User Tools

Site Tools


mtr_letsplay:momoyama_line

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
mtr_letsplay:momoyama_line [2026/03/08 13:44] CinderaceOTSmtr_letsplay:momoyama_line [2026/08/09 11:28] (current) – [History] CinderaceOTS
Line 40: Line 40:
 =====Overview===== =====Overview=====
 This line will traverse the section from Cinderace to Oxenholme. This line will traverse the section from Cinderace to Oxenholme.
- 
-It is currently under construction and has not yet opened to the public. 
  
 This line is the second to use a linear motor with a steel support system, after the [[Delphox Line]]. However, unlike the Delphox Line ((the minimum curve radius of the circular section of the Delphox Line is 80m)), the minimum curve radius of the main line is 400m or more, making it possible to maintain maximum speeds throughout the entire section except for the terminal stations. This line is the second to use a linear motor with a steel support system, after the [[Delphox Line]]. However, unlike the Delphox Line ((the minimum curve radius of the circular section of the Delphox Line is 80m)), the minimum curve radius of the main line is 400m or more, making it possible to maintain maximum speeds throughout the entire section except for the terminal stations.
Line 49: Line 47:
 The entire first section of this line runs parallel to the SLRT CD10, and transfers to this line are possible at all stations except Hoshisato Town station ((where transfers to the SLRT KR01 are possible)). The entire first section of this line runs parallel to the SLRT CD10, and transfers to this line are possible at all stations except Hoshisato Town station ((where transfers to the SLRT KR01 are possible)).
  
-This line is the first in-car announcement system for SMTR, but because it uses the format of the Yokohama Municipal Subwayit tends to be heavily Japanese. Some English announcements will be transcribed.+SMTR had experimentally introduced an automated in-vehicle announcement system, but it is no longer in use due to frequent malfunctions occurring when the connection was unstable. However, the previously installed equipment remains in placewith only the audio data removed in preparation for a potential reintroduction.
  
-The standard journey time on this line is expected to be approximately 12 to 15 minutes.+The standard journey time on approximately 15 minutes.
  
 =====History===== =====History=====
Line 57: Line 55:
  
 When the decision was made to officially introduce six-car LIMPHOX trains (90m long) in February 2026, some of the already constructed platforms were closed off. When the decision was made to officially introduce six-car LIMPHOX trains (90m long) in February 2026, some of the already constructed platforms were closed off.
- 
-The first station to open is Cinderace Station to Hoshisato Town Station on March 8, 2026. However, the exit at Sakuramon Station is still incomplete, so although you can get off there, you cannot transfer to the SLRT. 
  
 ===== Rolling Stocks ===== ===== Rolling Stocks =====
mtr_letsplay/momoyama_line.1772977447.txt.gz · Last modified: 2026/03/08 13:44 by CinderaceOTS