mtr_letsplay:wlt_line_2
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
mtr_letsplay:wlt_line_2 [2024/10/29 08:22] – [Stations (WIP)] Supplement Content bdark000 | mtr_letsplay:wlt_line_2 [2025/02/17 16:31] (current) – New timetable eff from 2025/02/17 bdark000 | ||
---|---|---|---|
Line 53: | Line 53: | ||
| **Operator(s)** | [[/ | | **Operator(s)** | [[/ | ||
| **Service Hours** | 04:47 - next day 03:23 \\ // | | **Service Hours** | 04:47 - next day 03:23 \\ // | ||
- | | **Frequency** | Every 1 - 12 mins | | + | | **Frequency** | Every 1 - 8 mins | |
| **Depot** | [[/ | | **Depot** | [[/ | ||
| **Rolling Stock** | [[wp> | | **Rolling Stock** | [[wp> | ||
Line 62: | Line 62: | ||
| **Number of**\\ **Tracks** | Double Track | | | **Number of**\\ **Tracks** | Double Track | | ||
| **Operating**\\ **Speed** | Average: TBC \\ Maximum: 105 km/h (29.2 m/ | | **Operating**\\ **Speed** | Average: TBC \\ Maximum: 105 km/h (29.2 m/ | ||
- | | **Signalling**\\ **System** | MTR Mod's Signalling\\ (with advanced speed controlling) | | + | | **Signalling**\\ **System** | MTR Mod's Signalling\\ (target speeds in increments of 5 km/h)\\ // |
^ Route Map |^ | ^ Route Map |^ | ||
| {{/ | | {{/ | ||
Line 139: | Line 139: | ||
===== Rolling Stocks ===== | ===== Rolling Stocks ===== | ||
- | Similar to [[/ | + | Similar to [[/ |
- | There are also 5((1 set of M-Train (A209/A200) is changed back to its look before refurbishment along with Camshaft resistors traction control)) set of M-Train (phase 2A) and 8 sets of K-Train have started serving passengers. | + | There are also 5((1 set of M-Train (A209/A200) is changed back to its look before refurbishment along with Camshaft resistors traction control)) set of M-Train (phase 2A) and 10 sets of K-Train have started serving passengers. |
- | Originally, the fleet was planned to include 3 sets of Shanghai Metro Trains 01A06 previously running on the North Coast Line. However, as the trains are too tall for the tunnels, they are planned to retire instead as soon as North Coast Line merges with WLT Line 2. Alternatively, | + | Originally, the fleet was planned to include 3 sets of Shanghai Metro Trains 01A06 previously running on the North Coast Line. However, as the trains are too tall for the tunnels, they are planned to retire instead as soon as North Coast Line merges with WLT Line 2. Alternatively, |
Due to the platforms in [[/ | Due to the platforms in [[/ | ||
80m long | 80m long | ||
- | )) can only accomodate 4-car 4-door trains, trains through-running to Cyan Twilight Line and Bond Line need to consist of only 4 cars rather than 5 cars. For promotion of direct access to the Sightseeing Line network, Cyanex Rapid Transit [[/ | + | )) can only accomodate 4-car 4-door trains, trains through-running to Cyan Twilight Line and Bond Line need to consist of only 4 cars rather than 5 cars. For promotion of direct access to the Sightseeing Line network, Cyanex Rapid Transit [[/ |
^ Car Formation of M-Trains (phase 2A) ||||^ | ^ Car Formation of M-Trains (phase 2A) ||||^ | ||
Line 216: | Line 216: | ||
| @# | | @# | ||
| **Time Session** | | **Time Session** | ||
- | | | Kwong Chow - Spawn | Kwong Chow - Makki Memorial Village | Kwong Chow - Ostania | + | | | Kwong Chow - Spawn | Kwong Chow - Makki Memorial Village |
- | | 5 am - 9 am | 3 - 9 | + | | 5 am - 9 am | 3 - 7 |
- | | 9 am - 9 pm | 1.7 - 4.5 | + | | 9 am - 9 pm | 1.7 - 3.2 |
- | | 9 pm - 11 pm | 1.3 - 3.2 | | + | | 9 pm - 11 pm | 1.3 - 2.7 |
- | | 11 pm - 1 am | 1.7 - 4.5 | + | | 11 pm - 1 am | 1.7 - 3.2 |
- | | 1 am - 3 am | 3 - 9 | + | | 1 am - 3 am | 3 - 7 |
</ | </ |
mtr_letsplay/wlt_line_2.1730190172.txt.gz · Last modified: 2024/10/29 08:22 by bdark000