This is an old revision of the document!
Table of Contents
Kallos Express – NOT COMPLETED, REDOING
Kallos Express 麗灣特快 |
|
---|---|
![]() |
|
Overview | |
Status                   | Operational             |
Owner | Qingli Railways |
Locale | Spawn Kallos Jonathan’s Resort Tempest |
Termini | Yanjiang Minecraft Tempest |
Connecting Lines | WR Yanyu Line |
Spawn Grand Circular | |
Snowie Line | |
Lilac Light Rail | |
Stations | Yanjiang Mineshaft Eden Kallos Jonathan’s Resort Heung Fan Liu Daimon Island Tempest |
Service | |
System | Qingli Railways |
Operator(s) | Qingli Railways Cooporation Ltd. |
Depot | Yanjiang Mineshaft West |
Rolling Stock | SP1900 Train C1141A Train MLR Train |
History | |
Opened | 1 August 2022, 1 year ago |
Technical | |
Line Length | TBC |
Number of tracks | Double Track |
Operating Speed | Average: 154km/h (95.4mph) Maximum: 200km/h (124mph) |
The Kallos Express (Chinese: 麗灣特快) is one of the five metro lines of the Qingli Railways (QLR) system in the Let’s Play Server. Kallos Express was the only railway line of the New Harmony Railways before the construction of Kallos LRT Route 801, thus the first transportation route to connect to the Kallos District.
History
The initial proposal of this line was on the 23rd of June 2022, together when the Kallos District was proposed. The construction of the line started on the 11th of July 2022, and started service on the 1st of August 2022.
Rolling Stock
The line is currently served by 8-car SP1900, C1141A and MLR trains. The SP1900s and the C1141A trains entered service on the same date when the line started service, and the MLR trains entered service when the line is extended to Tempest. Trains operate with a frequency of about 3 minutes.