User Tools

Site Tools


zh:mtr_letsplay:kwong_chow_station

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
zh:mtr_letsplay:kwong_chow_station [2025/10/10 18:13] – [Timeline] mc_xiaomiao001zh:mtr_letsplay:kwong_chow_station [2025/10/10 18:41] (current) – removed Balazs
Line 1: Line 1:
-FIXME **This page is not fully translated, yet. Please help completing the translation.**\\ //(remove this paragraph once the translation is finished)// 
  
-====== Kwong Chow Station ====== 
- 
- 
-<WRAP right> 
- 
-|   @#EB4881:  <color white>**光州**\\ **광주**</color>   || 
-| @#EB7AE9: || 
-| @#FFDA33: || 
-|  {{/kwc_1.png?400}}\\ //Platforms,  Escalators to north concourse//\\ //(taken on 21 January, 2024)//  || 
-^   **Overview**   ^^ 
-| **Operator** | [[/west_lake_transport_authority|West Lake Transport Authority]] | 
-| **Lines** | [[/wlt_line_1|1号线(美兰线)一期]] | 
-| ::: | [[/wlt_line_2|2号线(光北观)]] | 
-| **Owner** | [[mtr_community:建造者:bdark000|BDark000]] | 
-| **Region** | [[mtr_letsplay:west_lake_area|West Lake]] | 
-| **站台** | 4 | 
-| **Tracks** | 4 | 
-| **Coordinates** | (-2130, 2304) | 
-^   **车站**   ^^ 
-| **Type** |地下| 
-| **楼层** | 3 | 
-| **站台楼层** | 2 | 
-| **Step-Free Accessible** | Yes | 
-| **车站码** | KWC | 
-| **开通时间** | 22 December, 2022 | 
-| **Electrification** | 25kV Overhead Cable AC (WIP)\\ //(Line 1 (Meyan Line) Phase 1)// | 
-| ::: | 1.5kV Overhead Cable DC (WIP)\\ //(Line 2 (Kwong Pak Kwun Line))// | 
- 
-</WRAP> 
-**Kwong Chow Station** (Chinese: //光州站//) is a station in the [[mtr_letsplay:west_lake_area|West Lake Area]] built by [[mtr_community:staff:bdark000|BDark000]] on behalf of [[/west_lake_transport_authority|West Lake Transport Authority (WLT)]]. It is the western terminus of [[/wlt_line_2|Line 2 (Kwong Pak Kwun Line)]] and a mid-way stop of [[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]].   
-The station gets featured for a couple of times in Jonathan's videos((Including [[https://youtu.be/viNwYsPHCMM?si=CPl1iiftCtc7TQSZ|Let's Play S2 Finale]] //(starting from 1:07:30)//, [[https://youtu.be/iWnGgoS7Dhc?si=6a7sSB-QkK0uO_YZ|5 Amazing Minecraft Train Stations]] //(starting from 12:12)// and [[https://youtu.be/mlC4KZOtOEM?si=FBrL7nl0qZpJz1ZH|Let's Play S3E25]] //(starting from 54:18)// )).  
