mtr_letsplay:wlt_line_3
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| mtr_letsplay:wlt_line_3 [2025/01/02 11:56] – Better illustration of signalling system BDark000 | mtr_letsplay:wlt_line_3 [2026/10/29 02:05] (current) – [Line 3 (Cyan Gray Line)] Adjust average speed figure BDark000 | ||
|---|---|---|---|
| Line 3: | Line 3: | ||
| <WRAP right> | <WRAP right> | ||
| - | ^ Line 3 (Cyan Gray Line)\\ 三號 (青灰) 綫 |^ | + | ^ Line 3 (Cyan Gray Line)\\ 三號 (青灰) 綫 |
| - | | @# | + | | @# |
| - | | || | + | | |
| - | ^ **Overview** | + | ^ **Overview** |
| - | | **Abbreviation** | L3 (CGL) | | + | | **Abbreviation** | L3 (CGL) || |
| - | | **Status** | Work in Progress\\ //(Llanmara (Saint Devota) - Mita-Shiro)// | | + | | **Status** | Work in Progress\\ //(Llanmara (Saint Devota) - Wu Chau)// || |
| - | | **Owner** | [[/ | + | | **Owner** | [[/ |
| - | | **Locale** | Llanmara\\ Greenland\\ West Denthrope (Mesa)\\ Denthrope\\ | + | | **Locale** | Llanmara\\ Greenland\\ West Denthrope (Mesa)\\ Denthrope\\ |
| - | | **Termini** | [[/ | + | | **Termini** | [[/ |
| - | | **Connecting**\\ **Lines** | @#BB492B:[[/ | + | | **Connecting**\\ **Lines** | @#BB492B:[[delphox_line|Cinderace Line]] |
| - | | ::: | @#008000:<color white> | + | | ::: | @#CC1A21:< |
| - | | ::: | @# | + | | ::: | @# |
| - | | ::: | @# | + | | ::: | @# |
| - | | ::: | @# | + | | ::: | @# |
| - | | ::: | @# | + | | ::: | @# |
| - | | ::: | @#6B4799:<color white> | + | | ::: | @# |
| - | | ::: | @#F09191: Hana-Koshi Line | | + | | ::: | @# |
| - | | ::: | @#19dfde: Lakeside Mystic Line | | + | | ::: | @# |
| - | | ::: | @# | + | | ::: | @# |
| - | | **Stations** | 12 | | + | | ::: | @# |
| - | ^ Service | + | | ::: | @#196920:<color white> |
| - | | **Operator(s)** | [[/ | + | | ::: | @# |
| - | | **Service Hours** | TBD | | + | | ::: | @# |
| - | | **Frequency** | TBD | | + | | ::: | @# |
| - | | **Depot** | [[/suet_yuen_depot|Suet Yuen Depot]] | | + | | ::: | @# |
| - | | **Rolling Stock** | [[/ | + | | ::: | @# |
| - | ^ Technical | + | | ::: | @# |
| - | | **Line Length** | TBC | | + | | ::: | @#9450A1:<color white>[[/ |
| - | | **Number of**\\ **Tracks** | Double Track | | + | | ::: | @# |
| - | | **Gauge** | 1435 mm | | + | | ::: | @#F09191: Hana-Koshi Line || |
| - | | **Electrification** | 1.5 kV DC Overhead | | + | | ::: | @#19dfde: Lakeside Mystic Line || |
| - | | **Operating**\\ **Speed** | Average: | + | | ::: | @# |
| - | | **Signalling**\\ **System** | MTR Mod's Signalling\\ | + | | ::: | @#FF7F27: Northern Circle Line || |
| - | ^ Route Map |^ | + | | ::: | @# |
| - | | || | + | | **Stations** | 15 || |
| + | ^ Service | ||
| + | | **Operator(s)** | [[/ | ||
| + | | **Service Hours** | TBD || | ||
| + | | **Frequency** | TBD || | ||
| + | | **Depot** | [[/suet_sai_depot|Suet Sai Depot]] | ||
| + | | **Rolling Stock** | [[/ | ||
| + | ^ Technical | ||
| + | | **Line Length** | ~27.8 km || | ||
| + | | **Number of**\\ **Tracks** | Double Track || | ||
| + | | **Gauge** | 1435 mm || | ||
| + | | **Electrification** | 1.5 kV DC Overhead(WIP) || | ||
| + | | **Operating**\\ **Speed** | Average: | ||
| + | | ::: | Maximum:| 140 km/h (38.9 m/s) | | ||
| + | | **Signalling**\\ **System** | Minecraft Transit Railway Signals 4003((4003 refers to being the fourth update on signals and speed limits since 4.0.0 betas and pre-releases))\\ // | ||
