User Tools

Site Tools


mtr_letsplay:lrt_405

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
mtr_letsplay:lrt_405 [2023/10/31 06:11] tea_bocchimtr_letsplay:lrt_405 [2023/10/31 06:11] (current) tea_bocchi
Line 26: Line 26:
 |**Operator(s)**|[[lilypad_rail]]| |**Operator(s)**|[[lilypad_rail]]|
 </WRAP> </WRAP>
-====History====+=====History=====
 On 14 February 2023, [[lilypad_rail]] proposed the Phase 2 plan of the Chou Wai corridor, together with route 405. This route goes from Bridge Bay stop to Belvedere stop, to provide connections with Oculink Red and Yellow Line, and Sightseeing Express from Chou Wai area. On 14 February 2023, [[lilypad_rail]] proposed the Phase 2 plan of the Chou Wai corridor, together with route 405. This route goes from Bridge Bay stop to Belvedere stop, to provide connections with Oculink Red and Yellow Line, and Sightseeing Express from Chou Wai area.
  
mtr_letsplay/lrt_405.1698732665.txt.gz · Last modified: 2023/10/31 06:11 by tea_bocchi