User Tools

Site Tools


mtr_letsplay:yankton

This is an old revision of the document!


Table of Contents

Yankton Station

Yankton
Overview
Operators Yankton Railway
New Harmony Railways
Lilypad Rail
Lines Snowie Line
Snowtral Line
Wanton Line
Lakeside Mystic Line
South Continental Line
HSR Northern Heights Line
HSR Southern Cross Line
HSR Yankton APM
Owners Stronger Lock
Region Yankton
Platforms 15+4 (14 island, 1 dock, 4 dock APM)
Tracks 19
Coordinates (3022, 5091)
Translations
Traditional 楊克頓
Simplified 楊克頓
Colors
Blue
White
Station
Type Underground
Phases 2
Floors -
Platform Floors 5
Step-Free Accessible Yes
Station Code YAN
Opened 27 September, 2022
Electrification -

Yankton Station (Chinese: 楊克頓站) is a station of 7 lines, including Snowie Line, Snowtral Line, Wanton Line, Lakeside Mystic Line, South Continental Line, HSR Northern Heights Line, HSR Southern Cross Line. It is one of the most busiest and nostalgic station in the Let's Play Server.

The station is split into 2 phases, the Main Metro Phase and the High Speed Railway Phase. There is APM Service and passageway connected both phases.

There is a station art, “Yankton Circuit”, in the middle of the main concourse where it shows the line colours passing through Yankton Station. An interesting fact is that although HSR platforms are in underground, it is designed to be the look of ground platforms.

History

  • 18 August, 2022: Snowie Line starts construction. Stronger Lock (Yankton Railway) is responsible for this work. On the same day, Yankton Station starts construction.
  • 24 August, 2022: Lakeside Mystic Line extends its service via Yankton, uses platforms 7-8.
  • 11 September, 2022: Yankton Station platforms 1-10 are finished, while concourse is not yet constructed. This station is introduced by Jonathan on the Let's Play Series Season 1 Episode 9.
  • 27 September, 2022: Snowie Line is offically opened to public, Wanton Line (On Hau - Gulaton) and Snowtral Line (Yankton - Gulaton) opens temporary service for testing.
  • Unknown November, 2022: Yankton HSR Phase starts construction, adding platforms 11-15 and a pair of passing track. APM service is connected between Main Concourse, HSR Concourse and Yanktei Station. Temporary passegeway is built in the main concourse for connecting metro side.
  • 14 November, 2022: Jonathan connected HSR railway, Northern Heights Line, to Yankton HSR Phase, passengers can take trains to Spawn and Llanmara directly in platform 15.
  • 24 March, 2023: Metro Phase Concourse (L2) is officially opened, Exit A is connected to HSR Phase, passengers can directly walk to HSR platforms. Exits B-E and Exit J is opened. There is a VIP Longue in Main Concourse, and a Resting Room in Wanton Line platforms, providing comfortable rest for busy Yankton passengers.
  • 7 June, 2023: South Continental Line extends its service and terminates in Yankton, uses platforms 9-10.
  • 10 August, 2023: HSR Southern Cross starts its service in platform 15, connected to Danielston Memorial Station. Northern Heights Line trains moves its service in platform 14.

Layout

Metro Phase

G Exits Exit B-E
L1 Shops Exit B-E Passageway
L2 Concourse VIP Lonuge, Gates, Exit A, Exit J Passageway
L3 Snowie Line Platforms
Snowtral Line Platforms
Platform 1 Line 1 (Meyan Line) Phase 1 to Hung Ngai Tung
Island Platform
Platform 2 Line 1 (Meyan Line) Phase 1 to Kwong Chow
Platform 1 Line 1 (Meyan Line) Phase 1 to Hung Ngai Tung
Island Platform
Platform 2 Line 1 (Meyan Line) Phase 1 to Kwong Chow
Platform 3 Line 1 (Meyan Line) Phase 1 to Hung Ngai Tung
Island Platform
Platform 4 Line 1 (Meyan Line) Phase 1 to Kwong Chow

HSR Phase

G Exits Exit J
M Passageway Exit J Passageway
L3 Snowtral Line Platforms
HSR Southern Cross Line Platforms
Platform 1 Line 1 (Meyan Line) Phase 1 to Hung Ngai Tung
Island Platform
Platform 2 Line 1 (Meyan Line) Phase 1 to Kwong Chow
Platform 1 Line 1 (Meyan Line) Phase 1 to Hung Ngai Tung
Island Platform
Platform 2 Line 1 (Meyan Line) Phase 1 to Kwong Chow
Platform 3 Line 1 (Meyan Line) Phase 1 to Hung Ngai Tung
Island Platform
Platform 4 Line 1 (Meyan Line) Phase 1 to Kwong Chow
L2 Exit Concourse Exit Gates, HSR Transfer Lobby
L3 Entrance Lobby Exit A Passageway, Entrance gates
L4 HSR Yankton APM Platforms
Side Platform
Platform L3 HSR Yankton APM to On Hau
Platform L4 HSR Yankton APM to Yankton (Metro Phase)
Side Platform
mtr_letsplay/yankton.1705847194.txt.gz · Last modified: 2024/01/21 14:26 by strongerlock