mtr_letsplay:wlt_line_2
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
mtr_letsplay:wlt_line_2 [2024/08/29 05:51] – Changes with respect to full merge from 2024/08/29 bdark000 | mtr_letsplay:wlt_line_2 [2025/06/12 01:24] (current) – Update signals, stations and future plans bdark000 | ||
---|---|---|---|
Line 8: | Line 8: | ||
^ **Overview** | ^ **Overview** | ||
| **Abbreviation** | L2 (KNL) | | | **Abbreviation** | L2 (KNL) | | ||
- | | **Status** | Operational\\ //(Kwong Chow - Makki Memorial Village)// | + | | **Status** | Operational\\ //(Kwong Chow - Makki Memorial Village)// |
- | | **Owner** | [[/ | + | | **Owner** | [[/ |
| **Locale** | [[/ | | **Locale** | [[/ | ||
| **Termini** | [[/ | | **Termini** | [[/ | ||
| **Connecting**\\ **Lines** | @# | | **Connecting**\\ **Lines** | @# | ||
| ::: | @# | | ::: | @# | ||
- | | ::: | @#6B4799:<color white> | + | | ::: | @#6950A1:<color white>[[/ |
| ::: | @# | | ::: | @# | ||
| ::: | @# | | ::: | @# | ||
Line 21: | Line 21: | ||
| ::: | @# | | ::: | @# | ||
| ::: | @# | | ::: | @# | ||
- | | ::: | @# | + | | ::: | @# |
| ::: | @# | | ::: | @# | ||
| ::: | @# | | ::: | @# | ||
Line 33: | Line 33: | ||
| ::: | @# | | ::: | @# | ||
| ::: | @# | | ::: | @# | ||
- | | **Stations**((Not counting through-running sections on Sightseeing Line Phase 3, 4 and Bond Line))| | + | | ::: | @# |
+ | | ::: | @# | ||
+ | | ::: | @# | ||
+ | | ::: | @# | ||
+ | | ::: | @# | ||
+ | | ::: | @# | ||
+ | | ::: | @# | ||
+ | | ::: | @# | ||
+ | | ::: | @# | ||
+ | | ::: | @# | ||
+ | | ::: | @# | ||
+ | | ::: | @# | ||
+ | | ::: | @# | ||
+ | | ::: | @# | ||
+ | | ::: | @# | ||
+ | | ::: | @# | ||
+ | | **Stations**((Not counting through-running sections on Sightseeing Line Phase 3, 4 and Bond Line))| | ||
^ Service | ^ Service | ||
| **Operator(s)** | [[/ | | **Operator(s)** | [[/ | ||
| **Service Hours** | 04:47 - next day 03:23 \\ // | | **Service Hours** | 04:47 - next day 03:23 \\ // | ||
- | | **Frequency** | Every 1 - 12 mins | | + | | **Frequency** | Every 1 - 8 mins | |
| **Depot** | [[/ | | **Depot** | [[/ | ||
| **Rolling Stock** | [[wp> | | **Rolling Stock** | [[wp> | ||
^ History | ^ History | ||
- | | **Opened** | First open:\\ 20 August, 2022\\ //(Coast City - Makki Memorial Village)// | + | | **Opened** | First open:\\ 20 August, 2022\\ //(Coast City - Makki Memorial Village)// |
^ Technical | ^ Technical | ||
| **Line Length** | TBC | | | **Line Length** | TBC | | ||
| **Number of**\\ **Tracks** | Double Track | | | **Number of**\\ **Tracks** | Double Track | | ||
| **Operating**\\ **Speed** | Average: TBC \\ Maximum: 105 km/h (29.2 m/ | | **Operating**\\ **Speed** | Average: TBC \\ Maximum: 105 km/h (29.2 m/ | ||
- | | **Signalling**\\ **System** | MTR Mod's Signalling\\ (with advanced speed controlling) | | + | | **Signalling**\\ **System** | Minecraft Transit Railway Signals 4003((4003 refers to being the fourth update on signals and speed limits since 4.0.0 betas and pre-releases))\\ //([[wp> |
^ Route Map |^ | ^ Route Map |^ | ||
| {{/ | | {{/ | ||
Line 52: | Line 68: | ||
</ | </ | ||
- | **Line 2 (Kwong Pak Kwun Line)** (Chinese: //二號 (光北觀) 綫//), full name **Line 2 (Kwong Chow - North Coast / Sightseeing Phase 3, 4 Line)** (Chinese: //二號 (光州 - 北海岸 / 觀光三、四期) 綫//) is a rapid transit service operated by [[/ | + | **Line 2 (Kwong Pak Kwun Line)** (Chinese: //二號 (光北觀) 綫//), full name **Line 2 (Kwong Chow - North Coast / Sightseeing Phase 3, 4 Line)** (Chinese: //二號 (光州 - 北海岸 / 觀光三、四期) 綫//) is a rapid transit service operated by [[/ |
The line colour is <color # | The line colour is <color # | ||
Line 120: | Line 136: | ||
* 5 May, 2024: First stage of merge kicks in. | * 5 May, 2024: First stage of merge kicks in. | ||
* 29 August, 2024: Full merge kicks in and throughrunning starts. Name is changed to account for a rather long throughrunning section in Sightseeing Line Phase 3, 4 comparing to Kwong Chow Line section. | * 29 August, 2024: Full merge kicks in and throughrunning starts. Name is changed to account for a rather long throughrunning section in Sightseeing Line Phase 3, 4 comparing to Kwong Chow Line section. | ||
+ | * 3 June, 2025: Trains are no longer stopping at Three Rivers station to reduce the travelling time from/to former North Coast Line stations. | ||
