mtr_letsplay:wlt_line_2
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| mtr_letsplay:wlt_line_2 [2026/02/09 01:35] – [Operations] Small Formatting Change BDark000 | mtr_letsplay:wlt_line_2 [2026/08/02 06:08] (current) – [Rolling Stocks] Supplement Detail and change some wordings BDark000 | ||
|---|---|---|---|
| Line 8: | Line 8: | ||
| ^ **Overview** | ^ **Overview** | ||
| | **Abbreviation** | L2 (KNL) | | | **Abbreviation** | L2 (KNL) | | ||
| - | | **Status** | Operational\\ //(Kwong Chow - Tsim Pei Tsui)//\\ //(Kwong Chow - Ostania)// | + | | **Status** | Operational\\ //(Kwong Chow - Tsim Pei Tsui)//\\ //(Kwong Chow - Ostania)// |
| - | | **Owner** | [[/ | + | | **Owner** | [[/ |
| - | | **Locale** | [[/ | + | | **Locale** | [[/ |
| | **Termini** | [[/ | | **Termini** | [[/ | ||
| | **Connecting**\\ **Lines** | @# | | **Connecting**\\ **Lines** | @# | ||
| | ::: | @# | | ::: | @# | ||
| | ::: | @# | | ::: | @# | ||
| - | | ::: | @#F09191:<color white>Hana-Koshi Line</ | + | | ::: | @# |
| | ::: | @# | | ::: | @# | ||
| | ::: | @# | | ::: | @# | ||
| Line 26: | Line 26: | ||
| | ::: | @# | | ::: | @# | ||
| | ::: | @# | | ::: | @# | ||
| - | | ::: | @#0075DB:<color white>AT Metro</ | + | | ::: | @#B385DE:<color white>Austrail Far East Line</ |
| + | | ::: | @# | ||
| | ::: | @# | | ::: | @# | ||
| - | | ::: | @#B385DE:AT Regional | + | | ::: | @#0075DB:<color white> |
| | ::: | @# | | ::: | @# | ||
| | ::: | @# | | ::: | @# | ||
| | ::: | @# | | ::: | @# | ||
| | ::: | @# | | ::: | @# | ||
| + | | ::: | @# | ||
| + | | ::: | @# | ||
| + | | ::: | @# | ||
| + | | ::: | @# | ||
| | ::: | @# | | ::: | @# | ||
| | ::: | @# | | ::: | @# | ||
| Line 48: | Line 53: | ||
| | ::: | @# | | ::: | @# | ||
| | ::: | @# | | ::: | @# | ||
| + | | ::: | @# | ||
| | ::: | @# | | ::: | @# | ||
| | **Stations**((Not counting through-running sections on Sightseeing Line Phase 3, 4 and Bond Line))| 15 //(5 work in progress)// | | | **Stations**((Not counting through-running sections on Sightseeing Line Phase 3, 4 and Bond Line))| 15 //(5 work in progress)// | | ||
| Line 54: | Line 60: | ||
| | **Service Hours** | 04:28 - next day 03:16 \\ // | | **Service Hours** | 04:28 - next day 03:16 \\ // | ||
| | **Frequency** | Every 1 - 8 mins | | | **Frequency** | Every 1 - 8 mins | | ||
| + | | **Ridership** | ~900/month | | ||
| | **Depot** | [[/ | | **Depot** | [[/ | ||
| | **Rolling Stock** | [[wp> | | **Rolling Stock** | [[wp> | ||
| Line 62: | Line 69: | ||
| | **Number of**\\ **Tracks** | Double Track | | | **Number of**\\ **Tracks** | Double Track | | ||
| | **Operating**\\ **Speed** | Average: 40 km/h (11.1 m/s) \\ Maximum: 105 km/h (29.2 m/ | | **Operating**\\ **Speed** | Average: 40 km/h (11.1 m/s) \\ Maximum: 105 km/h (29.2 m/ | ||
| - | | **Signalling**\\ **System** | Minecraft Transit Railway Signals 4003((4003 refers to being the fourth update on signals and speed limits since 4.0.0 betas and pre-releases))\\ // | + | | **Signalling**\\ **System** | Minecraft Transit Railway Signals 4003((4003 refers to being the fourth update on signals and speed limits since 4.0.0 betas and pre-releases))\\ // |
| ^ Route Map |^ | ^ Route Map |^ | ||
| | {{/ | | {{/ | ||
| Line 68: | Line 75: | ||
| </ | </ | ||
| - | **Line 2 (Kwong Pak Kwun Line)** (Chinese: //二號 (光北觀) 綫//), full name **Line 2 (Kwong Chow - North Coast / Sightseeing Phase 3, 4 Line)** (Chinese: //二號 (光州 - 北海岸 / 觀光三、四期) 綫//) is a rapid transit service operated by [[/ | + | **Line 2 (Kwong Pak Kwun Line)** (Chinese: //二號 (光北觀) 綫//), full name **Line 2 (Kwong Chow - North Coast / Sightseeing Phase 3, 4 Line)** (Chinese: //二號 (光州 - 北海岸 / 觀光三、四期) 綫//) is a rapid transit service operated by [[/ |
| + | |||
| + | The section between Coast City and Ōrākei West was built by QLR via the Dragon Loop Centre. This section re-routes after the island Dragon Loop Centre located in is demolished. As the work is solely done by WLT, the owner of this section has been transferred from QLR to WLT. | ||
