mtr_letsplay:shimanolrt
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| mtr_letsplay:shimanolrt [2026/08/09 09:26] – [Current] CinderaceOTS | mtr_letsplay:shimanolrt [2026/09/25 21:46] (current) – CinderaceOTS | ||
|---|---|---|---|
| Line 31: | Line 31: | ||
| This system is based on the old TeufortLRT (TLRT) and has been customized for left-hand traffic. The vehicles were originally S43-Tec LRVs used in the TeufortLRT (TLRT), with the transition to MTR4, LIGHTACE has been upgraded to accommodate MTR4, and S43-Tec LRT has been replaced by S43-Tec Stadtbahn. A new vehicle called STADTACE has also been introduced. | This system is based on the old TeufortLRT (TLRT) and has been customized for left-hand traffic. The vehicles were originally S43-Tec LRVs used in the TeufortLRT (TLRT), with the transition to MTR4, LIGHTACE has been upgraded to accommodate MTR4, and S43-Tec LRT has been replaced by S43-Tec Stadtbahn. A new vehicle called STADTACE has also been introduced. | ||
| - | =====Features===== | ||
| - | * This line basically plays a complementary role to existing or planned lines with long distances between stations, including lines other than SMTR, so there is a strong tendency to construct it in parallel with the line. ((There are some routes that do not have parallel routes, such as the HG system.)) | ||
| - | * Except for existing stations, there is a strong tendency for station names to be written in Japanese. | ||
| - | * Unlike SMTR, the construction method is simplified and tends not to create stations with different designs from station to station. | ||
| - | * As mentioned above, it is compatible with the TLRT and actually once offered direct service to it. | ||
| - | * In principle, only CJK ((example:" | ||
| =====History===== | =====History===== | ||
| Plans for the first SLRT route were announced on August 21, 2024, and the first section of KR01 opened on August 26 of the same year to commemorate the opening of Utsunomiya LRT. | Plans for the first SLRT route were announced on August 21, 2024, and the first section of KR01 opened on August 26 of the same year to commemorate the opening of Utsunomiya LRT. | ||
| Line 51: | Line 45: | ||
| A single-car train began operation in August 2025. | A single-car train began operation in August 2025. | ||
| + | |||
| + | =====Future Plans===== | ||
| + | A second major model update is planned for the vehicles manufactured by S43-Tec; however, a specific timeframe has not been announced due to the manufacturer' | ||
| + | This major update is expected to result in the full lineup of new vehicle types (excluding the older LRV 2020). | ||
| + | Due to operational limitations—such as the inability to form odd-numbered train sets—the LIGHTACE fleet is slated for a phased reduction in service, eventually leading to complete withdrawal from operation. | ||
| + | (This excludes the LRV1928.) | ||
| + | Plans are in place to introduce the STADTACE as a replacement; | ||
| =====Rolling Stock===== | =====Rolling Stock===== | ||
mtr_letsplay/shimanolrt.txt · Last modified: 2026/09/25 21:46 by CinderaceOTS