| + | ^ Route Map | ||
| + | | | ||
| </ | </ | ||
| - | **Line 3 (Cyan Gray Line)** (Chinese: //三號 (青灰) 綫//), is a rapid transit service currently under construction. It will be operated by [[/ | + | **Line 3 (Cyan Gray Line)** (Chinese: //三號 (青灰) 綫//), is a rapid transit service currently under construction. It will be operated by [[/ |
| - | The line will connect up Llanmara, Greenland, West Denthrope (Mesa), Denthrope, | + | The line will connect up Llanmara, Greenland, West Denthrope (Mesa), Denthrope, |
| + | |||
| + | The <color /# | ||
| + | |||
| + | ===== History ===== | ||
| + | |||
| + | Originally, Line 1 and Line 2 of the [[/ | ||
| + | \\ Then, a “CMY” palette is picked instead for the three WLT lines((The “red and blue” colour combination is kept in the WLT logo, and the green colour complement is used for most WLT services outside rapid transit lines)), and as Line 1 and 2 are picked as magenta and yellow respectively, | ||
| + | |||
| + | Line 1 and Line 2 are more like “local services” with station distance <1 km in average around West Lake Area. Hence, Line 3 takes a “regional services” approach with minimum station distance of 1 km. The “Cyan Car” premium seating feature is also confirmed at that moment. | ||
| + | \\ Unlike Line 1 and Line 2 using stations or serving area, Line 3 uses the line colour “Cyan Gray” itself as the line name as it gives out the branding of the line which is special in WLT or even the LPS. | ||
| + | |||
| + | Line 3 (Cyan Gray Line) has been planned to go north-south at the eastern West Lake Area, where a fast connection between Line 1 and Line 2 will get better off so that passengers do not need to go around through Line 1 sections between Kwong Chow and Chik Shek Wan with a slow travelling speed due to “local services” approach and also trains running on tight curves. | ||
| + | \\ As the planning of Hana-Koshi Line was already posted and it would serve a large southwestern region before entering the eastern edge of West Lake Area and terminating at Sai Mo Island, it would be great if Hana-Koshi Line passengers could enjoy a convenient interchange with Line 3 (Cyan Gray Line) if they want to continue travelling north. Therefore, southern terminus of Line 3 is decided to be Mita-Shiro. | ||
| + | |||
| + | ==== Timeline ==== | ||
| + | |||
| + | * 18 December, 2022: Initial proposal of the line (Llanmara (Saint Devota) - Mita-Shiro) posted. | ||
| + | * 21 May, 2024: Chung Kong station is added for interchange with [[/ | ||
| + | * 21 October, 2024: Kong Wan station is cancelled due to difficulties in construction and anticipated low usage. | ||
| + | * : Imperial Bay station is added for interchange with Overground, [[/ | ||
| + | * 27 January, 2026: Proposal of the southern extension (Mita-Shiro - Wu Chau) posted and started construction. | ||
| + | * 7 September, 2026: Tracks are connected and test trains start running. | ||
| + | * 14 October, 2026: Opened manual driving preview quest. | ||
| + | |||
| + | ===== Rolling Stocks ===== | ||
| + | |||
| + | ===== Operations ====== | ||
| + | |||
| + | ===== Future Plans ===== | ||
| + | |||
| + | ===== Stations ===== | ||
| - | The <color # | ||