User Tools

Site Tools


mtr_letsplay:shimanolrt

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
mtr_letsplay:shimanolrt [2026/06/22 12:55] – CinderaceOTSmtr_letsplay:shimanolrt [2026/09/25 21:46] (current) – CinderaceOTS
Line 31: Line 31:
 This system is based on the old TeufortLRT (TLRT) and has been customized for left-hand traffic. The vehicles were originally S43-Tec LRVs used in the TeufortLRT (TLRT), with the transition to MTR4, LIGHTACE has been upgraded to accommodate MTR4, and S43-Tec LRT has been replaced by S43-Tec Stadtbahn. A new vehicle called STADTACE has also been introduced. This system is based on the old TeufortLRT (TLRT) and has been customized for left-hand traffic. The vehicles were originally S43-Tec LRVs used in the TeufortLRT (TLRT), with the transition to MTR4, LIGHTACE has been upgraded to accommodate MTR4, and S43-Tec LRT has been replaced by S43-Tec Stadtbahn. A new vehicle called STADTACE has also been introduced.
  
-=====Features===== 
-  * This line basically plays a complementary role to existing or planned lines with long distances between stations, including lines other than SMTR, so there is a strong tendency to construct it in parallel with the line. ((There are some routes that do not have parallel routes, such as the HG system.)) 
-  * Except for existing stations, there is a strong tendency for station names to be written in Japanese. 
-  * Unlike SMTR, the construction method is simplified and tends not to create stations with different designs from station to station. 
-  * As mentioned above, it is compatible with the TLRT and actually once offered direct service to it. 
-  * In principle, only CJK ((example:"相01")) is indicated as the number, which is different from other LRT lines. ((English notation can be confirmed on the system map.))((The system numbers of the Tokyo Metropolitan Bureau of Transportation are used as a reference.)) 
 =====History===== =====History=====
 Plans for the first SLRT route were announced on August 21, 2024, and the first section of KR01 opened on August 26 of the same year to commemorate the opening of Utsunomiya LRT. Plans for the first SLRT route were announced on August 21, 2024, and the first section of KR01 opened on August 26 of the same year to commemorate the opening of Utsunomiya LRT.
Line 51: Line 45:
  
 A single-car train began operation in August 2025. A single-car train began operation in August 2025.
 +
 +=====Future Plans=====
 +A second major model update is planned for the vehicles manufactured by S43-Tec; however, a specific timeframe has not been announced due to the manufacturer's scheduling constraints. Route development has been temporarily suspended pending the anticipated changes to the vehicle model itself.
 +This major update is expected to result in the full lineup of new vehicle types (excluding the older LRV 2020).
 +Due to operational limitations—such as the inability to form odd-numbered train sets—the LIGHTACE fleet is slated for a phased reduction in service, eventually leading to complete withdrawal from operation.
 +(This excludes the LRV1928.)
 +Plans are in place to introduce the STADTACE as a replacement; this model offers functionality equivalent to the aforementioned S43-Tec vehicles.
  
 =====Rolling Stock===== =====Rolling Stock=====
Line 92: Line 93:
 These are the main vehicles currently used by the SLRT, accounting for 60% of the total fleet. When new lines are opened or relocated, these, along with the aforementioned STADTACE vehicles, will be allocated to account for a large proportion of the fleet. These are the main vehicles currently used by the SLRT, accounting for 60% of the total fleet. When new lines are opened or relocated, these, along with the aforementioned STADTACE vehicles, will be allocated to account for a large proportion of the fleet.
 Currently under development, new vehicles will be introduced sequentially. Currently under development, new vehicles will be introduced sequentially.
-Only Stadtbahn 2002 has a Metro model with a larger proportion of seats across the street. This is mainly used for short distance routes.+Additionally, the "Stadtbahn 2002" series includes a "Metro model" variant—characterized by a high proportion of longitudinal seating throughout the interior—which is primarily used on short-distance routes.
  
 The Stadtbahn 1975 train cannot pass through because there is no gangway. The Stadtbahn 1975 train cannot pass through because there is no gangway.
Line 202: Line 203:
 |[[ShimanoMTR]] [[Jigglypuff Line]]|相01(AC01)|Delphox Town ⇄ Kurokusa ⇄ Acacialand Village ⇄ Higashi Huggy 8 Chome | 62 min | |[[ShimanoMTR]] [[Jigglypuff Line]]|相01(AC01)|Delphox Town ⇄ Kurokusa ⇄ Acacialand Village ⇄ Higashi Huggy 8 Chome | 62 min |
 | ::: |黑01(KR01)|Delphox Town ⇄ Kurokusa ⇄ Daisetu Town ⇄ Cinderace | 82 min | | ::: |黑01(KR01)|Delphox Town ⇄ Kurokusa ⇄ Daisetu Town ⇄ Cinderace | 82 min |
-|Shimano MTR [[Shimahana Line]]|覺01(PA01)|(Feature: Kurokusa ⇄)Huggy Wuggy ⇄ Higashi Huggy 8 Chome ⇄ Plain Harbor ⇄ Peak of Awakening| N/A |+|Shimano MTR [[Shimahana Line]]|覺01(PA01)|Kurokusa ⇄Huggy Wuggy ⇄ Higashi Huggy 8 Chome ⇄ Plain Harbor ⇄ Peak of Awakening| 34 min |
 |Plasmaliner LRT Route 01|相01-2(AC01-2)| Groenrijk ⇄ High Oasis ⇄ Yumeshima | 30 min | |Plasmaliner LRT Route 01|相01-2(AC01-2)| Groenrijk ⇄ High Oasis ⇄ Yumeshima | 30 min |
 ====Former==== ====Former====
 ^Company&Route^Route Name^Operation section^Duration^ ^Company&Route^Route Name^Operation section^Duration^
 |Teufort LRT U2|相01(AC01)|Kurokusa Depot  ⇄ Landfall((Current:Kamiyonai)) ⇄ Teufort Central ⇄ Banana Bay | 67 min | |Teufort LRT U2|相01(AC01)|Kurokusa Depot  ⇄ Landfall((Current:Kamiyonai)) ⇄ Teufort Central ⇄ Banana Bay | 67 min |
mtr_letsplay/shimanolrt.1782132957.txt.gz · Last modified: 2026/06/22 12:55 by CinderaceOTS