User Tools

Site Tools


mtr_letsplay:jigglypuff_line

Jigglypuff Line

(S13)Jigglypuff Line
Overview
Owner(s) Terralith Rapid Transit
Area Served N/A
Transit type Rapid_Transit
Stadtbahn
Line Number S13
Number of stations 271)
Real-Life Inspiration Keihan_Keishin_Line
Colour on map Smoke Pink (#BB492B)
Service & Operation
Began passenger operation September 2023
Operator(s) ShimanoMTR
Train length 4 vehicles per trainset
Technical
No. of tracks 2
Track gauge 1435mm
Electrification 1500V DC Overhead systems
Maximum speed 90 km/h
Top operational speed 80 km/h
Construction Specifications
Distance between nodes 3 blocks
Jigglypuff Line
Traditional Chinese 胖丁綫
Simplified Chinese 胖丁线
Transcriptions
Standard Mandarin
Hanyu Pinyin Pàng dīng xiàn
Yue: Cantonese
Yale Romanization Pàng dīng xiàn

The Jigglypuff Line (Chinese: 胖丁綫) is a core part of the ShimanoMTR network.

History

The line was first mentioned in November 2022 and was originally assigned the line number as Line S0. At that time, it was planned as AGT.

It will be built in September 2023 to a similar standard to Shimano LRT (SLRT) and Teufort LRT, and its number will be changed to Line S13. A few days later, the section between Kurokusa and Kuromurasaki opened, and through service with SLRT's AC01 and KR01 began.

Rolling Stocks

Operations

All trains operate in 4-car formations. Within the SMTR, all trains will operate throughout all sections. For through service with SLRT, AC01 and KR01 will operate alternately. See here for through service sections.

Average Train Intervals (in mins)
Time Session
(in UTC+8)
(S13)Jigglypuff Line

All hours
 

6 - 7

Future Plans

Construction is underway on an extension to Green Cape Station via Autumn Floatland Station.

Stations

1)
Excluding SLRT stations
mtr_letsplay/jigglypuff_line.txt · Last modified: 2024/11/16 04:14 by cinderaceots