User Tools

Site Tools


mtr_letsplay:wlt_line_2

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
mtr_letsplay:wlt_line_2 [2024/12/20 05:47] – [Operations] Update and fix alignments bdark000mtr_letsplay:wlt_line_2 [2025/06/12 01:24] (current) – Update signals, stations and future plans bdark000
Line 14: Line 14:
 | **Connecting**\\ **Lines** | @#EB7AE9:<color white>[[wlt_line_1|Line 1 (Meyan Line) Phase 1]]</color> | | **Connecting**\\ **Lines** | @#EB7AE9:<color white>[[wlt_line_1|Line 1 (Meyan Line) Phase 1]]</color> |
 | ::: | @#94D1D1:<color black>[[/wlt_line_3|Line 3 (Cyan Gray Line)]]</color> | | ::: | @#94D1D1:<color black>[[/wlt_line_3|Line 3 (Cyan Gray Line)]]</color> |
-| ::: | @#6B4799:<color white>Elizabeth Line</color> |+| ::: | @#6950A1:<color white>[[/wlt_line_4|Line 4 (Elizabeth Line)]]</color> |
 | ::: | @#F09191:<color white>Hana-Koshi Line</color> | | ::: | @#F09191:<color white>Hana-Koshi Line</color> |
 | ::: | @#0CAF35:<color black>Spawn Grand Circular</color> | | ::: | @#0CAF35:<color black>Spawn Grand Circular</color> |
Line 49: Line 49:
 | ::: | @#00B081:<color white>Bond Line</color> | | ::: | @#00B081:<color white>Bond Line</color> |
 | ::: | @#F3009D:<color white>Effirt Express</color> | | ::: | @#F3009D:<color white>Effirt Express</color> |
-| **Stations**((Not counting through-running sections on Sightseeing Line Phase 3, 4 and Bond Line))| 13 //(work in progress)// |+| **Stations**((Not counting through-running sections on Sightseeing Line Phase 3, 4 and Bond Line))| 12 //(work in progress)// |
 ^  Service  |^ ^  Service  |^
 | **Operator(s)** | [[/west_lake_transport_authority|WLT]]  | | **Operator(s)** | [[/west_lake_transport_authority|WLT]]  |
 | **Service Hours** | 04:47 - next day 03:23 \\ //([[wp>UTC+08:00|UTC+8]])// | | **Service Hours** | 04:47 - next day 03:23 \\ //([[wp>UTC+08:00|UTC+8]])// |
-| **Frequency** | Every 1 - 12 mins |+| **Frequency** | Every 1 - mins |
 | **Depot** | [[/chik_shek_wan_depot|Chik Shek Wan Depot]] | | **Depot** | [[/chik_shek_wan_depot|Chik Shek Wan Depot]] |
 | **Rolling Stock** | [[wp>MTR_Metro_Cammell_EMU_(DC)|M-Train]] (small variant)\\ [[wp>MTR_Rotem_EMU|K-Train]] (small variant)\\ [[wp>MTR_CNR_Changchun_EMU|C-Train]] (small variant)\\ [[/chi|CyanEX CXD104]] | | **Rolling Stock** | [[wp>MTR_Metro_Cammell_EMU_(DC)|M-Train]] (small variant)\\ [[wp>MTR_Rotem_EMU|K-Train]] (small variant)\\ [[wp>MTR_CNR_Changchun_EMU|C-Train]] (small variant)\\ [[/chi|CyanEX CXD104]] |
Line 62: Line 62:
 | **Number of**\\ **Tracks** | Double Track | | **Number of**\\ **Tracks** | Double Track |
 | **Operating**\\ **Speed** | Average: TBC \\ Maximum: 105 km/h (29.2 m/s)((Maximum speed is 120 km/h on Sightseeing Line Phase 3, 4 and Bond Line sections))| | **Operating**\\ **Speed** | Average: TBC \\ Maximum: 105 km/h (29.2 m/s)((Maximum speed is 120 km/h on Sightseeing Line Phase 3, 4 and Bond Line sections))|
-| **Signalling**\\ **System** | MTR Mod's Signalling\\ (with advanced speed controlling) |+| **Signalling**\\ **System** | Minecraft Transit Railway Signals 4003((4003 refers to being the fourth update on signals and speed limits since 4.0.0 betas and pre-releases))\\ //([[wp>European_Train_Control_System#Level_3|ETCS Level 3]] / [[wp>automatic_train_control#ATACS|D-ATACS]] equivalent)//|
 ^  Route Map  |^ ^  Route Map  |^
 |  {{/line2.png?420}}  || |  {{/line2.png?420}}  ||
Line 136: Line 136:
   * 5 May, 2024: First stage of merge kicks in.   * 5 May, 2024: First stage of merge kicks in.
   * 29 August, 2024: Full merge kicks in and throughrunning starts. Name is changed to account for a rather long throughrunning section in Sightseeing Line Phase 3, 4 comparing to Kwong Chow Line section.    * 29 August, 2024: Full merge kicks in and throughrunning starts. Name is changed to account for a rather long throughrunning section in Sightseeing Line Phase 3, 4 comparing to Kwong Chow Line section. 
 +  * 3 June, 2025: Trains are no longer stopping at Three Rivers station to reduce the travelling time from/to former North Coast Line stations. 
  
