User Tools

Site Tools


mtr_letsplay:lrt_882

This is an old revision of the document!


Lilac Light Rail Route 882

Lilac Light Rail Route 882 (Chinese: 麗蓮輕鐵882綫) is a Lilac Light Rail route connecting Heung Fan Liu Airport South stop and Light Rail Depot stop via Jonathan’s Resort, and is jointly owned by Lilypad Rail and Qingli Railways.

Lilac Light Rail Route 882
麗蓮輕鐵882綫
Overview
Operate locationKallos
Oculus
Resort
Transit typeLight Rail Transit
SystemLilac Light Rail
StatusOperational
Starting stopLight Rail Depot
TerminusAirport South
Technical
CharacterAt-grade
Underground
Maximum speed60km/h
Number of stations9
Track gauge1435mm
(4 ft 0.5 in)
standard gauge
Electrification750 DC Third Rail
DepotKallos Light Rail Depot
Rolling stockLight Rail Phase I
Light Rail Phase II
Light Rail Phase III
Light Rail Phase IV
Light Rail Phase V
Number of cars1 or 2
Service
Opened7 November 2022, 1 year ago
Owner(s)Qingli Railways
Lilypad Rail
Operator(s)Qingli Railways

History

On 19 September 2022, Qingli Railways proposed a light rail connection between Kallos and Jonathan’s Resort via a transit hub, Five Points Transit Center (current Oculus Center). The route number was decided to be 882, where the first 8 represents Kallos area, and 82 is the ASCII code of R of Resort.

On 7 November 2022, route 882 was fully operational from Light Rail Depot to Jonathan's Resort. The route stopped at the current Kallos Express platforms at Jonathan's Resort stop at that time.

In mid-November, Qingli Railways realized that it takes a very long time to travel from Kallos to Jonathan's Resort. As a result, Kallos Express was planned to replace route 882 for the connection between Kallos and Jonathan's Resort. However, it ended up that Kallos Express was extended to Jonathan's Resort on 18 December 2022, route 882 was also kept to serve placed between. A temporary stop is built for route 882 to stop until a suitable position is found

On 14 December 2022, Five Points Transit Center has been renamed to Oculus Center due to the change of ownership.

On 1 January 2023, platforms at Oculus Center were relocated to underground.

On 4 February 2023, Jonathan's Resort Light Rail Terminal was completed. Route 882 platforms were relocated there. At the same time, Qingli Railways also proposed the extension of Route 882 to Heung Fan Liu Airport, such that the Tempest Light Rail system can connect to the rest of the Lilac Light Rail System.

On 4 March 2023, the extension was completed. Route 882 was officially extended to Heung Fan Liu Airport.

According to “Lilac Light Rail Reform Plan 2023”, route 882 will once again terminate at Jonathan's Resort. The connection between Heung Fan Liu Airport and Jonathan’s Resort will be replaced by the extension of route 720 and route 601.

Stations

Fare Zone Name District Connections Opened
Lilac Light Rail Route 882


1
Light Rail Depot
輕鐵車廠
Kallos 10 September 2022
Shek Ai
石艾
10 October 2022
Shek Ai  Azalea CL 









4
庫克山
Āoraki
Oculus 7 November 2022
Āoraki  AT Metro 
Āoraki North
庫克山北
Kaijin Ferry Pier
凱金碼頭
Kaijin-Kowloon Express Ferry
5 Oculus Center
眼窗中心
Oculus Center  Oculink Red Line 
 Oculink Yelllow Line 
 Bond Line 
Blackland
黑石地
Resort
Roundabout Lake
環島湖
Jonathan's Resort
裝奶粉渡假村
mtr_letsplay/lrt_882.1698149552.txt.gz · Last modified: 2023/10/24 12:12 by tea_bocchi