mtr_letsplay:lilac_light_rail
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
mtr_letsplay:lilac_light_rail [2024/01/27 05:37] – [Routes] cokestudio | mtr_letsplay:lilac_light_rail [2024/05/19 11:10] (current) – xpgd | ||
---|---|---|---|
Line 14: | Line 14: | ||
| **Owner** | [[lilypad_rail|Lilypad Rail]]\\ Qingli Railways | | | **Owner** | [[lilypad_rail|Lilypad Rail]]\\ Qingli Railways | | ||
| **Locale** | Spawn\\ Kallos\\ Mou Tapu\\ Resort\\ Taipa\\ Eastwich\\ Llanmara\\ Tempest\\ Sunrise | | | **Locale** | Spawn\\ Kallos\\ Mou Tapu\\ Resort\\ Taipa\\ Eastwich\\ Llanmara\\ Tempest\\ Sunrise | | ||
- | | **Connecting lines** | <color /# | + | | **Connecting lines** | <color /# |
| **Stations** | 134 | | | **Stations** | 134 | | ||
| **Color on map** | <color /# | | **Color on map** | <color /# | ||
Line 31: | Line 31: | ||
| **Electrification** | 750V DC\\ (overhead wire and\\ third rail) | | | **Electrification** | 750V DC\\ (overhead wire and\\ third rail) | | ||
^ Route Map |^ | ^ Route Map |^ | ||
- | | {{ : | + | | {{ : |
<WRAP right> | <WRAP right> | ||
Line 81: | Line 81: | ||
On 4 April 2023, Lilypad Rail started a big project at Tempest. This started with a new route 717 from Tempest to Sunrise via a 3 quarter clockwise loop. The project developed quickly and the following changes are made:\\ - 717 forms a complete loop and splits into 2 circular route, 717 and 718\\ - A smaller loop is built at the southwest of the big loop, and forms 2 circular route, 721 and 722, namely “Tempest South Circular”\\ - Qingli Railways proposed 2 new routes, 735 and 736. 735 runs from Sunrise to Dynamic (in the west of the loop) via the horizontal diameter of the bigger loop. 736 runs from Tempest to Sunrise, via 2 quarter of the smaller loop in anti clockwise direction, then continue via the bigger loop in clockwise direction.\\ - A new station near Dynamic, Tao Tung, is built for terminating trains of Route 721, 722, 735.\\ - Qingli Railways proposed a shorter version of route 736, which was later assigned with the route number 736P, running from Tempest to Tao Tung.\\ **- As the number of collaborative lines are much more than expected, Lilypad Rail suggested to co-own the Lilypad Light Rail and Qingli Light Rail systems. Qingli Railways accepted this idea. This plan was implemented soon after the confirmation of this proposal. The system is then renamed into Lilac Light Rail system.** | On 4 April 2023, Lilypad Rail started a big project at Tempest. This started with a new route 717 from Tempest to Sunrise via a 3 quarter clockwise loop. The project developed quickly and the following changes are made:\\ - 717 forms a complete loop and splits into 2 circular route, 717 and 718\\ - A smaller loop is built at the southwest of the big loop, and forms 2 circular route, 721 and 722, namely “Tempest South Circular”\\ - Qingli Railways proposed 2 new routes, 735 and 736. 735 runs from Sunrise to Dynamic (in the west of the loop) via the horizontal diameter of the bigger loop. 736 runs from Tempest to Sunrise, via 2 quarter of the smaller loop in anti clockwise direction, then continue via the bigger loop in clockwise direction.\\ - A new station near Dynamic, Tao Tung, is built for terminating trains of Route 721, 722, 735.\\ - Qingli Railways proposed a shorter version of route 736, which was later assigned with the route number 736P, running from Tempest to Tao Tung.\\ **- As the number of collaborative lines are much more than expected, Lilypad Rail suggested to co-own the Lilypad Light Rail and Qingli Light Rail systems. Qingli Railways accepted this idea. This plan was implemented soon after the confirmation of this proposal. The system is then renamed into Lilac Light Rail system.** | ||
