This is an old revision of the document!
Table of Contents
Lake City Station
| Lake City | ||||
Platforms 1 and 2 at Lake City |
||||
| Chinese name | ||||
|---|---|---|---|---|
| Traditional | 湖城 | |||
| Simplified | 湖城 | |||
| Literal meaning | Lake City | |||
| Transcriptions | ||||
| Standard Mandarin | ||||
| Hanyu Pinyin | húchéng | |||
| Cantonese | ||||
| Yale Romanization | wùhsìhng | |||
| Jyutping | wu4sing4 | |||
| Overview | ||||
| Region | West Lake | |||
| Coordinates | (-3492, 3324) | |||
| Owners | Navi | |||
| Tea | ||||
| Operators | Wilds Railway | |||
| Lilypad Rail | ||||
| Qingli Railways | ||||
| SW Transit | ||||
| Lines | WR SW Plains Line | |||
| Overground | ||||
| Lakeside Mystic Line | ||||
| Cin Gyun Line | ||||
| Circulator IP | ||||
| Platforms | 7 WR SW Plains Line/Overground: 1 shared island platform Lakeside Mystic Line/Cin Gyun Line: 1 island platform each Circulator IP: 1 dock |
|||
| Tracks | 6 | |||
| Colors | ||||
| Blue | ||||
| White | ||||
| Station | ||||
| Type | Elevated (SW Plains Side) | |||
| Underground (QR Side) | ||||
| Floors | - | |||
| Platform Floors | 4 | |||
| Step-Free Accessible | Yes | |||
| Station Code | LAC | |||
| Opened | 8 August, 2022 | |||
| Electrification | 750 V DC third rail (SW Plains Line, Overground) | |||
| Services | ||||
| Preceding Station | Wilds Railway | Following station | ||
| Terminus | SW Plains Line | Shek Tan Island towards Chong Shu Chau |
||
| Terminus | Overground1) | Ichthus towards Cheung Ming |
||
| Preceding Station | Qingli Railways | Following station | ||
| Terminus | Lakeside Mystic Line | Mita-Shiro towards Higashi-Yunlong |
||
Lake City Station (Chinese: 湖城站) is a terminal station of 5 lines, including WR SW Plains Line, Overground, Lakeside Mystic Line, Cin Gyun Line, and
Circulator IP. It is frequently used for intros and outros in Jonathan's videos.
The station is split into 2 parts, the “Wilds Railway side” which contains the elevated WR SW Plains Line platform and “Qingli Railways side” which contains the Lakeside Mystic Line and Cin Gyun Line due to the existing WR side not allowing for expansions.
Unless specified, the elevated WR SW Plains Line/Overground Lake City station will be referred as “WR Side”, and the underground Lakeside Mystic Line/Cin Gyun Line Lake City station will be referred as “QR Side”.
History
- 8 August, 2022: WR side Station starts construction. Navi (Wilds Railway) is responsible for this work. The elevated station is said to be “Ma On Shan Line style”. A few advertisements boards are posted on Platform 1 and are removed later.
- Unknown August, 2022: QR side Station starts construction. Superidolabc is responsible for this work at the moment which is still the LDR Land Side Line. In view of his expulsion the station is then managed by Tea, and the LDR Land Side Line is replaced by Lakeside Mystic Line.
- Unknown November, 2022: LudwigTails asked for permission for his first line to be terminated there and is agreed, therefore the Cin Gyun Line platforms are built underneath Lakeside Mystic Line platforms in QR side Station.
- 4 December, 2022: The Circulator IP, the first “Airplane” line in the server, connects Lake City Station with an separated airdock next to the RV MPL 85.
Layout
TODO
