User Tools

Site Tools


mtr_letsplay:wlt_line_2

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
mtr_letsplay:wlt_line_2 [2026/08/02 05:55] – [Merge of Two Lines] Change some wordings BDark000mtr_letsplay:wlt_line_2 [2026/08/02 06:08] (current) – [Rolling Stocks] Supplement Detail and change some wordings BDark000
Line 149: Line 149:
 ===== Rolling Stocks ===== ===== Rolling Stocks =====
  
-Similar to [[/wlt_line_1#rolling_stocks|Line 1 (Meyan Line)]], since turn radius is small between West Lake station and See Tsuen station in the final zig-zag lining plan, 4-door trains are used instead of 5-door trains that are currently running on North Coast Line. Original 6 sets of 5-door C-Train with railway vision livery has been rebuilt to 5 sets of 4-door C-Train. The first set of rebuilt C-Train has already transported to Chik Shek Wan Depot and started its passengers service on the shuttle between Kwong Chow and Sai Mo Island. 2 more sets of C-Train has also started passengers service after the first stage of merge. 1 more set of C-Train started regular service from 2024 December onwards for more frequent trains. The final set of C-Train started regular service since trains enter eastern extension section for testing. +Similar to [[/wlt_line_1#rolling_stocks|Line 1 (Meyan Line)]], since turn radius is small between West Lake station and See Tsuen station in the final zig-zag lining plan, 4-door (Small) Type-B EMU trains are used instead of 5-door Type-A EMU trains that are currently running on North Coast Line. Original 6 sets of C-Train with railway vision livery has been rebuilt to 5 sets of C-Train (Small). The first set of rebuilt C-Train has already transported to Chik Shek Wan Depot and started its passengers service on the shuttle between Kwong Chow and Sai Mo Island. 2 more sets of C-Train has also started passengers service after the first stage of merge. 1 more set of C-Train started regular service from 2024 December onwards for more frequent trains. The final set of C-Train started regular service since trains enter eastern extension section for testing. 
  
 There are also 5((1 set of M-Train (A209/A200) is changed back to its look before refurbishment along with Camshaft resistors traction control)) sets of M-Train (phase 2A) and 10 sets of K-Train serving passengers.  There are also 5((1 set of M-Train (A209/A200) is changed back to its look before refurbishment along with Camshaft resistors traction control)) sets of M-Train (phase 2A) and 10 sets of K-Train serving passengers. 
Line 155: Line 155:
 Originally, the fleet was planned to include 3 sets of Shanghai Metro Trains 01A06 previously running on the North Coast Line. However, as the trains are too tall for the tunnels, they are planned to retire instead as soon as North Coast Line merges with WLT Line 2. Alternatively, 5 sets of phase 2C M-Train will join the fleet, but with an overhaul in the propulsion system by Alstom, as DC motor is harder to maintenance and consumes more electricity. 1 set of them has already started regular service since 2024 December, another set has started regular service since 2025 April. Remaining 3 sets started regular service since trains enter eastern extension section for testing. Originally, the fleet was planned to include 3 sets of Shanghai Metro Trains 01A06 previously running on the North Coast Line. However, as the trains are too tall for the tunnels, they are planned to retire instead as soon as North Coast Line merges with WLT Line 2. Alternatively, 5 sets of phase 2C M-Train will join the fleet, but with an overhaul in the propulsion system by Alstom, as DC motor is harder to maintenance and consumes more electricity. 1 set of them has already started regular service since 2024 December, another set has started regular service since 2025 April. Remaining 3 sets started regular service since trains enter eastern extension section for testing.
  
-Due to the platforms in [[/cyanex|Cyan Twilight Line]]((80m long)) can only accomodate 4-car 4-door trains, trains through-running to Cyan Twilight Line and Bond Line need to consist of only 4 cars rather than 5 cars. For promotion of direct access to the Sightseeing Line network, Cyanex Rapid Transit [[/chi|CXD104]] (previously running on Sightseeing Line, replaced by CXD107) is chosen to be the sole rolling stock used for 4-car trains. The first batch of 15 sets 4-car trains are replaced with ABB traction, for diversifying the traction brand used and also for softer traction sound. The last batch of 10 sets 4-car trains are equipped with Bombardier //Mitrac (TC1110 series)// traction, similar to the one on most Chinese trains built in 2000s or 2010s with Bombardier designed traction. +Due to the platforms in [[/cyanex|Cyan Twilight Line]] can only accomodate 4B train formation, trains through-running to Cyan Twilight Line and Bond Line need to consist of only 4 cars rather than 5 cars. For promotion of direct access to the Sightseeing Line network, Cyanex Rapid Transit [[/chi|CXD104]] (previously running on Sightseeing Line, replaced by CXD107) is chosen to be the sole rolling stock used for 4-car trains. The first batch of 15 sets 4-car trains are replaced with ABB traction, for diversifying the traction brand used and also for softer traction sound. The last batch of 10 sets 4-car trains are equipped with Bombardier //Mitrac (TC1110 series)// traction, similar to the one on most Chinese trains built in 2000s or 2010s with Bombardier designed traction. 
  
 ^  Car Formation of M-Trains (phase 2A)  ||||^ ^  Car Formation of M-Trains (phase 2A)  ||||^
mtr_letsplay/wlt_line_2.1785650131.txt.gz · Last modified: 2026/08/02 05:55 by BDark000