- 
-=====历史=======当[[/west_lake_transport_authority|WLT]]关于[[/west _lake_area |西湖区]]交通的第一个计划出台时,现在广州站附近的地区已经计划至少有一个车站为住宅服务。由于一开始建议线路为轻轨,因此计划在溪流的北侧和南侧分别设置两个车站,而不是一个车站(大致位于现在的位置[[/kwong_show_statation#布局|北大厅]]和[[/khong_show_station#布局|南大厅]])。名字**Kwong Chow**(源自粤语发音[wp>hanja|hanja]])光州 )) 以前只分配给溪流以北的地区,因为地形看起来像[[wp>韩国|朝鲜半岛]],在半岛南端选择一个与景观相对应的城市名称([[wp>Busan| Busan]]更为人所知,但没有选择,因为“san”(Hanja山) 字面意思是山,但溪北不是丘陵)。与此同时,**Chai Chow**(从粤语发音[wp>hanja|hanja]]中屈服)濟州)) 最初被选为溪流以南地区的名字,因为它位于半岛的南部,被水体隔开。在规划的轻轨线路升级为快速交通后,该地区不再足以支持两个车站。因此,它们被合并为一个,**光州**被选中,**柴周**被删除。计划为站台结构提供广阔的空间,即两个至少8米高、相距19米的侧站台,为[[/wlt_line_1| 1号线(梅延线)]](当时称为wlt 1号线)服务。中间部分分为位于分体式侧平台上方4m和下方4m的夹层。一对由[[wlt_line_2| 2号线(广白线)]](当时称为wlt 2号线)的叠置轨道从中间通过,并形成两个双侧侧式月台。在该设计中,从2号线下车的乘客可以从任一侧下车,换乘相反两个方向的1号线列车,或者登上自动扶梯、楼梯或电梯下车。相反,从1号线双向换乘的乘客可以享受到2号线的“跨站台换乘”。不幸的是,经过对轨道工程的一些研究,由于1号线和2号线都是在车站北部从地上到地下,坡度相当陡。1号线南行隧道很难在2号线隧道的两层上下正确穿越并到达指定位置,然后在车站南侧再次穿越2号线的隧道。1号线轨道还需要为往返[[/chung_kwo_ok_depot|钟鼓角车辆段]]的列车留出空间。该计划被认为过于复杂,不可行,因此被放弃了。尽管为乘客带来最大便利的计划没有实施,但设计中的开放性概念仍然存在。WLT转而以现实生活中的九广铁路[[wp>沙田至中环线|沙田至中铁线]]的设计为参考,包括现在的[[wp>Tai_Wai_Station |大围站]]和拟议的红磡站新站台。它们都有一个中空的上层设计。上层可以看到下层,反之亦然。**光州站**重新设计为双层站台,灵感来自九广铁路公司的开放性和两端的大厅,西有1号线轨道,东有2号线轨道。消除了轨道相互交叉的所有可能性,使线路保持简单。同时,根据[[/ck_and_wyi_plan|钟鼓角和黄叶岛发展规划]]以及其他建设者从[[northern_snow_village_station|北雪村]]站到[[/birch_hill_station|桦木山]]站的更多开发,保留了2号线和1号线光州以北路段之间的跨站台换乘,放弃了1号线光州以南路段。 
-====时间线= = = = * 2022年7月下旬:西湖区交通初步方案出来了。车站尚未确定,但计划在现在的光州站附近建两个。* 2022年8月初:WLT确认只建设一个**光州* *站。* 2022年9月初:车站开始规划1号线分离式侧站台和2号线堆叠式双面侧站台方案。* 2022年10月中旬:车站布局修改为现在的样子。* 2022年12月22日:车站对公众开放,WLT 1号线一期从桦树山站延伸至该站。* 2023年1月初:在d出口增加一个新的电梯出口后,无障碍通道现已完全可用。2023年6月24日:2号线(光北观线)(当时称为2号线(光州-北海岸线))在该站和[[/西_莫_岛_站|西_莫岛]]站之间提供班车服务(后来称为西段临时班车)。这是该站提供跨站台换乘的第一天。* 2023年12月初:楼梯小改造完成。为了更好的安全性和乘客体验,车站内的大多数楼梯都被延长,并在中间留出一小块空间。此外,为了更好地控制人群,从南大厅到1号站台的下行自动扶梯已被移除,成为楼梯的一部分。* 2024年5月18日:当线路延伸至[[/tai_po_station|Tai Po]]时,车站成为1号线(美延线)一期的中途站。 
-===== Layout ===== 
- 
-Not counting exits, there are a total of 3 floors in the station. **L1** is concourse and is separated into north and south part not directly accessible to each other, due to [[/kwong_chow_grand_canal|the Grand Canal]] in between. North part connects Exit C, D while south part connects Exit A, B. **L2** and **L3** are platforms under the canal.  
- 
-Platforms 1, 3 stack on top of platforms 2, 4 on the two sides. In between is the core structure. Under the concourse on two ends, it consists of walls, passages, staircases and escalators. Under the canal, it has the famous high ceiling spacious and open design, with chandeliers hung between the pillars. To facilitate the interchange at the upper platforms, a passageway in the middle is built to further connect up platforms 1 and 3. And since future interchange between [[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line)]] south of Kwong Chow and [[mtr_letsplay:wlt_line_2|Line 2 (Kwong Pak Kwun Line)]] requires going down from upper platforms to lower platforms, a staircase and two escalators connecting the two floors are also built.  
- 
-One lift is serving between north concourse and the platforms, while another is serving between south concourse and the platforms. The lift serving south concourse is larger due to a higher anticipated passengers flow and capacity needed.  