- | On 10 April 2023, construction began on Route 992. Originally, Route 992's alignment was planned as a ferry from Exchange Place to Royal Shore via Badgerstown and the backside of Blacklea Mountain. Construction on the ferry pier at Exchange Place was already completed at that time. However, it was decided instead to create a Light Rail route. S43-Tec Light Rail vehicles were chosen for the route as the layout of the former ferry pier would not have allowed for Hong Kong LRVs. The line was opened between Exchange Place and Wald-Tafelberge on 11 April 2023, and extensions | + | On 10 April 2023, construction began on Route 992. Originally, Route 992's alignment was planned as a ferry from Exchange Place to Royal Shore via Badgerstown and the backside of Blacklea Mountain. Construction on the ferry pier at Exchange Place was already completed at that time. However, it was decided instead to create a Light Rail route. S43-Tec Light Rail vehicles were chosen for the route as the layout of the former ferry pier would not have allowed for Hong Kong LRVs. The line was opened between Exchange Place and Wald-Tafelberge on 11 April 2023, with extensions |
On 30 April 2023, during the construction of the South Continental Line, Lilypad Rail had made an assessment and released a plan to connect Winry and Ishima stations. The former is the terminus of the Blau LRT, and the latter being a stop on the South Continental Line. The line was thus named "Blau LRT Branch Line" despite not being connected track-wise to the original Blau LRT. | On 30 April 2023, during the construction of the South Continental Line, Lilypad Rail had made an assessment and released a plan to connect Winry and Ishima stations. The former is the terminus of the Blau LRT, and the latter being a stop on the South Continental Line. The line was thus named "Blau LRT Branch Line" despite not being connected track-wise to the original Blau LRT. | ||
Line 91: | Line 91: | ||
The whole Tempest plan was completed on 9 July 2023. Route T717 was also installed at Sunrise station to transport passengers from platform 5 to platform 6, as well as to allow trains to switch platforms and change from routes 717 to 718. | The whole Tempest plan was completed on 9 July 2023. Route T717 was also installed at Sunrise station to transport passengers from platform 5 to platform 6, as well as to allow trains to switch platforms and change from routes 717 to 718. | ||
- | On 20 October 2023, Qingli Railways proposed the "Lilac Light Rail Reform Plan 2023". This includes the following plans: \\ - Removal of [[lrt_101|route 101]] :-)\\ - Extension of [[lrt_115|route 115]] to Hot Springs, and set up a new route 115D for trains going back to Yi Long Depot. | + | On 20 October 2023, Qingli Railways proposed the "Lilac Light Rail Reform Plan 2023". This includes the following plans: \\ - Removal of [[lrt_101|route 101]] \\ - Extension of [[lrt_115|route 115]] to Hot Springs, and set up a new route 115D for trains going back to Yi Long Depot. \\ - Removal of [[lrt_482p|route 482P]] \\ - Extension of [[lrt_578e|route 578E]] to Sunrise \\ - New [[lrt_601|route 601]] from Jonathan' |
On 22 October 2023, the track connection between Spruce Forest and Puketeraki is completed. Route 115 is extended to Hot Springs. Route 115D also entered service for trains going back to the Depot. | On 22 October 2023, the track connection between Spruce Forest and Puketeraki is completed. Route 115 is extended to Hot Springs. Route 115D also entered service for trains going back to the Depot. | ||
Line 97: | Line 97: | ||
On 23 October 2023, Loyalty Hills Light Rail Terminal is completed. Route 715 entered service, running from Daimon Island to Loyalty Hills. | On 23 October 2023, Loyalty Hills Light Rail Terminal is completed. Route 715 entered service, running from Daimon Island to Loyalty Hills. | ||
- | On 29 October 2023, Royal Park is completed for future connections to Elizabeth Line. Routes 483P, 801, 802, 810, 882 serve this stop. Routes 803 and 804 will be added in the future. | + | On 29 October 2023, Royal Park is completed for future connections to Elizabeth Line. Routes 483P, 801, 802, 810, 882 serve this stop. Routes 803 and 804 were later added to the roster of routes that call at this station. |
- | On 1 November 2023, Kallos stop is removed from routes 801, 802 and 802S. | + | On 1 November 2023, Kallos stop is removed from routes 801, 802 and 802S, and the following day, Route 804 entered service, running between Taipa and Kallos/ |