| The line colour is <color # | The line colour is <color # | ||
| Line 80: | Line 89: | ||
| The line is first known as the branch of earliest WLT railway services plan, connecting up [[/ | The line is first known as the branch of earliest WLT railway services plan, connecting up [[/ | ||
| - | It was originally planned to connect [[/ | + | It was originally planned to connect [[/ |
| - | Later renovated by Jonathan and now known as Zone A | + | |
| - | )) for Line 2 to terminate. The proposed route as well as location of [[/ | + | |
| - | Before the line is fully ready, a special shuttle service already started between Sai Mo Island station and [[/ | + | Before the line is fully ready, a special shuttle service already started between Sai Mo Island station and [[/ |
| - | Temporary bus route which will be renamed to 4M and rerouted to serve Museum | + | |
| - | )) serves as the replacement for transport service to Kwong Chow. | + | |
| Line 2 (Kwong Chow - North Coast Line) W. Section Temp Shuttle no longer has no intermediate stops after Sha Tsui station has finished its construction and opens to the public. | Line 2 (Kwong Chow - North Coast Line) W. Section Temp Shuttle no longer has no intermediate stops after Sha Tsui station has finished its construction and opens to the public. | ||
| Line 94: | Line 99: | ||
| ==== Merge of Two Lines ==== | ==== Merge of Two Lines ==== | ||
| - | The idea of merging WLT Line 2 and [[/ | + | The idea of merging WLT Line 2 and [[/ |
| - | Running between Spawn and Toitoi, now discontinued | + | |
| - | )) was using only one platform for terminating and outbound trains, causing confusion to passengers and occasional waiting outside the station. There were no independent sections for trains to wait, hence North Coast Line services were also affected. | + | |
| - | Feasibility of merging, i.e., the compatibility of two lines, is soon studied. Since WLT Line 2 and North Coast Line are using trains with the same length(( | + | Feasibility of merging, i.e., the compatibility of two lines, is soon studied. Since WLT Line 2 and North Coast Line are using trains with the same length((4A/5B train formation, |
| - | 100m | + | |
| - | )) and door spacing(( | + | |
| - | Ex-MTR trains door spacing | + | |
| - | )), the merge is likely to be successful. The main difference to mitigate is only the [[wp> | + | |
| Merging saves the platform for turning back North Coast Line trains, giving it to AT Metro 2209 service terminating trains. Then, the congestion will be largely relieved. The project is initiated as the early work of WLT Line 2, including the crossings and a pair of 700m tracks west of [[/ | Merging saves the platform for turning back North Coast Line trains, giving it to AT Metro 2209 service terminating trains. Then, the congestion will be largely relieved. The project is initiated as the early work of WLT Line 2, including the crossings and a pair of 700m tracks west of [[/ | ||
| - | After confirmed to merge, WLT Line 2 drops the company name WLT in its naming and adopt a [[wp> | + | After confirmed to merge, WLT Line 2 drops the company name WLT in its naming and adopt a [[wp> |
| The merge is later split into two stages because of the amount of work needed to revamp some sections. The first stage is done on 5 May 2024 which WLT Line 2 (Kwong Chow Line) trains run from Kwong Chow via Sai Mo Island and Spawn to Forest Peaks while QLR North Coast Line trains turn back at Coast City. Yet West Lake station and See Tsuen station is not yet completed or opened although trains stop at the stations. | The merge is later split into two stages because of the amount of work needed to revamp some sections. The first stage is done on 5 May 2024 which WLT Line 2 (Kwong Chow Line) trains run from Kwong Chow via Sai Mo Island and Spawn to Forest Peaks while QLR North Coast Line trains turn back at Coast City. Yet West Lake station and See Tsuen station is not yet completed or opened although trains stop at the stations. | ||
