zh:mtr_letsplay:lrt_802
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
zh:mtr_letsplay:lrt_802 [2024/06/07 15:13] – [History] beihai10078 | zh:mtr_letsplay:lrt_802 [2024/06/07 16:25] (current) – ??? cokestudio | ||
---|---|---|---|
Line 53: | Line 53: | ||
===== History ===== | ===== History ===== | ||
- | On 5 August | + | On 5 August |
- | On 11 August | + | On 11 August |
On 13 August 2022, New Harmony Railways proposed to extend route 801P to Puketeraki and interchange with AT Metro. The construction started on 20 August 2022. On 3 September, Chin Ka Village light rail (Route 762) was completed which runs between Toitoi and Lei Yue Mun, owned by Jonathan Railway Authorities. New Harmony Railways released a proposal next day of setting up a peak hour route running from Kallos to Puketeraki, Toitoi, and continue to run on tracks of Route 762 until Lei Yue Mun. The route number of this route was later decided to be [[lrt_801x|801X]]. The extension completed on 10 September 2022. | On 13 August 2022, New Harmony Railways proposed to extend route 801P to Puketeraki and interchange with AT Metro. The construction started on 20 August 2022. On 3 September, Chin Ka Village light rail (Route 762) was completed which runs between Toitoi and Lei Yue Mun, owned by Jonathan Railway Authorities. New Harmony Railways released a proposal next day of setting up a peak hour route running from Kallos to Puketeraki, Toitoi, and continue to run on tracks of Route 762 until Lei Yue Mun. The route number of this route was later decided to be [[lrt_801x|801X]]. The extension completed on 10 September 2022. |
zh/mtr_letsplay/lrt_802.1717773229.txt.gz · Last modified: 2024/06/07 15:13 by beihai10078