10 are finished, while concourse is not yet constructed. This station is introduced by Jonathan on the Let's Play Series Season 1 Episode 9.
- 27 September, 2022: Snowie Line is offically opened to public, Wanton Line (On Hau - Gulaton) and Snowtral Line (Yankton - Gulaton) opens temporary service for testing.
- Unknown November, 2022: Yankton HSR Phase starts construction, adding platforms 11-15 and a pair of passing track. APM service is connected between Main Concourse, HSR Concourse and Yanktei Station. Temporary passegeway is built in the main concourse for connecting metro side.
- 14 November, 2022: Jonathan connected HSR railway, Northern Heights Line, to Yankton HSR Phase, passengers can take trains to Spawn and Llanmara directly in platform 15.
- 24 March, 2023: Metro Phase Concourse (L2) is officially opened, Exit A is connected to HSR Phase, passengers can directly walk to HSR platforms. Exits B-E and Exit J is opened. There is a VIP Longue in Main Concourse, and a Resting Room in Wanton Line platforms, providing comfortable rest for busy Yankton passengers.
- 7 June, 2023: South Continental Line extends its service and terminates in Yankton, uses platforms 9-10.
- 10 August, 2023: HSR Southern Cross starts its service in platform 15, connected to Danielston Memorial Station. Northern Heights Line trains moves its service in platform 14.
- 22 May, 2025: HSR Southern Cross Line is extended to Yunlong. KTT North is established and connecting Kallos LRT Depot. Notice that KTT North section and KTT main section is not connected as Nam Kok Area is still under discussion.
- 7 June, 2025: Exits K1 and K2 is added, and directly connected to Yankton HSR Terminal as its first pair of exits in the HSR phase.
- 11 June, 2025: Exit numbers Exits B, E, F has been rearranged. B1 and B2 has been rearranged to E2 and E1 respectively, while original exits E1 and E2 are rearranged to exits F1 and F2. Meanwhile, exits B1, B2, G1, G2, G3, K3, K4, K5, L1, L2 have been constructed.
- 15 June, 2025: Exits R1, R2, T, M are constrcuted. Meanwhile, Airport Express phase is start constructing.
- 4 November, 2025: Exit N is opened, connecting to Yanktei Underground Street. More shops are opened.
- 24 January, 2026: Airport Express is start testing its operation publicly, and Yankton Airport Express phase has been opened. Exit P is opened, while Exit Q (upper level) is still closed.
Layout
Metro/Airport Express Phase
| UG | Yankton AEL Terminal Building | Exit Q |
| G | Exits, Yankton AEL Terminal Building | Exit B-G |
| U1 | Shops | Exit E-G, R-T Passageway |
| In-town Check-in | Airport Express Platforms Passageway, In-town Check-in Counters | |
| U2/UC | Concourse / Airport Express Platforms | VIP Lonuge, Entrance/Exit barriers, Exit A, Exits J-N Passageway |
| Airport Express Platforms | ||
| Side Platform | ||
| Platform A2 | Airport Express to Northern Snowland via Spawn → | |
| Platform A1 | ← Airport Express Terminated Platform (Future to Nam Kok Airport) | |
| Side Platform | ||
| U3 | Snowtral Line Platforms | |
| Snowie Line Platforms | ||
| Platform 1 | Snowtral Line to Suzumenda → | |
| Island Platform | ||
| Platform 2 | ← Snowtral Line to Divillage Island | |
| Platform 3 | Snowie Line to Eden → | |
| Island Platform | ||
| Platform 4 | ← Snowie Line to Gapyeong (New Street) | |
| U4 | HSR Yankton APM Platforms | |
| Side Platform | ||
| Platform L1 | HSR Yankton APM to Yanktei → | |
| Platform L2 | ← HSR Yankton APM Terminated Platform | |
| Side Platform | ||
| U5/LC | Wanton Line Platforms | |
| Platform 5 | Wanton Line to On Hau → | |
| Island Platform | ||
| Transfer Lobby, Resting Room | ||
| Island Platform | ||
| Platform 6 | ← Wanton Line to Jacaranda Hill | |
| U6 | Lakeside Mystic Line Platforms | |
| South Continental Line Platforms | ||
| Platform 7 | Lakeside Mystic Line to Gate of Yunlong → | |
| Island Platform | ||
| Platform 8 | ← Lakeside Mystic Line to Lake City/Kowloon | |
| Platform 9 | South Continental Line to Cyan Heights → | |
| Island Platform | ||
| Platform 10 | ← South Continental Line Terminated Platform | |
HSR Phase
| G | Exits | Exit J-M |
| M | Passageway | Exit J-N Passageway, Exit N |
| L1 | HSR Northern Heights Line Platforms | |
| HSR Southern Cross Line Platforms | ||
| Passing Track → | ||
| ← Passing Track | ||
| Platform 11 | KTT North Terminating Platform (future KTT to Gapyeong) → | |
| Island Platform | ||
| Platform 12 | HSR Southern Cross Line to Yunlong → | |
| Platform 13 | ← KTT to Kallos LRT Depot | |
| Island Platform | ||
| Platform 14 | ← HSR Northern Heights Line to Llanmara Saint Ann's | |
| Platform 15 | ← HSR Southern Cross Line to Yongchun | |
| Side Platform | ||
| L2 | Exit Concourse | Exit Lobby, HSR Transfer Lobby |
| L3 | Entrance Lobby | Exit A-H, P-T Passageway, Entrance Lobby |
| L4 | HSR Yankton APM Platforms | |
| Side Platform | ||
| Platform L3 | HSR Yankton APM to Yanktei → | |
| Platform L4 | ← HSR Yankton APM to Yankton (Metro Phase) | |
| Side Platform | ||