| - | Full merge is rolled out on 29 August 2024 along with new host. | + | After remaining works required and done, along with a testing in the new schedule, full merge is rolled out on 29 August 2024 along with new host. |
| ==== Throughrunning ==== | ==== Throughrunning ==== | ||
| Line 150: | Line 149: | ||
| ===== Rolling Stocks ===== | ===== Rolling Stocks ===== | ||
| - | Similar to [[/ | + | Similar to [[/ |
| There are also 5((1 set of M-Train (A209/A200) is changed back to its look before refurbishment along with Camshaft resistors traction control)) sets of M-Train (phase 2A) and 10 sets of K-Train serving passengers. | There are also 5((1 set of M-Train (A209/A200) is changed back to its look before refurbishment along with Camshaft resistors traction control)) sets of M-Train (phase 2A) and 10 sets of K-Train serving passengers. | ||
| Line 156: | Line 155: | ||
| Originally, the fleet was planned to include 3 sets of Shanghai Metro Trains 01A06 previously running on the North Coast Line. However, as the trains are too tall for the tunnels, they are planned to retire instead as soon as North Coast Line merges with WLT Line 2. Alternatively, | Originally, the fleet was planned to include 3 sets of Shanghai Metro Trains 01A06 previously running on the North Coast Line. However, as the trains are too tall for the tunnels, they are planned to retire instead as soon as North Coast Line merges with WLT Line 2. Alternatively, | ||
| - | Due to the platforms in [[/ | + | Due to the platforms in [[/ |
| ^ Car Formation of M-Trains (phase 2A) ||||^ | ^ Car Formation of M-Trains (phase 2A) ||||^ | ||
| Line 226: | Line 225: | ||
| | **Time Session** | | **Time Session** | ||
| | | Kwong Chow - Spawn | Kwong Chow - Tsim Pei Tsui | Kwong Chow - Ostania | | | Kwong Chow - Spawn | Kwong Chow - Tsim Pei Tsui | Kwong Chow - Ostania | ||
| - | | Early Morning\\ \\ (5 am - 9 am) | \\ 2.5 - 3.5 | + | | Early Morning\\ \\ (5 am - 9 am) | \\ 3 | \\ 6 || |
| - | | Day Time\\ \\ (9 am - 9 pm) | \\ 1.6 - 2.3 | + | | Day Time\\ \\ (9 am - 7 pm) | \\ 2 | \\ 2.3 / 3.7 | \\ 6 | |
| - | | Night Peak\\ \\ (9 pm - 11 pm) | \\ 1.0 - 1.7 | + | | Night Peak\\ \\ (7 pm - 11 pm) | \\ 1.3 |
| - | | | + | | \\ Other Sessions\\ |
| </ | </ | ||
| Line 239: | Line 238: | ||
| | @# | | @# | ||
| | **Kwong Chow** | | **Kwong Chow** | ||
| - | | **Sha Tsui** | + | | **Sha Tsui** |
| | **West Lake** | | **West Lake** | ||
| - | | **Sai Mo Island** | + | | **Sai Mo Island** |
| - | | **See Tsuen \\ (Heart of Let's Play)** | + | | **See Tsuen \\ (Heart of Let's Play)** |
| - | | **Spawn** | + | | **Spawn** |
| | @# | | @# | ||
| - | | **Forest Peaks** | + | | **Forest Peaks** |
| - | | **Coast City** | + | | **Coast City** |
| - | | **Dragon Loop Centre** | + | | **Ōrākei West** |
| - | | **Ōrākei West** | + | | **Toitoi** |
| - | | **Toitoi** | + | | **Makki Memorial Village** |
| - | | **Makki Memorial Village** | + | |
| | **Hung Shan** | | **Hung Shan** | ||
| - | | **Lung Tau** | 04:20 | 04:23 | + | | **Lung Tau** | 04:20 | 04:24 |
| | **Tsim Pei Tsui** | | **Tsim Pei Tsui** | ||
| | @# | | @# | ||
| | @# | | @# | ||
| - | | **W. Laputa** | + | | **West Laputa** |
| - | | **Bayside Exchange** | + | | **Bayside Exchange** |
| - | | **Lake | + | | **Lin Hsien-hu |
| - | | **Ho's Bridge** | + | | **Ho's Bridge** |
| - | | **Oceanline** | + | | **Oceanline** |
| - | | **Lindberg** | + | | **Lindberg** |
| | **Belvedere** | | **Belvedere** | ||
| - | | **Jonathan' | + | | **Jonathan' |
| - | | **Bamboo Pavillion** | + | | **Bamboo Pavillion** |
| - | | **Zunice** | + | | **Zunice** |
| - | | **Avondale** | + | | **Avondale** |
| - | | **Springpond** | 04:35 || 04:31 | 03:31 | 03:05 | 03:26 | | + | | **Concordia Link** | 04:35 || 04:31 | 03:31 | 03:05 | 03:27 | |
| - | | **Twilight Spruce** | + | | **Twilight Spruce** |
| | @# | | @# | ||
| | @# | | @# | ||
mtr_letsplay/wlt_line_2.1770600922.txt.gz · Last modified: 2026/02/09 01:35 by BDark000