mtr_letsplay:wlt_line_1
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
mtr_letsplay:wlt_line_1 [2025/03/19 08:03] – [Rolling Stocks] bdark000 | mtr_letsplay:wlt_line_1 [2025/04/14 09:16] (current) – [History] Add link bdark000 | ||
---|---|---|---|
Line 28: | Line 28: | ||
| ::: | @# | | ::: | @# | ||
| ::: | @# | | ::: | @# | ||
+ | | ::: | @# | ||
| ::: | @# | | ::: | @# | ||
| ::: | @# | | ::: | @# | ||
Line 91: | Line 92: | ||
Originally, the reopening of the section between Northern Snow Village station and Hung Ngai Tung station will be after Tung Yuen, Ying Mo and Chi Chuk stations are ready for opening and serving passengers. Yet the focus has changed in May to enhance the connectivity between different regions. Therefore, the rebuilding progress speeded up and finished in mid May 2024. Meanwhile, as the arrangement of trains turning back at the platforms of Kwong Chow station puts a large limitation on train intervals, **Line 1 (Meyan Line) Phase 1** also operates to Tai Po station, two more stations after Kwong Chow, striving a better southward connection. The long awaited Tai Po - Sharp Island section of [[/ | Originally, the reopening of the section between Northern Snow Village station and Hung Ngai Tung station will be after Tung Yuen, Ying Mo and Chi Chuk stations are ready for opening and serving passengers. Yet the focus has changed in May to enhance the connectivity between different regions. Therefore, the rebuilding progress speeded up and finished in mid May 2024. Meanwhile, as the arrangement of trains turning back at the platforms of Kwong Chow station puts a large limitation on train intervals, **Line 1 (Meyan Line) Phase 1** also operates to Tai Po station, two more stations after Kwong Chow, striving a better southward connection. The long awaited Tai Po - Sharp Island section of [[/ | ||
- | It is noticed that there was a lack of rapid transit connections between [[/ | + | It is noticed that there was a lack of rapid transit connections between [[/ |
The branch is opened as trial service soon after tracks are primarily done and Ghost Forest station, Mei Foo Wan station are available for passengers boarding and alighting. Remaining works will be gradually done along with those on the existing sections. | The branch is opened as trial service soon after tracks are primarily done and Ghost Forest station, Mei Foo Wan station are available for passengers boarding and alighting. Remaining works will be gradually done along with those on the existing sections. | ||
Line 170: | Line 171: | ||
| 5 am - 9 am | 2.5 / 5.5 | 8 | 8 | | | 5 am - 9 am | 2.5 / 5.5 | 8 | 8 | | ||
| 9 am - 9 pm | 1.8 - 3.2 | 5 - 5.8 | 5 - 5.8 | | | 9 am - 9 pm | 1.8 - 3.2 | 5 - 5.8 | 5 - 5.8 | | ||
- | | 9 pm - 11 pm | 1.4 - 2.9 | + | | 9 pm - 11 pm | 1.0 - 2.2 |
| 11 pm - 1 am | 1.8 - 3.2 | 5 - 5.8 | 5 - 5.8 | | | 11 pm - 1 am | 1.8 - 3.2 | 5 - 5.8 | 5 - 5.8 | | ||
| 1 am - 3 am | 2.5 / 5.5 | 8 | 8 | | | 1 am - 3 am | 2.5 / 5.5 | 8 | 8 | | ||
Line 214: | Line 215: | ||
| ::: || ::: | ::: | ::: | @#7091FF: <color white> | | ::: || ::: | ::: | ::: | @#7091FF: <color white> | ||
| @# | | @# | ||
- | | @# | + | | @# |
+ | | ::: || ::: | ::: | ::: | @# | ||
| @# | | @# | ||
| @# | | @# |
mtr_letsplay/wlt_line_1.1742371425.txt.gz · Last modified: 2025/03/19 08:03 by bdark000