- | On 2 November | + | On 11 December |
+ | On 13 March 2024, Route 992 was extended from Wald-Tafelberge to Old Depot with an intermediate stop at Grumbler' | ||
+ | |||
+ | On 7 April 2024, Route 201 and 202 entered service, running between Eastwich Ferry Pier (or Eastwich-on-Sea) and Rhoam Coast. | ||
+ | |||
+ | On 16 April 2024, Route P300 entered service, running between Sunrise and Kuk Wu. It was the first premium express light rail route, and it runs fully on the rapid tracks. | ||
+ | |||
+ | On 26 April 2024, the track connection between Kuk Wu and Zein was completed. Route P300 was extended from Kuk Wu to Zein with an intermediate stop at West Tung Suet Chau. Route 300 entered service, running between Sunrise and Zein. Route 271P was extended from Tao Tung to Zein via One-man Island and Kuk Wu, and Tao Tung stop was removed. | ||
+ | |||
+ | On 28 April 2024, the track connection between Satoyama, Tempest and Zein was completed. Route 761 changed its route after Tempest, terminating at Zein instead of Tao Tung. Route 271 was extended from Tao Tung to Zein via One-man Island and Satoyama, and Tao Tung stop was removed. | ||
+ | |||
+ | On 4 May 2024, Route 771X entered service, running between Tao Tung and Zein via One-man Island and Kuk Wu. It runs on the rapid tracks between Kuk Wu and Zein, so it's called a ' | ||
===== Rolling Stock ===== | ===== Rolling Stock ===== | ||
Line 230: | Line 241: | ||
^ Phase/ | ^ Phase/ | ||
| **Light Rail Phase I** | KCR Orange | 2 | | | **Light Rail Phase I** | KCR Orange | 2 | | ||
- | |**Light Rail Phase II**|::: | + | | **Light Rail Phase II** | ::: | ::: | |
===== Stops and Routes ===== | ===== Stops and Routes ===== | ||
Line 274: | Line 285: | ||
| @#D8E8C4:\\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ <color # | | @#D8E8C4:\\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ <color # | ||
| ::: | No Hideokamon | ::: | ::: | ::: | ::: | | | ::: | No Hideokamon | ::: | ::: | ::: | ::: | | ||
- | | ::: | Shuangmen Xuegui | + | | ::: | Froastpoarte |
| ::: | Qiuyou Yanji | ::: | ::: | ::: | ::: | | | ::: | Qiuyou Yanji | ::: | ::: | ::: | ::: | | ||
| ::: | Kaijin Ferry Pier | 410, 483P, 882 | ::: | ::: | 7 November 2022 | | | ::: | Kaijin Ferry Pier | 410, 483P, 882 | ::: | ::: | 7 November 2022 | | ||
Line 322: | Line 333: | ||
| ::: | East San Shek Wan | 715 | ::: | ::: | 23 October 2023 | | | ::: | East San Shek Wan | 715 | ::: | ::: | 23 October 2023 | | ||
| ::: | Loyalty Hills | 715 | ::: | <color white/# | | ::: | Loyalty Hills | 715 | ::: | <color white/# | ||
- | | @#C0D7F7:\\ \\ \\ \\ \\ \\ <color # | + | | @#C0D7F7:\\ \\ \\ \\ \\ \\ <color # |
| ::: | Tsing Fung | ::: | ::: | ::: | ::: | | | ::: | Tsing Fung | ::: | ::: | ::: | ::: | | ||
| ::: | < | | ::: | < | ||
Line 374: | Line 385: | ||
| ::: | Copper Grove | ::: | ::: | ::: | ::: | | | ::: | Copper Grove | ::: | ::: | ::: | ::: | | ||
| ::: | Shan King | ::: | ::: | ::: | ::: | | | ::: | Shan King | ::: | ::: | ::: | ::: | | ||
- | | @#FFD5E9:\\ \\ \\ \\ <color # | + | | @#FFD5E9:\\ \\ \\ \\ <color # |
+ | | ::: | Grumbler' | ||
| ::: | Wald-Tafelberge | ::: | ::: | <color white/# | | ::: | Wald-Tafelberge | ::: | ::: | <color white/# | ||
| ::: | Cape Lake | ::: | ::: | | ::: | | | ::: | Cape Lake | ::: | ::: | | ::: | | ||
- | | ::: | Badgerstown | ::: | ::: | ::: | ::: | | + | | ::: | Badgerstown | ::: | ::: | <color /# |
| ::: | Exchange Place | ::: | ::: | <color white/# | | ::: | Exchange Place | ::: | ::: | <color white/# | ||
- | | | Sah Tou Emergency Platform | when service fails, a\\ temporary terminal\\ stop for\\ 410, 492, 483P | Chou Wai | | 10 February 2023 | | + | | | Sah Tou Emergency Platform | When service fails, a\\ temporary terminal\\ stop for\\ 410, 492, 483P, 633P | Chou Wai | | 10 February 2023 | |
===== Routes ===== | ===== Routes ===== | ||
Line 392: | Line 403: | ||
))(via Innner Harbour Ferry Terminal, Sun Fat) \\ {{721.png? | ))(via Innner Harbour Ferry Terminal, Sun Fat) \\ {{721.png? | ||
Airport South stop in Heung Fan Liu Airport | Airport South stop in Heung Fan Liu Airport | ||
