mtr_letsplay:lilac_light_rail
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
mtr_letsplay:lilac_light_rail [2024/05/12 13:15] – cokestudio | mtr_letsplay:lilac_light_rail [2024/05/19 11:10] (current) – xpgd | ||
---|---|---|---|
Line 14: | Line 14: | ||
| **Owner** | [[lilypad_rail|Lilypad Rail]]\\ Qingli Railways | | | **Owner** | [[lilypad_rail|Lilypad Rail]]\\ Qingli Railways | | ||
| **Locale** | Spawn\\ Kallos\\ Mou Tapu\\ Resort\\ Taipa\\ Eastwich\\ Llanmara\\ Tempest\\ Sunrise | | | **Locale** | Spawn\\ Kallos\\ Mou Tapu\\ Resort\\ Taipa\\ Eastwich\\ Llanmara\\ Tempest\\ Sunrise | | ||
- | | **Connecting lines** | <color /# | + | | **Connecting lines** | <color /# |
| **Stations** | 134 | | | **Stations** | 134 | | ||
| **Color on map** | <color /# | | **Color on map** | <color /# | ||
Line 409: | Line 409: | ||
**Discontinued Services:** \\ - **801X** : Light Rail Depot to Lei Yue Mun, put into service on 10 September 2022, through runs on Chin Ka Village Light Rail (Route 762) from Toitoi to Lei Yue Mun. As route 802 is extended to Toitoi on 4 December 2022, this route is discontinued because it can no longer provide more efficiency for passengers. \\ - **643** : Taipa to Light Rail Depot (above-ground platforms) via Royal Park in Light Rail Depot direction, and direct to Mou Lun in Taipa direction. Was in service for less than one day as a public test route during the construction of the Taipa-Kallos connection, but construction on the 804 route was completed in time for full open service without the temporary 643 route. | **Discontinued Services:** \\ - **801X** : Light Rail Depot to Lei Yue Mun, put into service on 10 September 2022, through runs on Chin Ka Village Light Rail (Route 762) from Toitoi to Lei Yue Mun. As route 802 is extended to Toitoi on 4 December 2022, this route is discontinued because it can no longer provide more efficiency for passengers. \\ - **643** : Taipa to Light Rail Depot (above-ground platforms) via Royal Park in Light Rail Depot direction, and direct to Mou Lun in Taipa direction. Was in service for less than one day as a public test route during the construction of the Taipa-Kallos connection, but construction on the 804 route was completed in time for full open service without the temporary 643 route. | ||
- | {{: | + | {{: |
**Shelved lines:** \\ - **719P (first generation)** : Tempest to Eastwich-on-sea (via Toodeepic Ocean), as it was just completely overlapping 736P without bringing any benefits to the light rail system, this route was set aside. \\ - **723P** : Tao Tung -> Sunrise (via Big Stick), this was a depot route planned to let trains carry passengers when gonig back to Sunrise depot from Tao Tung. In the final plan, the last instruction of Sunrise Depot was set to be 735 towards Sunrise, this depot route was no longer needed and was set aside.\\ - **802K**: Light Rail Depot to South Memorial. This route was raised by Qingli Railways to connect the 505 Memorial loop to the main light rail system, with a 15 minute frequency. This route plan was soon replaced by 578E which goes from South Memorial to Tempest. This route has been raised again in the "Lilac Light Rail Reform Plan 2023" as the frequency of 578E is far from enough to carry passengers out of the Memorial area to other light rail stops. | **Shelved lines:** \\ - **719P (first generation)** : Tempest to Eastwich-on-sea (via Toodeepic Ocean), as it was just completely overlapping 736P without bringing any benefits to the light rail system, this route was set aside. \\ - **723P** : Tao Tung -> Sunrise (via Big Stick), this was a depot route planned to let trains carry passengers when gonig back to Sunrise depot from Tao Tung. In the final plan, the last instruction of Sunrise Depot was set to be 735 towards Sunrise, this depot route was no longer needed and was set aside.\\ - **802K**: Light Rail Depot to South Memorial. This route was raised by Qingli Railways to connect the 505 Memorial loop to the main light rail system, with a 15 minute frequency. This route plan was soon replaced by 578E which goes from South Memorial to Tempest. This route has been raised again in the "Lilac Light Rail Reform Plan 2023" as the frequency of 578E is far from enough to carry passengers out of the Memorial area to other light rail stops. |
mtr_letsplay/lilac_light_rail.1715519749.txt.gz · Last modified: 2024/05/12 13:15 by cokestudio