Table of Contents
Delphox Line
| (S11)Delphox Line | |
| Overview | |
| Owner(s) | Terralith Rapid Transit |
| Area Served | Hana-koshi, Llanmara |
| Transit type | Rapid Transit |
| Light Metro | |
| Line Number | S11 |
| Number of stations | 48(Current) |
| 49(Plan) | |
| Real-Life Inspiration | Toei_Ōedo_Line |
| Colour on map | Fire Orange (#BB492B) |
| Service & Operation | |
| Began passenger operation | October 2022 |
| Operator(s) | ShimanoMTR |
| Train length | 9 vehicles per trainset |
| Technical | |
| No. of tracks | 2 |
| Track gauge | 1435mm |
| Drive system | Iron wheel type linear induction motor (aka: Linear Metro) |
| Electrification | 1500V DC Overhead systems |
| Maximum speed | 95 km/h |
| Top operational speed | 80 km/h |
| Construction Specifications | |
| Distance between nodes | 3 blocks |
| Ballast block | Stone |
| Sound barrier/support block | Orange yellow block |
| Tunnel Model | 5m Shield Tunnel → 4m Shield Tunnel(Plan) |
| Cinderace Line | |
| Traditional Chinese | 妖火紅狐綫 |
| Simplified Chinese | 妖火红狐线 |
| Transcriptions | |
| Standard Mandarin | |
| Hanyu Pinyin | yāo huǒ hóng hú xiàn |
| Yue: Cantonese | |
| Yale Romanization | yíu fó hùhng wùh xiàn |
| JyutPing | jiu2 fo2 hung4 wu4 sin3 |
The Delphox Line (Chinese: 妖火紅狐綫) is a core part of the ShimanoMTR network and runs in a figure 6 through the northwestern area of Spawn and through Llanmara.
History
Planning for this line began in August 2022, and a sign announcing its existence was installed at Extreme Hot Springs Station.
A Cinderace Line reservation platform was also installed at Shirokaba Mansion Station, which was completed in September 2022.
Construction began at Azalea Station in September 2022, and Line S11T opened between Azalea Station and Extreme Hot Springs Station in October 2022.
In November 2022, Line S11 will open between Kurokusa Mansion Station and Shirokaba Mansion Station.
Line S11T opened in early December 2022 between Extreme Hot Spring Station and Ying Chuk Station, and between Ying Chuk Station and Cinderace Station.
It will open between Azalea Station and Kurokaba Mansion Station in early January 2023. Line S11T has been merged into Line S11 and has been discontinued.
At the same time, a permanent depot was constructed approximately 1.5 km east of Ying chuk station.
It was extended from Ying Chuk station to Black Lea station in March 2023.
Queen Elizabeth II Station opens in July 2023.
In early August 2023, the entire loop line section opened from Shirokaba Mansion Station to Cinderace Station.
The final section, between Black Lea and Llanmara stations, will open in late August 2023. All sections are now open except for Twynn Station along the way.
From the end of 2023, due to server lag due to an increase in the number of players, a stuck area occurred near the Depot, so the service frequency was temporarily reduced to 6 minutes from December 30, 2023. April 4, 2024. By moving the Depot to the south and changing the alignment to make it difficult for passengers to get stuck, the service frequency was returned to 2 and a half minutes. The site of the old Depot will be used as the Jigglypuff Line Depot.
As part of a major renovation project on December 22, 2025, the line name will be changed to Delphox Line, and the name of Cindeace Depot station will be changed to Delphox City. This is the first time that a line name has been changed during operation, including SMTR lines other than LPS.
Rolling Stocks
Operations
All trains operate in 9-car formations. All trains run clockwise from Ying Chuk, return to Ying Chuk, and continue towards Llanmara.
As mentioned above, it used to be 6 minutes, but after relocating the Depot, it has been returned to 2 and a half minutes.
| Average Train Intervals (in mins) | |
|---|---|
| Time Session (in UTC+8) | (S11)Delphox Line |
| All hours <html> </html> | 3 |
Future Plans
The only unopened Twynn station is currently under construction. In parallel with this, Llanmara station is being renovated.
A large-scale renewal project is currently underway on this line, and in the future, plans are in place to install successor rolling stock such as the 11-000, as well as change the tunnel model.
