mtr_letsplay:lrt_810
Differences
This shows you the differences between two versions of the page.
| Next revision | Previous revision | ||
| mtr_letsplay:lrt_810 [2023/10/24 03:00] – 创建 Tea | mtr_letsplay:lrt_810 [2023/11/02 12:42] (current) – Tea | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | =====Lilac Light Rail Route 810===== | + | ======Lilac Light Rail Route 810====== |
| + | **Lilac Light Rail Route 810** (Chinese: **麗蓮輕鐵810綫**) is a [[lilac_light_rail]] route connecting Light Rail Depot stop and Enchanted South Hill stop, and is jointly owned by [[lilypad_rail]] and Qingli Railways. | ||
| + | |||
| + | <WRAP right> | ||
| + | ^ < | ||
| + | |@# | ||
| + | | {{810_scrn.png? | ||
| + | ^ Overview | ||
| + | |**Operate location**|Kallos\\ Mou Tapu| | ||
| + | |**Transit type**|Light Rail Transit| | ||
| + | |**System**|[[lilac_light_rail]]| | ||
| + | |**Status**|Operational| | ||
| + | |**Starting stop**|Light Rail Depot| | ||
| + | |**Terminus**|Enchanted South Hill| | ||
| + | ^ Technical | ||
| + | |**Character**|Overground\\ At-grade\\ Underground| | ||
| + | |**Maximum speed**|60km/ | ||
| + | |**Number of stations**|9| | ||
| + | |**Track gauge**|1435mm\\ (4 ft 0.5 in)\\ standard gauge| | ||
| + | |**Electrification**|750 DC Third Rail| | ||
| + | |**Depot**|Kallos Light Rail Depot| | ||
| + | |**Rolling stock**|Light Rail Phase I\\ Light Rail Phase II\\ Light Rail Phase III\\ Light Rail Phase IV\\ Light Rail Phase V| | ||
| + | |**Number of cars**|1 or 2| | ||
| + | ^ Service | ||
| + | |**Opened**|10 October 2022, 1 year ago| | ||
| + | |**Owner(s)**|Qingli Railways\\ [[mtr_letsplay: | ||
| + | |**Operator(s)**|Qingli Railways| | ||
| + | </ | ||
| + | |||
| + | =====History===== | ||
| + | On 17 September 2022, Qingli Railways proposed this route together with an upgrade on Kallos LRT stop (current Light Rail Depot stop) to a High Speed stop. | ||
| + | |||
| + | On 10 October 2022, this route is completed with the new Light Rail Depot stop. | ||
| + | |||
| + | On 29 October 2023, Royal Park is added to Enchanted South Hill bound for future connections to Elizabeth Line and [[lrt_804|route 804]]. | ||
| + | |||
| + | =====Stations===== | ||
| + | <WRAP left> | ||
| + | ^ Fare Zone ^ Name ^ District | ||
| + | | @# | ||
| + | | @#F7D0C9:\\ \\ \\ \\ <color # | ||
| + | |::: | ||
| + | |:::|Royal Park\\ 皇家園|::: | ||
| + | |:::|Shek Ai\\ 石艾|::: | ||
| + | |::: | ||
| + | | @#D8E8C4:\\ \\ \\ \\ \\ \\ \\ \\ \\ <color # | ||
| + | |:::|Shun Tin\\ 順天|::: | ||
| + | |:::|Origin Mountain\\ 起點山|::: | ||
| + | |:::|Mou Tapu\\ 慕塔普|::: | ||
| + | |::: | ||
| + | |:::|Stone Shore (East)\\ 石岸(東)|::: | ||
| + | |:::|Stone Short (West)\\ 石岸(西)|::: | ||
| + | |::: | ||
| + | |::: | ||
| + | </ | ||
| + | |||
| + | =====Fare Zones===== | ||
| + | - <color /# | ||
| + | \\ - <color /# | ||
| + | \\ Route 810 can meet up with other routes: 410, 483P, 801, 802, 804, 882 | ||
| + | |||
| + | =====Independent Sections===== | ||
| + | - Track section between Shek Ai and Forest Boundaries | ||
| + | |||
| + | =====Reference Pages===== | ||
| + | - [[lilac_light_rail]] | ||
| + | \\ - [[lrt_410]] | ||
| + | \\ - [[lrt_882]] | ||
mtr_letsplay/lrt_810.1698116458.txt.gz · Last modified: 2023/10/24 03:00 by Tea