===== Rolling Stocks ===== | ===== Rolling Stocks ===== | ||
- | Similar to [[/ | + | Similar to [[/ |
- | There are also 4((1 set of M-Train (A209/A200) is changed back to its look before refurbishment along with Camshaft resistors traction control)) set of M-Train (phase 2A) and 7 sets of K-Train have started serving passengers. | + | There are also 5((1 set of M-Train (A209/A200) is changed back to its look before refurbishment along with Camshaft resistors traction control)) set of M-Train (phase 2A) and 10 sets of K-Train have started serving passengers. |
- | Originally, the fleet was planned to include 3 sets of Shanghai Metro Trains 01A06 previously running on the North Coast Line. However, as the trains are too tall for the tunnels, they are planned to retire instead as soon as North Coast Line merges with WLT Line 2. Alternatively, | + | Originally, the fleet was planned to include 3 sets of Shanghai Metro Trains 01A06 previously running on the North Coast Line. However, as the trains are too tall for the tunnels, they are planned to retire instead as soon as North Coast Line merges with WLT Line 2. Alternatively, |
Due to the platforms in [[/ | Due to the platforms in [[/ | ||
80m long | 80m long | ||
- | )) can only accomodate 4-car 4-door trains, trains through-running to Cyan Twilight Line and Bond Line need to consist of only 4 cars rather than 5 cars. For promotion of direct access to the Sightseeing Line network, Cyanex Rapid Transit [[/ | + | )) can only accomodate 4-car 4-door trains, trains through-running to Cyan Twilight Line and Bond Line need to consist of only 4 cars rather than 5 cars. For promotion of direct access to the Sightseeing Line network, Cyanex Rapid Transit [[/ |
^ Car Formation of M-Trains (phase 2A) ||||^ | ^ Car Formation of M-Trains (phase 2A) ||||^ | ||
Line 200: | Line 217: | ||
| @# | | @# | ||
| **Time Session** | | **Time Session** | ||
- | | | Kwong Chow - Spawn | Kwong Chow - Makki Memorial Village | Kwong Chow - Ostania | + | | | Kwong Chow - Spawn | Kwong Chow - Makki Memorial Village |
- | | 5 am - 9 am | 3 - 9 | + | | 5 am - 9 am | 3 - 7 |
- | | 9 am - 9 pm | 1.7 - 4.5 | + | | 9 am - 9 pm | 1.7 - 3.2 |
- | | 9 pm - 11 pm | 1.5 - 3.2 | 3 - 4.8 | + | | 9 pm - 11 pm | 1.2 - 2.0 |
- | | 11 pm - 1 am | 1.7 - 4.5 | + | | 11 pm - 1 am | 1.7 - 3.2 |
- | | 1 am - 3 am | 3 - 9 | + | | 1 am - 3 am | 3 - 7 |
</ | </ | ||
Line 211: | Line 228: | ||
===== Future Plans ===== | ===== Future Plans ===== | ||
- | There are no expected further expansion on the line. Existing non-finished stations and track sections will be gradually worked on. | + | Existing non-finished stations and track sections will be gradually worked on. |
+ | |||
+ | As Tsim Pei Tsui Peninsula east of Eden, south of Kallos and New Buckingham, north of Yunlong not served by any means of transport, and **Line 2 (Kwong Pak Kwun Line)** fleet is expected to be in a large surplus even when operating at ultimate peak hour frequency, it is proposed to expand [[/ | ||
+ | |||
+ | The line will add three stops, Hung Shan, Lung Tau and Tsim Pei Tsui. Hung Shan will be an interchange station with Metro South Continental Line and Guri Bay Line while Tsim Pei Tsui will be another interchange station with [[/ | ||
===== Stations (WIP) ===== | ===== Stations (WIP) ===== | ||
Line 220: | Line 241: | ||
)) | ::: | ::: | ::: | | )) | ::: | ::: | ::: | | ||
| @#ffda33: **Line 2 (Kwong Pak Kwun Line) - Kwong Chow Line section** | | @#ffda33: **Line 2 (Kwong Pak Kwun Line) - Kwong Chow Line section** | ||
- | | @# | + | | @# |
| ::: || ::: | ::: | ::: | @#C9D88B: West Lake Duck | ::: | ::: | | | ::: || ::: | ::: | ::: | @#C9D88B: West Lake Duck | ::: | ::: | | ||
+ | | @# | ||
+ | | @# | ||
+ | | ::: || ::: | ::: | ::: | @# | ||
| @#ffda33: **Line 2 (Kwong Pak Kwun Line) - North Coast Line section** | | @#ffda33: **Line 2 (Kwong Pak Kwun Line) - North Coast Line section** | ||
| @#ffda33: **Line 2 (Kwong Pak Kwun Line) - Sightseeing Line Phase 3, 4 section** | | @#ffda33: **Line 2 (Kwong Pak Kwun Line) - Sightseeing Line Phase 3, 4 section** |
mtr_letsplay/wlt_line_2.1724910696.txt.gz · Last modified: 2024/08/29 05:51 by bdark000