User Tools

Site Tools


mtr_letsplay:terralith_rapid_transit

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
mtr_letsplay:terralith_rapid_transit [2026/05/04 02:53] – [Structural standards] CinderaceOTSmtr_letsplay:terralith_rapid_transit [2026/08/09 11:20] (current) CinderaceOTS
Line 34: Line 34:
 |S2|@#71B035:**Leaf**|[[Sprigatito Line]]|Mass Rapid Transit|  |In operation| |S2|@#71B035:**Leaf**|[[Sprigatito Line]]|Mass Rapid Transit|  |In operation|
 |S3|@#FFBC00:**Yellow**|[[Shimano Line]]|Mass Rapid Transit|Between Amethyst Valley Station and Oasis Island Station.|In operation| |S3|@#FFBC00:**Yellow**|[[Shimano Line]]|Mass Rapid Transit|Between Amethyst Valley Station and Oasis Island Station.|In operation|
-|S4|@#ff91b5:**Pink**|[[Momoyama Line]]|Light Metro|  |Part in operation| +|S4|@#ff91b5:**Pink**|[[Momoyama Line]]|Light Metro|  |In operation| 
-|S5|@#f7f7f7:**White((It is shown in black on the route map.))**|[[Midorihara Line]]|S-Bahn|  |Under Construction|+|S5(T)|@#f7f7f7:**White**|[[Midorihara Line]]|S-Bahn|  |Part in operation|
 |S6|@#004894:**<color #ffffff>Dark Blue</color>**|[[Sorano Line]]|S-Bahn|  |Under Construction| |S6|@#004894:**<color #ffffff>Dark Blue</color>**|[[Sorano Line]]|S-Bahn|  |Under Construction|
 |S7|@#262626:**<color #ffffff>Black</color>**|[[Kurono Line]]|TBA|  |Planning| |S7|@#262626:**<color #ffffff>Black</color>**|[[Kurono Line]]|TBA|  |Planning|
Line 44: Line 44:
 |S12|@#0FBF78:**Mint Green**|[[Decidueye Line]]|Light Metro(AGT)|  |In operation| |S12|@#0FBF78:**Mint Green**|[[Decidueye Line]]|Light Metro(AGT)|  |In operation|
 |S13|@#ffa79e:**Smoke Pink**|[[Jigglypuff Line]]|Stadtbahn|Through service is provided with the Shimano LRT line.|In operation| |S13|@#ffa79e:**Smoke Pink**|[[Jigglypuff Line]]|Stadtbahn|Through service is provided with the Shimano LRT line.|In operation|
-|S14|@#b5b5ac:**Gray**|[[Shimahana Line]]|Stadtbahn|Through service is provided with the Shimano LRT line.|Part in operation|+|S14|@#b5b5ac:**Gray**|[[Shimahana Line]]|Stadtbahn|Through service is provided with the Shimano LRT line.|In operation|
  
 ====Abolition&Canceled==== ====Abolition&Canceled====
Line 177: Line 177:
   * Line S14 - Dialga Line → Shimahana Line(February 27, 2026)   * Line S14 - Dialga Line → Shimahana Line(February 27, 2026)
 ====Steepest design slope==== ====Steepest design slope====
-This was set when vertical curves were introduced in the MTR3 era. However, as of 4.0.3 in MTR4, there is a bug that prevents the slope from being displayed, and this is only a guideline, so it may not always apply.+This was set when vertical curves were introduced in the MTR3 era. <del>However, as of 4.0.3 in MTR4, there is a bug that prevents the slope from being displayed, and this is only a guideline, so it may not always apply.</del> 
 +This was corrected in version 4.0.5, and the track gradient is now displayed. Corrective work on sections constructed before this update will generally not be carried out.
 |@#EFEEF0:Route|@#EFEEF0:Guide| |@#EFEEF0:Route|@#EFEEF0:Guide|
 |**Line S1, S2, S3, S8, S10**|35‰| |**Line S1, S2, S3, S8, S10**|35‰|
Line 209: Line 210:
 |**Line S10**|120km/h(160km/h)| |**Line S10**|120km/h(160km/h)|
 |**Line S12**|60km/h(70km/h)| |**Line S12**|60km/h(70km/h)|
-|**SLRT AC01, 02, YM01, CD all routes**|80km/h|+|**SLRT AC01, AC01-2, YM01, CD01, CD02, CD10**|80km/h|
 |**SLRT Other routes**|60km/h| |**SLRT Other routes**|60km/h|
  
mtr_letsplay/terralith_rapid_transit.1777863189.txt.gz · Last modified: 2026/05/04 02:53 by CinderaceOTS