User Tools

Site Tools


mtr_letsplay:shimano_line

Shimano Line

(S3)Shimano Line
Overview
Owner(s) Amethyst Valley Station - Oasis Island Station:
Terralith Rapid Transit
Area Served N/A
Transit type Rapid_Transit
Line Number S3
Number of stations 7(Current)
9(Plan)
Real-Life Inspiration
Colour on map Yellow (#FFBC00)
Service & Operation
Began passenger operation September 2022
Operator(s) ShimanoMTR
Train length 8 vehicles per trainset
Technical
No. of tracks 2
Track gauge 1435mm
Electrification 1500V DC Overhead systems
Maximum speed 160 km/h
Top operational speed 120 km/h
Construction Specifications
Distance between nodes 3 blocks
Ballast block Stone
Sound barrier/support block Yellow Black block
Shimano Line
Traditional Chinese 縞野綫
Simplified Chinese 縞野线
Transcriptions
Standard Mandarin
Hanyu Pinyin Gǎo yě xiàn
Yue: Cantonese
Yale Romanization Gǎo yě xiàn

The Shimano Line (Chinese: 縞野綫) of the ShimanoMTR network.

Overview

This line mainly heads north from Amethyst Valley. The section north of Shirakaba Mansion was constructed with the assumption that the line would travel at 120 km/h, so in some sections the track spacing is wider to make the line as straight as possible.

Some stations have been designed to current standards based on stations constructed in the SMTR Group's oldest project.

Although it runs at high speeds, it is not a rapid train like the Furret Line. The planned extension section, which will be described later, is scheduled to include stations that parallel lines do not stop at, but even though this line passes through some stations, it operates as a “local train” 1).

The standard journey time on this line is approximately 13 minutes.

History

The section from Amethyst Valley Station to Shirakaba Mansion Station will open in September 2022. At that time, the train consisted of six cars.

The section from Shirakaba Mansion Station to Oasis Island was subsequently opened, although the concourse section remained unfinished.

In conjunction with the construction of the parallel SLRT and other lines, work on the concourse section was carried out and completed. At that time, eight-car trains began operating.

Rolling Stocks

Operations

The entire line will operate at all times.

Average Train Intervals (in mins)
Time Session
(in UTC+8)
(S3)Shimano Line

All hours

3

Future Plans

  • The line is planned to be extended west from Oasis Island to the area around Mansion, about 5 km away, but this section is outside the jurisdiction of the TRT, and there are currently no prospects for it to open due to delays in the construction of the line that will be shared.

Stations

1)
for example, on the Tokyu Oimachi Line, the green local trains do not stop at some stations
mtr_letsplay/shimano_line.txt · Last modified: 2026/03/02 14:48 by CinderaceOTS