| Terralith Rapid Transit | |
|
|
| Overview | |
| Owner | DelphoxOTS |
| Established | August 2022 |
| Area Served | (Wide area) |
| Transit type | Rapid Transitetc. |
| Number of lines | |
| Number of stations | |
| Real-Life Inspiration | Kōbe Rapid Transit Railway |
| Colour on map | Blue Gray (#2e4460) |
| Terralith Rapid Transit | |
| Traditional Chinese | 泰瑞斯捷運 |
| Simplified Chinese | 泰瑞斯捷运 |
| Transcriptions | |
| Standard Mandarin | |
| Hanyu Pinyin | tài ruì sī jié yùn |
| Yue: Cantonese | |
| Yale Romanization | taai seuih sī jiht wahn |
| JyutPing | taai3 seoi6 si1 zit6 wan6 |
Terralith Rapid Transit(Chinese: 泰瑞斯捷運, Common Notation: TRT) is a management company that manages lines and trains such as Shimano MTR.
This is a management company 1) that manages lines and trains established by DelphoxOTS when it joined the Let's Play server. We own almost all Shimano MTR and Shimano LRT lines and trains. The operation of the trains is outsourced to companies such as Shimano MTR.
See Shimano LRT
See Shimano LRT
see Shimano LRT
see Shimano LRT
Currently, the following numbers do not have a route name, route icon, or route color set. Currently, numbers up to S20 can be assigned.2) Once a name is decided and concrete plans are put forward, it will be moved to the list above.
Numbers that currently have names assigned for historical reasons but no route plans have been made.
This was set when vertical curves were introduced in the MTR3 era. However, as of 4.0.3 in MTR4, there is a bug that prevents the slope from being displayed, and this is only a guideline, so it may not always apply.
| Route | Guide |
| Line S1, S2, S3, S8, S10 | 35‰ |
| Line S4, S11, S12 | 66.7‰ |
| Line S13, S14 | 50‰ |
| SLRT normal | 60‰ |
| SLRT cog | 90~250‰ |
Excludes sidings and turnouts.
| Route | Radius |
| Lines S1, S2, S3 | 160m |
| Line S4 | 400m(If unavoidable, 200m.) |
| Line S8 | 100m |
| Line S10 | 300m? |
| Line S11 | 80m |
| Lines S12, S13 | 25m |
| Line S14 | 120m? |
| SLRT normal/solo size | 25m |
| SLRT small size | 15m |
| SLRT mini size | 12m |
Speed limits other than those for curves, as described below
| Route | Speed |
| Lines S1, S2, S3 | 120km/h(120km/h) |
| Lines S4, S8, S11, S13, S14 | 80km/h(80km/h) |
| Line S10 | 120km/h(160km/h) |
| Line S12 | 60km/h(70km/h) |
| SLRT AC01, 02, YM01, CD all routes | 80km/h |
| SLRT Other routes | 60km/h |
All units are radius. As of 4.0.3. SMTR only.
| Radius | Speed |
| Under 80m | 20km/h |
| 80m-185m | 40km/h |
| 185m-325m | 60km/h |
| 326m and above | 80km/h |
SMTR is required to install emergency doors at the front of all carriages. Furthermore, from August 2024 onwards, gangways will, in principle, be required to be designed so that passengers can pass through from front to back. SLRT is not required to install emergency doors, but the above standards must be adhered to if it provides through service to SMTR (including only entering SMTR at one station). Currently, only Lines S4 and S11 do not allow intrusion into the driver's cab 3) This may be expanded to other lines in the future. Due to concerns about schedule disruption, manual operation will not be implemented except during events.
| Route | Length(car length×per cars) |
| Lines S1, S2, S3, S10 | 200m(25m×8) |
| Line S4 | 90m(15m×6) |
| Line S8 | 120m(20m×6), 160m(20m×8)4) |
| Line S11 | 135m(15m×9) |
| Line S12 | 54m(9m×6) |
| Line S13 | 60m(15m×4) |
| Line S14 | 90m(15m×6), 60m(15m×4) |
| SLRT Division A5) | 15m(15m×1), 30m(15m×2), 42m(15m×2, 12m×1), 60m(15m×4), 72m(15m×4, 12m×1) |
| SLRT Division B6) | 32m(12m×1, 10m×2), 51m(12m×2, 10m×2, 7m×1), 30m(12m×1, 9m×2), 49m(12m×2, 9m×2, 7m×1) |
| SLRT Division C7) | 70m(12m×3, 10m×2, 7m×2), 51m(12m×2, 10m×2, 7m×1) |
In principle, the following equipment must be installed for SMTR.
Each station has a station name and a station number. Stations not managed by TRT generally do not have station numbers, but they are assigned internally. Note that slashes are included, so you will need to exclude them when searching for routes on Discord.
For SLRT, the rules are much more relaxed than above, but they must have at least PID, station name, ticket machine, and ticket processor. Conversely, ticket gates are not permitted.
Pillars (if present) will be installed at 11m intervals. Some platforms may be longer or shorter than the lengths listed below. If they are shorter, the doors of some carriages may not open. (Example: Line S10 Spawn station - the platform could not be extended at the request of the station owner, so the doors of four out of eight carriages do not open.)
The platform extension is determined by the number of pillars installed according to the following rules:
Length=11*<Span>+6 |
| Route | Length(Number of pillars installed) |
| Lines S1, S2, S3, S10 | 204m(18 Span) |
| Line S4 | 94m(8 Span) |
| Line S8 | 160m(14 Span) |
| Line S11 | 138m(12 Span) |
| Line S12 | 61m(5 Span) |
| Line S13 | 61m(5 Span) |
| Line S14 | 94m(8 Span) |
* Shimano MTR(SMTR), Shimano LRT(SLRT) - A subsidiary of SMTR that (in theory) owns SMTR's lines and rolling stock. The owner is the same person.
カービィ☆PuPuPuとれいん☆ https://youtu.be/E4fzDh57vU8
Simulation Country GAPAN Gepponkoku https://gepponkoku.nation.jp
BVE Workshop https://bvews.jpn.org/