- | ))\\ (via Oculus Center, stops at Resort North Village and Jonathan’s Resort in Airport South direction, and stops at Badsand Beach in Light Rail Depot direction) \\ {{992.png? | + | ))\\ (via Oculus Center, stops at Resort North Village and Jonathan’s Resort in Airport South direction, and stops at Badsand Beach in Light Rail Depot direction) \\ {{992.png? |
- | Proposed: Old Depot ⇄ Exchange | + | |
- | ))(via Cape Lake, Badgerstown) | + | |
- | **Special Services:** \\ {{115D.png? | + | **Special Services:** \\ {{115D.png? |
**Discontinued Services:** \\ - **801X** : Light Rail Depot to Lei Yue Mun, put into service on 10 September 2022, through runs on Chin Ka Village Light Rail (Route 762) from Toitoi to Lei Yue Mun. As route 802 is extended to Toitoi on 4 December 2022, this route is discontinued because it can no longer provide more efficiency for passengers. \\ - **643** : Taipa to Light Rail Depot (above-ground platforms) via Royal Park in Light Rail Depot direction, and direct to Mou Lun in Taipa direction. Was in service for less than one day as a public test route during the construction of the Taipa-Kallos connection, but construction on the 804 route was completed in time for full open service without the temporary 643 route. | **Discontinued Services:** \\ - **801X** : Light Rail Depot to Lei Yue Mun, put into service on 10 September 2022, through runs on Chin Ka Village Light Rail (Route 762) from Toitoi to Lei Yue Mun. As route 802 is extended to Toitoi on 4 December 2022, this route is discontinued because it can no longer provide more efficiency for passengers. \\ - **643** : Taipa to Light Rail Depot (above-ground platforms) via Royal Park in Light Rail Depot direction, and direct to Mou Lun in Taipa direction. Was in service for less than one day as a public test route during the construction of the Taipa-Kallos connection, but construction on the 804 route was completed in time for full open service without the temporary 643 route. | ||
+ | |||
+ | {{: | ||
**Shelved lines:** \\ - **719P (first generation)** : Tempest to Eastwich-on-sea (via Toodeepic Ocean), as it was just completely overlapping 736P without bringing any benefits to the light rail system, this route was set aside. \\ - **723P** : Tao Tung -> Sunrise (via Big Stick), this was a depot route planned to let trains carry passengers when gonig back to Sunrise depot from Tao Tung. In the final plan, the last instruction of Sunrise Depot was set to be 735 towards Sunrise, this depot route was no longer needed and was set aside.\\ - **802K**: Light Rail Depot to South Memorial. This route was raised by Qingli Railways to connect the 505 Memorial loop to the main light rail system, with a 15 minute frequency. This route plan was soon replaced by 578E which goes from South Memorial to Tempest. This route has been raised again in the "Lilac Light Rail Reform Plan 2023" as the frequency of 578E is far from enough to carry passengers out of the Memorial area to other light rail stops. | **Shelved lines:** \\ - **719P (first generation)** : Tempest to Eastwich-on-sea (via Toodeepic Ocean), as it was just completely overlapping 736P without bringing any benefits to the light rail system, this route was set aside. \\ - **723P** : Tao Tung -> Sunrise (via Big Stick), this was a depot route planned to let trains carry passengers when gonig back to Sunrise depot from Tao Tung. In the final plan, the last instruction of Sunrise Depot was set to be 735 towards Sunrise, this depot route was no longer needed and was set aside.\\ - **802K**: Light Rail Depot to South Memorial. This route was raised by Qingli Railways to connect the 505 Memorial loop to the main light rail system, with a 15 minute frequency. This route plan was soon replaced by 578E which goes from South Memorial to Tempest. This route has been raised again in the "Lilac Light Rail Reform Plan 2023" as the frequency of 578E is far from enough to carry passengers out of the Memorial area to other light rail stops. |
mtr_letsplay/lilac_light_rail.1706333821.txt.gz · Last modified: 2024/01/27 05:37 by cokestudio