zh:mtr_letsplay:kwong_chow_station
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| zh:mtr_letsplay:kwong_chow_station [2025/10/10 18:13] – [Timeline] mc_xiaomiao001 | zh:mtr_letsplay:kwong_chow_station [2025/10/10 18:41] (current) – removed Balazs | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | FIXME **This page is not fully translated, yet. Please help completing the translation.**\\ //(remove this paragraph once the translation is finished)// | ||
| - | ====== Kwong Chow Station ====== | ||
| - | |||
| - | |||
| - | <WRAP right> | ||
| - | |||
| - | | | ||
| - | | @#EB7AE9: || | ||
| - | | @#FFDA33: || | ||
| - | | {{/ | ||
| - | ^ | ||
| - | | **Operator** | [[/ | ||
| - | | **Lines** | [[/ | ||
| - | | ::: | [[/ | ||
| - | | **Owner** | [[mtr_community: | ||
| - | | **Region** | [[mtr_letsplay: | ||
| - | | **站台** | 4 | | ||
| - | | **Tracks** | 4 | | ||
| - | | **Coordinates** | (-2130, 2304) | | ||
| - | ^ | ||
| - | | **Type** |地下| | ||
| - | | **楼层** | 3 | | ||
| - | | **站台楼层** | 2 | | ||
| - | | **Step-Free Accessible** | Yes | | ||
| - | | **车站码** | KWC | | ||
| - | | **开通时间** | 22 December, 2022 | | ||
| - | | **Electrification** | 25kV Overhead Cable AC (WIP)\\ //(Line 1 (Meyan Line) Phase 1)// | | ||
| - | | ::: | 1.5kV Overhead Cable DC (WIP)\\ //(Line 2 (Kwong Pak Kwun Line))// | | ||
| - | |||
| - | </ | ||
| - | **Kwong Chow Station** (Chinese: // | ||
| - | The station gets featured for a couple of times in Jonathan' | ||
| - | |||
| - | =====历史=======当[[/ | ||
| - | ====时间线= = = = * 2022年7月下旬: | ||
| - | ===== Layout ===== | ||
| - | |||
| - | Not counting exits, there are a total of 3 floors in the station. **L1** is concourse and is separated into north and south part not directly accessible to each other, due to [[/ | ||
| - | |||
| - | Platforms 1, 3 stack on top of platforms 2, 4 on the two sides. In between is the core structure. Under the concourse on two ends, it consists of walls, passages, staircases and escalators. Under the canal, it has the famous high ceiling spacious and open design, with chandeliers hung between the pillars. To facilitate the interchange at the upper platforms, a passageway in the middle is built to further connect up platforms 1 and 3. And since future interchange between [[mtr_letsplay: | ||
| - | |||
| - | One lift is serving between north concourse and the platforms, while another is serving between south concourse and the platforms. The lift serving south concourse is larger due to a higher anticipated passengers flow and capacity needed. | ||
| - | |||
| - | <WRAP left> | ||
| - | |||
| - | | **U1** |**South Side Exits**|**North Side Exits**| | ||
| - | | ::: | Exit A2 | | | ||
| - | | **G** |**South Side Exits** | **North Side Exits** | | ||
| - | | ::: | Exit A1, Exit B | Exit C, Exit D | | ||
| - | | **L1** | **South Concourse** | **North Concourse** | | ||
| - | | ::: | Customer Service Centre, Tickets || | ||
| - | | **L2** | **Upper Platforms** || | ||
| - | | ::: | @#EB7AE9: || | ||
| - | | ::: | Platform **1** | [[mtr_letsplay: | ||
| - | | ::: | | ||
| - | | ::: | Platform **3** | <- [[mtr_letsplay: | ||
| - | | ::: | @#FFDA33: || | ||
| - | | **L3** | **Lower Platforms**|| | ||
| - | | ::: | @#EB7AE9: || | ||
| - | | ::: | Platform **2** | <- [[mtr_letsplay: | ||
| - | | ::: | | ||
| - | | ::: | Platform **4** | [[mtr_letsplay: | ||
| - | | ::: | @#FFDA33: || | ||
| - | |||
| - | </ | ||
| - | |||
| - | ===== Exits ===== | ||
| - | |||
| - | * A: BDark Kwong Chow Castle | ||
| - | * A1: BDark Kwong Chow Castle | ||
| - | * A2: Yu Kwong Village | ||
| - | * B: Sai Wan {{mtr: | ||
| - | * C: BDark' | ||
| - | * C1: BDark' | ||
| - | * C2: Kwong Chow North Area | ||
| - | * D: Kwong Chow Pier {{mtr: | ||
| - | * D1: Kwong Chow Pier | ||
| - | * D2: Welcome Cape | ||
| - | |||
| - | ===== Train Services ===== | ||
| - | |||
| - | Passengers may take Line 1 (Meyan Line) Phase 1 heading towards Tai Po, Sakura Stream Area, Northern Snowland , Mesa, Zuidbaai, East North Tundra and Mei Foo Wan or Line 2 (Kwong Pak Kwun Line) heading towards Spawn Area, Coast City, Toitoi, Bayside Area and Ostania. Incoming passengers can change to another line to continue their journey on the opposite platform. Passengers going from and to Line 2 (Kwong Pak Kwun Line) and Line 1 (Meyan Line) stations southwards/ | ||
| - | |||
| - | | **[[mtr_letsplay: | ||
| - | | @#EB7AE9: | | ||
| - | | [[/ | ||
| - | |||
| - | | **[[mtr_letsplay: | ||
| - | | @#FFDA33: | | ||
| - | | **Kwong Chow** - [[/ | ||
zh/mtr_letsplay/kwong_chow_station.1760120037.txt.gz · Last modified: 2025/10/10 18:13 by mc_xiaomiao001