mtr_letsplay:wlt_line_2
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| mtr_letsplay:wlt_line_2 [2026/08/02 04:30] – [Line 2 (Kwong Pak Kwun Line)] Various udpates; see change log BDark000 | mtr_letsplay:wlt_line_2 [2026/08/02 06:08] (current) – [Rolling Stocks] Supplement Detail and change some wordings BDark000 | ||
|---|---|---|---|
| Line 89: | Line 89: | ||
| The line is first known as the branch of earliest WLT railway services plan, connecting up [[/ | The line is first known as the branch of earliest WLT railway services plan, connecting up [[/ | ||
| - | It was originally planned to connect [[/ | + | It was originally planned to connect [[/ |
| - | Later renovated by Jonathan and now known as Zone A | + | |
| - | )) for Line 2 to terminate. The proposed route as well as location of [[/ | + | |
| - | Before the line is fully ready, a special shuttle service already started between Sai Mo Island station and [[/ | + | Before the line is fully ready, a special shuttle service already started between Sai Mo Island station and [[/ |
| - | Temporary bus route which will be renamed to 4M and rerouted to serve Museum | + | |
| - | )) serves as the replacement for transport service to Kwong Chow. | + | |
| Line 2 (Kwong Chow - North Coast Line) W. Section Temp Shuttle no longer has no intermediate stops after Sha Tsui station has finished its construction and opens to the public. | Line 2 (Kwong Chow - North Coast Line) W. Section Temp Shuttle no longer has no intermediate stops after Sha Tsui station has finished its construction and opens to the public. | ||
| Line 103: | Line 99: | ||
| ==== Merge of Two Lines ==== | ==== Merge of Two Lines ==== | ||
| - | The idea of merging WLT Line 2 and [[/ | + | The idea of merging WLT Line 2 and [[/ |
| - | Running between Spawn and Toitoi, now discontinued | + | |
| - | )) was using only one platform for terminating and outbound trains, causing confusion to passengers and occasional waiting outside the station. There were no independent sections for trains to wait, hence North Coast Line services were also affected. | + | |
| - | Feasibility of merging, i.e., the compatibility of two lines, is soon studied. Since WLT Line 2 and North Coast Line are using trains with the same length(( | + | Feasibility of merging, i.e., the compatibility of two lines, is soon studied. Since WLT Line 2 and North Coast Line are using trains with the same length((4A/5B train formation, |
| - | 100m | + | |
| - | )) and door spacing(( | + | |
| - | Ex-MTR trains door spacing | + | |
| - | )), the merge is likely to be successful. The main difference to mitigate is only the [[wp> | + | |
| Merging saves the platform for turning back North Coast Line trains, giving it to AT Metro 2209 service terminating trains. Then, the congestion will be largely relieved. The project is initiated as the early work of WLT Line 2, including the crossings and a pair of 700m tracks west of [[/ | Merging saves the platform for turning back North Coast Line trains, giving it to AT Metro 2209 service terminating trains. Then, the congestion will be largely relieved. The project is initiated as the early work of WLT Line 2, including the crossings and a pair of 700m tracks west of [[/ | ||
| - | After confirmed to merge, WLT Line 2 drops the company name WLT in its naming and adopt a [[wp> | + | After confirmed to merge, WLT Line 2 drops the company name WLT in its naming and adopt a [[wp> |
| The merge is later split into two stages because of the amount of work needed to revamp some sections. The first stage is done on 5 May 2024 which WLT Line 2 (Kwong Chow Line) trains run from Kwong Chow via Sai Mo Island and Spawn to Forest Peaks while QLR North Coast Line trains turn back at Coast City. Yet West Lake station and See Tsuen station is not yet completed or opened although trains stop at the stations. | The merge is later split into two stages because of the amount of work needed to revamp some sections. The first stage is done on 5 May 2024 which WLT Line 2 (Kwong Chow Line) trains run from Kwong Chow via Sai Mo Island and Spawn to Forest Peaks while QLR North Coast Line trains turn back at Coast City. Yet West Lake station and See Tsuen station is not yet completed or opened although trains stop at the stations. | ||
| - | Full merge is rolled out on 29 August 2024 along with new host. | + | After remaining works required and done, along with a testing in the new schedule, full merge is rolled out on 29 August 2024 along with new host. |
| ==== Throughrunning ==== | ==== Throughrunning ==== | ||
| Line 159: | Line 149: | ||
| ===== Rolling Stocks ===== | ===== Rolling Stocks ===== | ||
| - | Similar to [[/ | + | Similar to [[/ |
| There are also 5((1 set of M-Train (A209/A200) is changed back to its look before refurbishment along with Camshaft resistors traction control)) sets of M-Train (phase 2A) and 10 sets of K-Train serving passengers. | There are also 5((1 set of M-Train (A209/A200) is changed back to its look before refurbishment along with Camshaft resistors traction control)) sets of M-Train (phase 2A) and 10 sets of K-Train serving passengers. | ||
| Line 165: | Line 155: | ||
| Originally, the fleet was planned to include 3 sets of Shanghai Metro Trains 01A06 previously running on the North Coast Line. However, as the trains are too tall for the tunnels, they are planned to retire instead as soon as North Coast Line merges with WLT Line 2. Alternatively, | Originally, the fleet was planned to include 3 sets of Shanghai Metro Trains 01A06 previously running on the North Coast Line. However, as the trains are too tall for the tunnels, they are planned to retire instead as soon as North Coast Line merges with WLT Line 2. Alternatively, | ||
| - | Due to the platforms in [[/ | + | Due to the platforms in [[/ |
| ^ Car Formation of M-Trains (phase 2A) ||||^ | ^ Car Formation of M-Trains (phase 2A) ||||^ | ||
mtr_letsplay/wlt_line_2.1785645031.txt.gz · Last modified: 2026/08/02 04:30 by BDark000