User Tools

Site Tools


mtr_letsplay:wlt_line_3

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
mtr_letsplay:wlt_line_3 [2026/09/11 07:31] – [Line 3 (Cyan Gray Line)] Reduce confusion in operating speed section BDark000mtr_letsplay:wlt_line_3 [2026/10/29 02:05] (current) – [Line 3 (Cyan Gray Line)] Adjust average speed figure BDark000
Line 49: Line 49:
 | **Gauge** | 1435 mm || | **Gauge** | 1435 mm ||
 | **Electrification** | 1.5 kV DC Overhead(WIP) || | **Electrification** | 1.5 kV DC Overhead(WIP) ||
-| **Operating**\\ **Speed** | Average: | 55 km/h (15.3 m/s) //All Stops//\\ 61 km/h (17.0 m/s) //CG Express// |+| **Operating**\\ **Speed** | Average: | 58 km/h (16.1 m/s) //All Stops//\\ 64 km/h (17.8 m/s) //CG Express// |
 | ::: | Maximum:| 140 km/h (38.9 m/s) | | ::: | Maximum:| 140 km/h (38.9 m/s) |
 | **Signalling**\\ **System** | Minecraft Transit Railway Signals 4003((4003 refers to being the fourth update on signals and speed limits since 4.0.0 betas and pre-releases))\\ //([[wp>European_Train_Control_System#Level_3|ETCS Level 3]] / [[wp>automatic_train_control#ATACS|ATACS]] equivalent)//|| | **Signalling**\\ **System** | Minecraft Transit Railway Signals 4003((4003 refers to being the fourth update on signals and speed limits since 4.0.0 betas and pre-releases))\\ //([[wp>European_Train_Control_System#Level_3|ETCS Level 3]] / [[wp>automatic_train_control#ATACS|ATACS]] equivalent)//||
Line 64: Line 64:
  
 ===== History ===== ===== History =====
 +
 +Originally, Line 1 and Line 2 of the [[/west_lake_transport_authority|WLT]] were planned to have a red colour and a blue colour for the line colour, as a “red and blue” colour combination are generally used in couples. But before the lines were added in the server, there was already a revision to the palette as the planning of Line 3 had started. 
 +\\ Then, a “CMY” palette is picked instead for the three WLT lines((The “red and blue” colour combination is kept in the WLT logo, and the green colour complement is used for most WLT services outside rapid transit lines)), and as Line 1 and 2 are picked as magenta and yellow respectively, Line 3 picks the cyan colour.
 +
 +Line 1 and Line 2 are more like “local services” with station distance <1 km in average around West Lake Area. Hence, Line 3 takes a “regional services” approach with minimum station distance of 1 km. The “Cyan Car” premium seating feature is also confirmed at that moment. 
 +\\ Unlike Line 1 and Line 2 using stations or serving area, Line 3 uses the line colour “Cyan Gray” itself as the line name as it gives out the branding of the line which is special in WLT or even the LPS.
 +
 +Line 3 (Cyan Gray Line) has been planned to go north-south at the eastern West Lake Area, where a fast connection between Line 1 and Line 2 will get better off so that passengers do not need to go around through Line 1 sections between Kwong Chow and Chik Shek Wan with a slow travelling speed due to “local services” approach and also trains running on tight curves. 
 +\\ As the planning of Hana-Koshi Line was already posted and it would serve a large southwestern region before entering the eastern edge of West Lake Area and terminating at Sai Mo Island, it would be great if Hana-Koshi Line passengers could enjoy a convenient interchange with Line 3 (Cyan Gray Line) if they want to continue travelling north. Therefore, southern terminus of Line 3 is decided to be Mita-Shiro. 
  
 ==== Timeline ==== ==== Timeline ====
 +
 +  * 18 December, 2022: Initial proposal of the line (Llanmara (Saint Devota) - Mita-Shiro) posted.
 +  * 21 May, 2024: Chung Kong station is added for interchange with [[/wlt_line_1|Line 1 (Meyan Line) Mei Foo Wan Branch / Northern Circular Link]].
 +  * 21 October, 2024: Kong Wan station is cancelled due to difficulties in construction and anticipated low usage.
 +  * : Imperial Bay station is added for interchange with Overground, [[/crosscountry|CrossCountry]] and CFR for further northbound connections to Reston and Einsburg, Liskeard or Montauk.
 +  * 27 January, 2026: Proposal of the southern extension (Mita-Shiro - Wu Chau) posted and started construction.
 +  * 7 September, 2026: Tracks are connected and test trains start running.
 +  * 14 October, 2026: Opened manual driving preview quest.
  
 ===== Rolling Stocks ===== ===== Rolling Stocks =====
Line 74: Line 91:
  
 ===== Stations ===== ===== Stations =====
 +
mtr_letsplay/wlt_line_3.1789111884.txt.gz · Last modified: 2026/09/11 07:31 by BDark000