zh:mtr_letsplay:lrt_802

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
zh:mtr_letsplay:lrt_802 [2024/05/12 13:02] – 创建 cokestudiozh:mtr_letsplay:lrt_802 [2024/06/07 16:25] (current) – ??? cokestudio
Line 51: Line 51:
 |**Operator(s)**|Qingli Railways| |**Operator(s)**|Qingli Railways|
 </WRAP> </WRAP>
-=====History=====+===== History ===== 
 On 5 August 2022, the first route built by Qingli Railways, [[lrt_801|route 801]] went fully operational. The original 801 runs from Kallos to Kallos Ferry Pier. On 5 August 2022, the first route built by Qingli Railways, [[lrt_801|route 801]] went fully operational. The original 801 runs from Kallos to Kallos Ferry Pier.
  
Line 67: Line 68:
  
 On 1 November 2023, Kallos stop is removed from route 802 and 802S On 1 November 2023, Kallos stop is removed from route 802 and 802S
 +
  
 =====Stations===== =====Stations=====
zh/mtr_letsplay/lrt_802.1715518952.txt.gz · Last modified: 2024/05/12 13:02 by cokestudio