 ===== Rolling Stocks ===== ===== Rolling Stocks =====
  
-Similar to [[/wlt_line_1#rolling_stocks|Line 1 (Meyan Line)]], since turn radius is small between West Lake station and See Tsuen station in the final zig-zag lining plan, 4-door trains are used instead of 5-door trains that are currently running on North Coast Line. Existing 6 sets of 5-door C-Train with railway vision livery is gradually rebuilding to 5 sets of 4-door C-Train. 1 set of rebuilt C-Train has already transported to Chik Shek Wan Depot and started its passengers service on the shuttle between Kwong Chow and Sai Mo Island. 2 more sets of C-Train has also started passengers service after the first stage of merge.+Similar to [[/wlt_line_1#rolling_stocks|Line 1 (Meyan Line)]], since turn radius is small between West Lake station and See Tsuen station in the final zig-zag lining plan, 4-door trains are used instead of 5-door trains that are currently running on North Coast Line. Existing 6 sets of 5-door C-Train with railway vision livery is gradually rebuilding to 5 sets of 4-door C-Train. 1 set of rebuilt C-Train has already transported to Chik Shek Wan Depot and started its passengers service on the shuttle between Kwong Chow and Sai Mo Island. 2 more sets of C-Train has also started passengers service after the first stage of merge. 1 more set of C-Train started regular service from 2024 December onwards
  
-There are also 5((1 set of M-Train (A209/A200) is changed back to its look before refurbishment along with Camshaft resistors traction control)) set of M-Train (phase 2A) and sets of K-Train have started serving passengers.+There are also 5((1 set of M-Train (A209/A200) is changed back to its look before refurbishment along with Camshaft resistors traction control)) set of M-Train (phase 2A) and 10 sets of K-Train have started serving passengers.
  
-Originally, the fleet was planned to include 3 sets of Shanghai Metro Trains 01A06 previously running on the North Coast Line. However, as the trains are too tall for the tunnels, they are planned to retire instead as soon as North Coast Line merges with WLT Line 2. Alternatively, 5 sets of phase 2C M-Train will join the fleet, but with an overhaul in the propulsion system by Alstom, as DC motor is harder to maintenance and consumes more electricity. +Originally, the fleet was planned to include 3 sets of Shanghai Metro Trains 01A06 previously running on the North Coast Line. However, as the trains are too tall for the tunnels, they are planned to retire instead as soon as North Coast Line merges with WLT Line 2. Alternatively, 5 sets of phase 2C M-Train will join the fleet, but with an overhaul in the propulsion system by Alstom, as DC motor is harder to maintenance and consumes more electricity. 1 set of them has already started regular service
  
 Due to the platforms in [[/cyanex|Cyan Twilight Line]](( Due to the platforms in [[/cyanex|Cyan Twilight Line]]((
 80m long 80m long
-)) can only accomodate 4-car 4-door trains, trains through-running to Cyan Twilight Line and Bond Line need to consist of only 4 cars rather than 5 cars. For promotion of direct access to the Sightseeing Line network, Cyanex Rapid Transit [[/chi|CXD104]] is chosen to be the sole rolling stock used for 4-car trains. Yet, ABB //FW D950// traction instead of CRRC Times //tpower-tn3// traction or Alstom //Optonix1500// traction equipped by trains running on the [[/cyanex|Sightseeing Line]] is equipped for first batch of 15 sets 4-car trains, possibly because of it allowing a tuning with softer sound. It is planned that the next and last batch of 10 sets 4-car trains will be equipped with Bombardier //Mitrac (TC1110 series)// traction+)) can only accomodate 4-car 4-door trains, trains through-running to Cyan Twilight Line and Bond Line need to consist of only 4 cars rather than 5 cars. For promotion of direct access to the Sightseeing Line network, Cyanex Rapid Transit [[/chi|CXD104]] is chosen to be the sole rolling stock used for 4-car trains. Yet, ABB //FW D950// traction instead of CRRC Times //tpower-tn3// traction or Alstom //Optonix1500// traction equipped by trains running on the [[/cyanex|Sightseeing Line]] is equipped for first batch of 15 sets 4-car trains, possibly because of it allowing a tuning with softer sound. And the next and last batch of 10 sets 4-car trains will be equipped with Bombardier //Mitrac (TC1110 series)// traction similar to the one on most Chinese trains built in 2000s or 2010s with Bombardier designed traction. 
  
