User Tools

Site Tools


mtr_letsplay:lrt_115

This is an old revision of the document!


Lilac Light Rail Route 115

Lilac Light Rail Route 115 (Chinese:麗蓮輕鐵115綫) is a Lilac Light Rail route connecting Winry and Hot Springs, and is jointly owned by Qingli Railways and Lilypad Rail.

Lilac Light Rail Route 115
麗蓮輕鐵115綫
Overview
Operate locationYankton
Eden
Toitoi
Spawn
Transit typeLight Rail Transit
SystemLilac Light Rail
StatusOperational
Starting stopWinry
TerminusHot Springs
Technical
CharacterOverground
At-grade
Underground
Maximum speed60km/h
Number of stations14
Track gauge1435mm
(4 ft 0.5 in)
standard gauge
Electrification750 DC Third Rail
DepotYi Long Depot
Rolling stockLight Rail Phase I
Light Rail Phase III
Light Rail Phase IV
Light Rail Phase V
Number of cars2
Service
Opened6 May 2023, 5 months ago
Owner(s)Qingli Railways
Lilypad Rail
Operator(s)Lilypad Rail

History

On 30 April 2023, during the construction of the South Continental Line, Lilypad Rail had made an assessment and released a plan to connect Winry and Ishima stations. The former is the terminus of the Blau LRT, and the latter being a stop on the South Continental Line. The line was thus named “Blau LRT Branch Line” despite not being connected track-wise to the original Blau LRT.

On 6 May 2023, Blau LRT Eastbound (Blau LRT Branch Line) was completed. S43-Tech Light Rail Vehicles were used at that time.

On 9 May 2023, the Blau LRT Branch Line was converted converted into Lilac Light Rail Route 115. The rolling stock was also changed to Hong Kong LRVs. A proposal was dropped on the same day, which planned to connect Ishima with the Eden Circular loop through Yi Lok stop. However, due to limitations brought by the heritage tracking between Yi Sin and Yi Lok, route 115 was instead rerouted to connect the Eden loop through Yi Yao, with a infill stop between Ishima and Yi Yao, Yi Nam, right in the south of Yi Sin stop. The whole plan was to connect all the way to Hot Springs, however, as the connection between Spruce Forest and Puketeraki was not completed, 115 was planned to temporarily terminate at Yi Long stop, which is the depot location for route 115. The extension completed on 10 May 2023.

On 22 October 2023, the track connection between Spruce Forest and Puketeraki is completed. Route 115 is thus extended to Hot Springs. Yi Long stop is then removed from the system.

Stations

Fare Zone Name District Connections Opened
2A Winry
冬浮島
Yankton 6 May 2023




2
Ishima
伊島
Ishima  South Continental Line 
Ikawa  Dai Yunlong Line 
 Snowie Line 
Yi Nam
伊南
Kallos 10 May 2023
Yi Yao
伊瑤
20 August 2022
Yi Yao  Guri Bay Line 
Izu
伊茲
Purple Leaves
紫葉
New Red Leaves
新紅葉
New Red Leaves  South Continental Line 






1
Spruce Forest
杉木林
20 August 2022
mtr_letsplay/lrt_115.1698305743.txt.gz · Last modified: 2023/10/26 07:35 by tea_bocchi