User Tools

Site Tools


mtr_letsplay:yankton

Table of Contents

Yankton Station

Yankton
“Yankton Circuit”
Station Art in Yankton Station
Overview
Operators Yankton Railway
Qingli Railways
Lilypad Rail
Lines Snowie Line
Snowtral Line
Wanton Line
Lakeside Mystic Line
South Continental Line
Airport Express
HSR Northern Heights Line
HSR Southern Cross Line
KTT
HSR Yankton APM
Owners Stronger Lock
Region Yankton
Platforms 17+4 (14 island, 3 dock, 4 dock APM)
Tracks 21
Coordinates (3022, 5091)
Translations
Traditional 楊克頓
Simplified 楊克頓
Colors
Blue
White
Station
Type Underground
Phases 3
Floors 9
Platform Floors 6
Step-Free Accessible Yes
Station Code YAN
Opened 27 September, 2022
Electrification -

Yankton Station (Chinese: 楊克頓站) is a station of 9 lines, including Snowie Line, Snowtral Line, Wanton Line, Lakeside Mystic Line, South Continental Line, Airport Express, HSR Northern Heights Line, HSR Southern Cross Line, KTT. It is one of the most busiest and nostalgic station in the Let's Play Server.

The station is split into 3 phases, the Main Metro Phase, Airport Express Phase and the High Speed Railway Phase. There is APM Service and passageway connected both phases and Yanktei Station.

There is a station art, “Yankton Circuit”, in the middle of the main concourse where it shows the line colours passing through Yankton Station. An interesting fact is that although HSR platforms are in underground, it is designed to be the look of ground platforms.

There is also a ground station building in the Airport Express phase with car lanes for commerical uses.

History

  • 18 August, 2022: Snowie Line starts construction. Stronger Lock (Yankton Railway) is responsible for this work. On the same day, Yankton Station starts construction.
  • 24 August, 2022: Lakeside Mystic Line extends its service via Yankton, uses platforms 7-8.
  • 11 September, 2022: Yankton Station platforms 1-10 are finished, while concourse is not yet constructed. This station is introduced by Jonathan on the Let's Play Series Season 1 Episode 9.
  • 27 September, 2022: Snowie Line is offically opened to public, Wanton Line (On Hau - Gulaton) and Snowtral Line (Yankton - Gulaton) opens temporary service for testing.
  • Unknown November, 2022: Yankton HSR Phase starts construction, adding platforms 11-15 and a pair of passing track. APM service is connected between Main Concourse, HSR Concourse and Yanktei Station. Temporary passegeway is built in the main concourse for connecting metro side.
  • 14 November, 2022: Jonathan connected HSR railway, Northern Heights Line, to Yankton HSR Phase, passengers can take trains to Spawn and Llanmara directly in platform 15.
  • 24 March, 2023: Metro Phase Concourse (L2) is officially opened, Exit A is connected to HSR Phase, passengers can directly walk to HSR platforms. Exits B-E and Exit J is opened. There is a VIP Longue in Main Concourse, and a Resting Room in Wanton Line platforms, providing comfortable rest for busy Yankton passengers.
  • 7 June, 2023: South Continental Line extends its service and terminates in Yankton, uses platforms 9-10.
  • 10 August, 2023: HSR Southern Cross starts its service in platform 15, connected to Danielston Memorial Station. Northern Heights Line trains moves its service in platform 14.
  • 22 May, 2025: HSR Southern Cross Line is extended to Yunlong. KTT North is established and connecting Kallos LRT Depot. Notice that KTT North section and KTT main section is not connected as Nam Kok Area is still under discussion.
  • 7 June, 2025: Exits K1 and K2 is added, and directly connected to Yankton HSR Terminal as its first pair of exits in the HSR phase.
  • 11 June, 2025: Exit numbers Exits B, E, F has been rearranged. B1 and B2 has been rearranged to E2 and E1 respectively, while original exits E1 and E2 are rearranged to exits F1 and F2. Meanwhile, exits B1, B2, G1, G2, G3, K3, K4, K5, L1, L2 have been constructed.
  • 15 June, 2025: Exits R1, R2, T, M are constrcuted. Meanwhile, Airport Express phase is start constructing.
  • 4 November, 2025: Exit N is opened, connecting to Yanktei Underground Street. More shops are opened.
  • 24 January, 2026: Airport Express is start testing its operation publicly, and Yankton Airport Express phase has been opened. Exit P is opened, while Exit Q (upper level) is still closed.

Layout

Metro/Airport Express Phase

UG Yankton AEL Terminal Building Exit Q
G Exits, Yankton AEL Terminal Building Exit B-G
U1 Shops Exit E-G, R-T Passageway
In-town Check-in Airport Express Platforms Passageway, In-town Check-in Counters
U2/UC Concourse / Airport Express Platforms VIP Lonuge, Entrance/Exit barriers, Exit A, Exits J-N Passageway
Airport Express Platforms
Side Platform, VIP Lounge, Main Concourse
Platform A1 Airport Express Terminated Platform (Future to Nam Kok Airport) →
Platform A2 Airport Express to Northern Snowland via Spawn
Side Platform
U3 Snowtral Line Platforms
Snowie Line Platforms
Platform 1 Snowtral Line to On Lum
Island Platform
Platform 2 Snowtral Line to Hong Kong River
Platform 3 Snowie Line to Eden
Island Platform
Platform 4 Snowie Line to Gapyeong (New Street)
U4 HSR Yankton APM Platforms
Side Platform
Platform L1 HSR Yankton APM to Yanktei
Platform L2 HSR Yankton APM Terminated Platform
Side Platform
U5/LC Wanton Line Platforms
Platform 5 Wanton Line to On Hau
Island Platform
Transfer Lobby, Resting Room
Island Platform
Platform 6 Wanton Line to Jacaranda Hill
U6 Lakeside Mystic Line Platforms
South Continental Line Platforms
Platform 7 Lakeside Mystic Line to Gate of Yunlong
Island Platform
Platform 8 Lakeside Mystic Line to Lake City/Kowloon
Platform 9 South Continental Line to Cyan Heights
Island Platform
Platform 10 South Continental Line Terminated Platform

HSR Phase

G Exits Exit J-M
M Passageway Exit J-N Passageway, Exit N
L1 HSR Northern Heights Line Platforms
HSR Southern Cross Line Platforms
KTT Platforms
Passing Track →
← Passing Track
Platform 11 KTT North Terminating Platform (future KTT to Gapyeong) →
Island Platform
Platform 12 HSR Southern Cross Line to Yunlong →
Platform 13 ← KTT to Kallos LRT Depot
Island Platform
Platform 14 HSR Northern Heights Line to Llanmara Saint Ann's
Platform 15 HSR Southern Cross Line to Yongchun
Side Platform
L2 Exit Concourse Exit Lobby, HSR Transfer Lobby
L3 Entrance Lobby Exit A-H, P-T Passageway, Entrance Lobby
L4 HSR Yankton APM Platforms
Side Platform
Platform L3 HSR Yankton APM to Yanktei
Platform L4 HSR Yankton APM to Yankton (Metro Phase)
Side Platform
mtr_letsplay/yankton.txt · Last modified: 2026/02/01 16:21 by SLC vs SLC