User Tools

Site Tools


mtr_letsplay:kwong_chow_station

This is an old revision of the document!


Table of Contents

Kwong Chow Station

This wiki page is work in progress.

Kwong Chow
光州

Platfroms
(taken on 21 January, 2024)
Overview
Operator West Lake Transport Authority
Lines Line 1 (Meyan Line) Phase 1
Line 2 (Kwong Chow - North Coast Line
Owner BDark000
Region West Lake
Platforms 4
Tracks 4
Coordinates (-2130, 2304)
Station
Type Underground
Floors 3
Platform Floors 2
Step-Free Accessible Yes
Station Code KWC
Opened 22 December, 2022
Electrification 25kV Overhead Cable AC (WIP)
(Line 1 (Meyan Line) Phase 1)
1.5kV Overhead Cable DC (WIP)
(Line 2 (Kwong Chow - North Coast Line))

Kwong Chow Station (Chinese: 光州站) is a station in the West Lake Area built by BDark000. It is the western terminus of Line 2 (Kwong Chow - North Coast Line) and the southern terminus of Line 1 (Meyan Line) Phase 1. It will become a mid-way stop of Line 1 (Meyan Line) after the phase 2 is done.

History

  • early September, 2022: Station starts designing. It was originally designed to be a wide island platform serving Line 1 (Meyan Line) separated with a pair of stacked tracks of Line 2 (Kwong Chow - North Coast Line).

Layout

G Under Construction Exit A
L1 Concourse Exit B: Birch Forest
L2 Line 1 (Meyan Line) Phase 1 Platforms
Side Platform
Platform 1 Line 1 (Meyan Line) Phase 1 to Hung Ngai Tung
Platform 2 Line 1 (Meyan Line) Phase 1 to Kwong Chow
Side Platform
L3 Plant Room
L4 Transfer Lobby
L5 WR SW Plains Line Platforms
Side Platform
Platform 3 WR SW Plains Line to Chong Shu Chau
Platform 4 WR SW Plains Line to Lake City
Side Platform
mtr_letsplay/kwong_chow_station.1705899475.txt.gz · Last modified: 2024/01/22 04:57 by bdark000