 ^  Car Formation of M-Trains (phase 2A)  ||||^ ^  Car Formation of M-Trains (phase 2A)  ||||^
Line 219: Line 220:
 |  5 am - 9 am  |  3 - 7  |  4 - 8  |  8  | |  5 am - 9 am  |  3 - 7  |  4 - 8  |  8  |
 |  9 am - 9 pm  |  1.7 - 3.2  |  3.2 - 4.8  |  8  | |  9 am - 9 pm  |  1.7 - 3.2  |  3.2 - 4.8  |  8  |
-|  9 pm - 11 pm  |  1.2 - 2.  1.3 - 4.  4.5 - 7  |+|  9 pm - 11 pm  |  1.2 - 2.  1.3 - 3.  4.5 - 7  |
 |  11 pm - 1 am  |  1.7 - 3.2  |  3.2 - 4.8  |  8  | |  11 pm - 1 am  |  1.7 - 3.2  |  3.2 - 4.8  |  8  |
 |  1 am - 3 am  |  3 - 7  |  5.5 - 8  |  8  | |  1 am - 3 am  |  3 - 7  |  5.5 - 8  |  8  |
Line 227: Line 228:
 ===== Future Plans ===== ===== Future Plans =====
  
-There are no expected further expansion on the line. Existing non-finished stations and track sections will be gradually worked on. +Existing non-finished stations and track sections will be gradually worked on.  
 + 
 +As Tsim Pei Tsui Peninsula east of Eden, south of Kallos and New Buckingham, north of Yunlong not served by any means of transport, and **Line 2 (Kwong Pak Kwun Line)** fleet is expected to be in a large surplus even when operating at ultimate peak hour frequency, it is proposed to expand [[/makki_memorial_village_station|Makki Memorial Village station]] to fit an eastbound platform in, then extend the line in 115° heading, tunnel under Lilac Light Rail tracks and turn to heading east again, finally arrive at the Peninsula after crossing the ocean east of [[/hung_shan_station|Hung Shan station]].  
 + 
 +The line will add three stops, Hung Shan, Lung Tau and Tsim Pei Tsui. Hung Shan will be an interchange station with Metro South Continental Line and Guri Bay Line while Tsim Pei Tsui will be another interchange station with [[/wlt_line_4|Line 4 (Elizabeth Line)]] besides the current West Lake station and proposed Toitoi station
  
 ===== Stations (WIP) ===== ===== Stations (WIP) =====
Line 240: Line 245:
 |  @#8C6AD2:  ||  [[/sha_tsui_station|Sha Tsui]]  |  %%沙咀%%  |  SHT  | |  13 April, 2024  | ::: | |  @#8C6AD2:  ||  [[/sha_tsui_station|Sha Tsui]]  |  %%沙咀%%  |  SHT  | |  13 April, 2024  | ::: |
 |  @#e0e060:  ||  [[/west_lake_station|West Lake]]  |  %%西湖%%  |  WEA  |  @#94d1d1:[[/wlt_line_3|Line 3 (Cyan Gray Line)]]  |  8 October, 2024((Interchange only))  | ::: | |  @#e0e060:  ||  [[/west_lake_station|West Lake]]  |  %%西湖%%  |  WEA  |  @#94d1d1:[[/wlt_line_3|Line 3 (Cyan Gray Line)]]  |  8 October, 2024((Interchange only))  | ::: |
-| ::: || ::: | ::: | ::: |  @#6b4799:<color white>Elizabeth Line</color>  | ::: | ::: |+| ::: || ::: | ::: | ::: |  @#6950a1:<color white>[[/wlt_line_4|Line 4 (Elizabeth Line)]]</color>  | ::: | ::: |
 |  @#ffda33: **Line 2 (Kwong Pak Kwun Line) - North Coast Line section**  |||||||| |  @#ffda33: **Line 2 (Kwong Pak Kwun Line) - North Coast Line section**  ||||||||
 |  @#ffda33: **Line 2 (Kwong Pak Kwun Line) - Sightseeing Line Phase 3, 4 section**  |||||||| |  @#ffda33: **Line 2 (Kwong Pak Kwun Line) - Sightseeing Line Phase 3, 4 section**  ||||||||
mtr_letsplay/wlt_line_2.1734673632.txt.gz · Last modified: 2024/12/20 05:47 by bdark000