User Tools

Site Tools


mtr_letsplay:lrt_101_2
You were redirected here from [REDIRECT PAGE] Lilac Light Rail Route 101.

Lilac Light Rail Route 102/101

Lilac Light Rail Route 101/102 (Chinese: 麗蓮輕鐵102/ 101綫) are 2 circular routes jointly owned by Qingli Railways and Lilypad Rail, set up in Eden area, mainly connecting transit hubs within the Eden area, but not stop at Eden stop. Routes 101 and 102 are actually the same route, but in different directions. Route 101 is in clockwise direction; while Route 102 is in anti-clockwise direction. Route 101 is discontinued since the full operation of route 801P.

Lilac Light Rail Route 102/101
麗蓮輕鐵102/ 101綫
Overview
Operate locationEden
Transit typeLight Rail Transit
SystemLilac Light Rail
StatusOperational
TerminusN/A
Technical
CharacterAt-grade
Underground
Maximum speed60km/h
Number of stations4
Track gauge1435mm
(4 ft 0.5 in)
standard gauge
Electrification750 DC Third Rail
DepotEden Light Rail Depot
Rolling stockLight Rail Phase I
Number of cars2
Service
Opened20 August 2022, 1 year ago
Discontinued(101) 8 November 2023
Owner(s)Qingli Railways
Lilypad Rail
Operator(s)Qingli Railways

History

On 20 August 2022, Route 101 and 102 completed together with route 801 extension to Eden stop. At that time trains goes back to sidings after completing a loop back to Yi Lok stop, to maintain a stable frequency of 3 minutes.

On 31 August 2022, the siding arrangement has been cancelled. Trains thus continue to run after arriving at Yi Lok. The frequency is increased to 2 minutes.

On 15 November 2022, MPL 85 trains start to run on this route. The original Light Rail Trains were moved to Kallos Light Rail Depot.

According to “Lilac Light Rail Reform Plan 2023”, Route 101 will be removed when route 801P goes into operation, as it’s use can be replaced by alternate transportation methods. Route 102 will be kept to service some important connections. The MPL 85 trains are planned to be replaced by Light Rail Phase 1 trains with CLR livery. The MPL 85 trains will be moved to run on Sei Mei APM.

On 8 November 2023, as route 814 went fully operational, 101 is removed. At the same time, the Railway Vision MPL 85 train in route 102 is changed to Centown Livery Light Rail Phase I.

Stations

Fare
Zone
Name District Connections Opened
Lilac Light Rail Route 102/101








2
Yi Sin
伊茜
Kallos 20 August 2022

Yi Lok
伊樂
Yi Lok  Dai Yunlong Line 

Yi Yao
伊瑤
Yi Yao  Guri Bay Line 

Izu
伊茲

Independent Sections

- Track section from Yi Sin to Izu
- Track section from Yi Lok to Yi Yao

Fare Zones of stations along route 102

-      Fare Zone 2: Yi Lok → Yi Yao → Yi Lok
Route 102 can meet up with other light rail routes: 115, 801, 801P

mtr_letsplay/lrt_101_2.txt · Last modified: 2023/11/14 06:30 by tea_bocchi