User Tools

Site Tools


mtr_letsplay:snowie_line

This is an old revision of the document!


Snowie Line

Snowie Line
雪伊綫
“Yankton Circuit”
Station Art in Yankton Station
Overview
Abbreviation SYL
Status Operational
(Eden - Southorn)
(Mcflurry - Yu Tei)
Work in Progress
(Haymarket,
Zuidbaai Centraal,
Chung Kong,
Chi Chuk,
Ying Mo,
Yuen Chow Kok,
Tai Po)
Owner Yankton Railway
Gyeongchun Railway
Locale Eden
Yankton
Montpelier
Aloha Zone
Gapyeong
Termini Eden / Gapyeong (New Street)
Connecting
Lines
Harbour Line
Line 3 (Cyan Gray Line) (WIP)
Cinderace Line (WIP)
Jigglypuff Line (WIP)
Resort Ferries
Lilac Light Rail (WIP)
Oculink Red Line (WIP)
Metro Marble Line
Hillside Line
Light Rail Metro
BCT Blue Line
Shinx Line
Furret Line
Azalea Cyan Line
Sightseeing Local Line
Sightseeing Line
Wilds Railway SW Plains Line
Wong Yip Lung (Dragon)
Line 2 (Kwong Chow - North Coast Line)
Wilds Railway Mimura Line
Stations 13 (Opened)
5 (Work in Progress)
Service
Operator(s) WLT
Service Hours 04:36 - next day 03:11
(UTC+8)
Frequency Every 1 - 8 mins1)
Depot Chung Kwo Kok Depot2)
Rolling Stock SP1900 Train
MLR Train (small variant)
History
Opened3) First open:
25 September, 2022
(Northern Snow Village - Birch Hill)
22 December, 2022
(Birch Hill - Kwong Chow)
24 April, 2023
(Mesa to Northern Snow Village)
18 May, 2024
(Kwong Chow - Tai Po)
After renovation:
31 December, 2023
(Hung Ngai Tung - Kwong Chow)
16 January, 2024
(Mesa to Northern Snow Village)
18 May, 2024
(Northern Snow Village to Mesa,
Northern Snow Village - Hung Ngai Tung)
2 July, 2024
(Mei Foo Wan - Tung Yuen)
Technical
Line Length ~20.8 km
Number of
Tracks
Double Track
Gauge 1435 mm
Electrification 25 kV AC
(Sakura Stream Junction - Providence)
Non-electrified
(Other sections)
Operating
Speed
Average: 47 km/h (13.1 m/s)
Maximum: 130 km/h (36.1 m/s)
Signalling
System
MTR Mod's Signalling
(with advanced speed controlling)
Route Map
added soon

Snowie Line (Chinese: 雪伊綫), is a rapid transit service operated by Yankton Railway, from Eden station to Gapyeong (New Street) station. The name comes from the meaning of “connecting Southorn Snow Region to Eden”. This is also the first line built and opened for public when Stronger joined in Let's PLay Community.

  • THIS IS A NON-FINISHED PAGE. DO NOT REPORT ANY MISSING OR MISLEADING INFORMATION.

History

Test.

Timeline

  • 26 July, 2022: Test 1
  • 7 August, 2022: Test 2

Operations

Trains are all serving between Eden and Gapyeong.

Average Train Intervals (in mins)4)
Time Session
(in UTC+8)
Line 1 (Meyan Line)
Phase 1
Tung Yuen - Tai Po Mesa - Tai Po Mei Foo Wan - Tai Po
5 am - 9 am 2.5 / 5.5 8 8
9 am - 9 pm 1.8 - 3.2 5 - 5.8 5 - 5.8
9 pm - 11 pm 1.0 - 2.2 3.2 2.6 - 3.8
11 pm - 1 am 1.8 - 3.2 5 - 5.8 5 - 5.8
1 am - 3 am 2.5 / 5.5 8 8

Future Plans

nil

Stations

added soon

1) , 4)
May get up to 10/15/20 mins near first and last train
2)
Temporary sidings are added at Chik Shek Wan station for better train interval management
3)
For individual stations, please refer to Stations
mtr_letsplay/snowie_line.1735622439.txt.gz · Last modified: 2024/12/31 05:20 by strongerlock