User Tools

Site Tools


mtr_letsplay:terralith_rapid_transit

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
mtr_letsplay:terralith_rapid_transit [2026/03/18 12:25] CinderaceOTSmtr_letsplay:terralith_rapid_transit [2026/04/14 13:22] (current) CinderaceOTS
Line 30: Line 30:
  
 =====Routes===== =====Routes=====
-====In operation==== +|@#EFEEF0:**Number**|@#EFEEF0:**Color**|@#EFEEF0:**Name**|@#EFEEF0:**Type**|@#EFEEF0:**Note**|@#EFEEF0:**Status**| 
-  (S1)[[Shinx Line]] +|S1|@#7BACF6:**Sky Blue**|[[Shinx Line]]|Mass Rapid Transit|  |In operation| 
-  * (S2)[[Sprigatito Line]] +|S2|@#71B035:**Leaf**|[[Sprigatito Line]]|Mass Rapid Transit|  |In operation| 
-  * (S3)[[Shimano Line]](Between Amethyst Valley Station and Oasis Island Station.) +|S3|@#FFBC00:**Yellow**|[[Shimano Line]]|Mass Rapid Transit|Between Amethyst Valley Station and Oasis Island Station.|In operation| 
-  * (S4)[[Momoyama Line]] +|S4|@#ff91b5:**Pink**|[[Momoyama Line]]|Light Metro|  |Part in operation| 
-  * (S8)[[Zacyan Line]] +|S5|@#f7f7f7:**White((It is shown in black on the route map.))**|[[Midorihara Line]]|S-Bahn|  |Under Construction| 
-  (S10)[[Furret Line]] +|S6|@#004894:**<color #ffffff>Dark Blue</color>**|[[Sorano Line]]|S-Bahn|  |Under Construction| 
-  * (S11)[[delphox_line]] +|S7|@#262626:**<color #ffffff>Black</color>**|[[Kurono Line]]|TBA|  |Planning| 
-  * (S12)[[Decidueye Line]] +|S8|@#4686C1:**Blue**|[[Zacyan Line]]|Mass Rapid Transit|  |In operation| 
-  * (S13)[[Jigglypuff Line]] +|S9|@#e5b349:**Marigold Yellow**|[[Tails Line]]|TBA|  |Planning| 
-  (S14)[[Shimahana Line]] +|S10|@#9C5E31:**Brown**|[[Furret Line]]|High Speed Transit|The Shinx Line's rapid service. It has reserved seating cars.|In operation| 
- +|S11|@#BB492B:**Fire Orange**|[[delphox_line]]|Light Metro|Circular line|In operation| 
-====Under Construction==== +|S12|@#0FBF78:**Mint Green**|[[Decidueye Line]]|Light Metro(AGT)|  |In operation| 
- +|S13|@#ffa79e:**Smoke Pink**|[[Jigglypuff Line]]|Stadtbahn|Through service is provided with the Shimano LRT line.|In operation| 
-====Planning(Preparation of rolling stock and track equipment is underway.)==== +|S14|@#b5b5ac:**Gray**|[[Shimahana Line]]|Stadtbahn|Through service is provided with the Shimano LRT line.|Part in operation|
-  * (S5)Midorihara Line +
-  * (S6)Sorano Line+
  
 ====Abolition&Canceled==== ====Abolition&Canceled====
Line 164: Line 162:
 ====Route numbers currently unassigned==== ====Route numbers currently unassigned====
 Currently, the following numbers do not have a route name, route icon, or route color set. Currently, numbers up to S20 can be assigned.((Not only LPS, but all SMTR projects allocate up to S20.)) Once a name is decided and concrete plans are put forward, it will be moved to the list above. Currently, the following numbers do not have a route name, route icon, or route color set. Currently, numbers up to S20 can be assigned.((Not only LPS, but all SMTR projects allocate up to S20.)) Once a name is decided and concrete plans are put forward, it will be moved to the list above.
-  * Line S7 
-  * Line S9 
   * Lines S16-S20   * Lines S16-S20
 +Depending on future development, it may be possible to expand up to S45. 
 ====Numbers assigned by route names, etc., but with no current construction plans==== ====Numbers assigned by route names, etc., but with no current construction plans====
 Numbers that currently have names assigned for historical reasons but no route plans have been made. Numbers that currently have names assigned for historical reasons but no route plans have been made.
Line 221: Line 218:
 Furthermore, from August 2024 onwards, gangways will, in principle, be required to be designed so that passengers can pass through from front to back. Furthermore, from August 2024 onwards, gangways will, in principle, be required to be designed so that passengers can pass through from front to back.
 SLRT is not required to install emergency doors, but the above standards must be adhered to if it provides through service to SMTR (including only entering SMTR at one station). SLRT is not required to install emergency doors, but the above standards must be adhered to if it provides through service to SMTR (including only entering SMTR at one station).
-Currently, only Lines S4 and S11 do not allow intrusion into the driver's cab ((Instead, the hit box has been adjusted to make the wall of the driver's cab less visible.)) This may be expanded to other lines in the future.+Currently, access to the driver's cab is prohibited only on routes using LIMPHOX and THIRDPHOX trains. ((Instead, the hit box has been adjusted to make the wall of the driver's cab less visible.)) This may be expanded to other lines in the future.
 Due to concerns about schedule disruption, manual operation will not be implemented except during events. Due to concerns about schedule disruption, manual operation will not be implemented except during events.
 ====Train length ==== ====Train length ====
mtr_letsplay/terralith_rapid_transit.1773836741.txt.gz · Last modified: 2026/03/18 12:25 by CinderaceOTS