- 
-<WRAP left> 
- 
-| **U1** |**South Side Exits**|**North Side Exits**| 
-| ::: | Exit A2 | | 
-| **G** |**South Side Exits** | **North Side Exits** |  
-| ::: | Exit A1, Exit B | Exit C, Exit D |  
-| **L1** | **South Concourse** | **North Concourse** | 
-| ::: | Customer Service Centre, Tickets || 
-| **L2** | **Upper Platforms** || 
-| ::: | @#EB7AE9: || 
-| ::: | Platform **1** | [[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]] to [[mtr_letsplay:mesa_station|Mesa]] / Mei Foo Wan -> (Doors open on the right) | 
-| ::: |   Island Platform   || 
-| ::: | Platform **3** | <- [[mtr_letsplay:wlt_line_2|Line 2 (Kwong Pak Kwun Line)]] terminating (Doors open on the right)| 
-| ::: | @#FFDA33: || 
-| **L3** | **Lower Platforms**|| 
-| ::: | @#EB7AE9: || 
-| ::: | Platform **2** | <- [[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]] to [[/tai_po_station|Tai Po]] (Doors open on the left) | 
-| ::: |   Island Platform   || 
-| ::: | Platform **4** | [[mtr_letsplay:wlt_line_2|Line 2 (Kwong Pak Kwun Line)]] to [[/makki_memorial_village_station|Makki Memorial Village]] / [[/ostania_station|Ostania]] -> (Doors open on the left) | 
-| ::: | @#FFDA33: || 
- 
-</WRAP> 
- 
-===== Exits ===== 
- 
-  * A: BDark Kwong Chow Castle 
-    * A1: BDark Kwong Chow Castle 
-    * A2: Yu Kwong Village 
-  * B: Sai Wan {{mtr:elevator2.png?24x24}} 
-  * C: BDark's Bridge 
-    * C1: BDark's Bridge 
-    * C2: Kwong Chow North Area 
-  * D: Kwong Chow Pier {{mtr:elevator2.png?24x24}} 
-    * D1: Kwong Chow Pier 
-    * D2: Welcome Cape 
- 
-===== Train Services ===== 
- 
-Passengers may take Line 1 (Meyan Line) Phase 1 heading towards Tai Po, Sakura Stream Area, Northern Snowland , Mesa, Zuidbaai, East North Tundra and Mei Foo Wan or Line 2 (Kwong Pak Kwun Line) heading towards Spawn Area, Coast City, Toitoi, Bayside Area and Ostania. Incoming passengers can change to another line to continue their journey on the opposite platform. Passengers going from and to Line 2 (Kwong Pak Kwun Line) and Line 1 (Meyan Line) stations southwards/eastwards need to go down one floor.  
- 
-|  **[[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]]**  | 
-| @#EB7AE9: | 
-|  [[/mesa_station|Mesa]] - //<color #cccccc>Chi Chuk</color>// - //<color #cccccc>Ying Mo</color>// - //<color #cccccc>Tung Yuen</color>// - Northern Snow Village - [[/hung_ngai_tung_station|Hung Ngai Tung]] - [[/sakura_stream_junction_station|Sakura Stream Junction]] - [[mtr_letsplay:providence_station|Providence]] - [[/birch_hill_station|Birch Hill]] - [[mtr_letsplay:chung_kwo_kok_station|Chung Kwo Kok]] - **Kwong Chow** - //<color #cccccc>Yuen Chow Kok</color>// - [[/tai_po_station|Tai Po]]  | 
- 
-|  **[[mtr_letsplay:wlt_line_2|Line 2 (Kwong Pak Kwun Line)]]**  | 
-| @#FFDA33: | 
-|  **Kwong Chow** - [[/sha_tsui_station|Sha Tsui]] - //<color #cccccc>West Lake</color>// - [[/sai_mo_island_station|Sai Mo Island ]] - //<color #cccccc>See Tsuen</color>// - [[/spawn_station|Spawn]] - Three Rivers - [[/forest_peaks_station|Forest Peaks]] - Coast City - //<color #cccccc>Dragon Loop Centre</color>// - Ōrākei West - Toitoi - Makki Memorial Village | 
zh/mtr_letsplay/kwong_chow_station.1760120037.txt.gz · Last modified: 2025/10/10 18:13 by mc_xiaomiao001