Table of Contents
等待修复 此页面没有被翻译完全。请帮助翻译本页。
(当全文翻译完时请移除这个段落。)
(需要补充翻译)丽莲轻铁810线
Lilac Light Rail Route 810 (Chinese: 麗蓮輕鐵810綫) is a (需要补充翻译)丽莲轻铁 route connecting Light Rail Depot stop and Enchanted South Hill stop, and is jointly owned by 睡莲铁路 and Qingli Railways.
Lilac Light Rail Route 810 麗蓮輕鐵810綫 |
|
---|---|
Overview | |
Operate location | Kallos Mou Tapu |
Transit type | Light Rail Transit |
System | (需要补充翻译)丽莲轻铁 |
Status | Operational |
Starting stop | Light Rail Depot |
Terminus | Enchanted South Hill |
Technical | |
Character | Overground At-grade Underground |
Maximum speed | 60km/h |
Number of stations | 9 |
Track gauge | 1435mm (4 ft 0.5 in) standard gauge |
Electrification | 750 DC Third Rail |
Depot | Kallos Light Rail Depot |
Rolling stock | Light Rail Phase I Light Rail Phase II Light Rail Phase III Light Rail Phase IV Light Rail Phase V |
Number of cars | 1 or 2 |
Service | |
Opened | 10 October 2022, 1 year ago |
Owner(s) | Qingli Railways Lilypad Rail |
Operator(s) | Qingli Railways |
History
On 17 September 2022, Qingli Railways proposed this route together with an upgrade on Kallos LRT stop (current Light Rail Depot stop) to a High Speed stop.
On 10 October 2022, this route is completed with the new Light Rail Depot stop.
On 29 October 2023, Royal Park is added to Enchanted South Hill bound for future connections to Elizabeth Line and route 804.
Stations
Fare Zones
-      Fare Zone 1: Light Rail Depot ⇄ Shek Ai
-      Fare Zone 4: Forest Boundaries ⇄ Enchanted South Hill
Route 810 can meet up with other routes: 410, 483P, 801, 802, 804, 882
Independent Sections
- Track section between Shek Ai and Forest Boundaries
Reference Pages
- (需要补充翻译)丽莲轻铁
- lrt_410
- lrt_882