mtr_letsplay:kwong_chow_station
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
mtr_letsplay:kwong_chow_station [2024/02/13 13:41] – Moving more contents from timeline to history bdark000 | mtr_letsplay:kwong_chow_station [2024/10/12 08:00] (current) – Update destinations and L2(KNL) name bdark000 | ||
---|---|---|---|
Line 11: | Line 11: | ||
| **Operator** | [[/ | | **Operator** | [[/ | ||
| **Lines** | [[/ | | **Lines** | [[/ | ||
- | | ::: | [[/ | + | | ::: | [[/ |
| **Owner** | [[mtr_community: | | **Owner** | [[mtr_community: | ||
| **Region** | [[mtr_letsplay: | | **Region** | [[mtr_letsplay: | ||
Line 25: | Line 25: | ||
| **Opened** | 22 December, 2022 | | | **Opened** | 22 December, 2022 | | ||
| **Electrification** | 25kV Overhead Cable AC (WIP)\\ //(Line 1 (Meyan Line) Phase 1)// | | | **Electrification** | 25kV Overhead Cable AC (WIP)\\ //(Line 1 (Meyan Line) Phase 1)// | | ||
- | | ::: | 1.5kV Overhead Cable DC (WIP)\\ //(Line 2 (Kwong | + | | ::: | 1.5kV Overhead Cable DC (WIP)\\ //(Line 2 (Kwong |
</ | </ | ||
- | **Kwong Chow Station** (Chinese: // | + | **Kwong Chow Station** (Chinese: // |
The station gets featured for a couple of times in Jonathan' | The station gets featured for a couple of times in Jonathan' | ||
Line 35: | Line 35: | ||
When [[/ | When [[/ | ||
- | After the planned light rail routes are upgraded to rapid transit, the area is no longer sufficient to support two stations. Hence, they are merged to one, and **Kwong Chow** is picked while **Chai Chow** is dropped. It was planned to have a vast space for the platform structure, being two side platforms with at least 8m tall and 19m apart from each other, serving [[/ | + | After the planned light rail routes are upgraded to rapid transit, the area is no longer sufficient to support two stations. Hence, they are merged to one, and **Kwong Chow** is picked while **Chai Chow** is dropped. It was planned to have a vast space for the platform structure, being two side platforms with at least 8m tall and 19m apart from each other, serving [[/ |
Unfortunately, | Unfortunately, | ||
Line 48: | Line 48: | ||
* 22 December, 2022: Station is open to the public as well as the extension of WLT Line 1 Phase 1 from Birch Hill station to this station. | * 22 December, 2022: Station is open to the public as well as the extension of WLT Line 1 Phase 1 from Birch Hill station to this station. | ||
* early January, 2023: Step-free access is now fully available after a new lift exit is added to Exit D. | * early January, 2023: Step-free access is now fully available after a new lift exit is added to Exit D. | ||
- | * 24 June, 2023: Line 2 (Kwong Chow - North Coast Line) runs a shuttle service (later known as W. Section Temp Shuttle) between this station and [[/ | + | * 24 June, 2023: Line 2 (Kwong Pak Kwun Line) (called |
* early December, 2023: A small renovation on the stairs is done. Most of the staircases in the station are extended and leave a small space in the middle for better safety and passengers experience. Also, the downward escalator from south concourse to platform 1 has been removed and become part of the staircase for better crowd control. | * early December, 2023: A small renovation on the stairs is done. Most of the staircases in the station are extended and leave a small space in the middle for better safety and passengers experience. Also, the downward escalator from south concourse to platform 1 has been removed and become part of the staircase for better crowd control. | ||
+ | * 18 May, 2024: Station becomes a mid-way stop of Line 1 (Meyan Line) Phase 1 when the line extends to [[/ | ||
===== Layout ===== | ===== Layout ===== | ||
Line 55: | Line 56: | ||
Not counting exits, there are a total of 3 floors in the station. **L1** is concourse and is separated into north and south part not directly accessible to each other, due to [[/ | Not counting exits, there are a total of 3 floors in the station. **L1** is concourse and is separated into north and south part not directly accessible to each other, due to [[/ | ||
- | Platforms 1, 3 stack on top of platforms 2, 4 on the two sides. In between is the core structure. Under the concourse on two ends, it consists of walls, passages, staircases and escalators. Under the canal, it has the famous high ceiling spacious and open design, with chandeliers hung between the pillars. To facilitate the interchange at the upper platforms, a passageway in the middle is built to further connect up platforms 1 and 3. And since future interchange between [[mtr_letsplay: | + | Platforms 1, 3 stack on top of platforms 2, 4 on the two sides. In between is the core structure. Under the concourse on two ends, it consists of walls, passages, staircases and escalators. Under the canal, it has the famous high ceiling spacious and open design, with chandeliers hung between the pillars. To facilitate the interchange at the upper platforms, a passageway in the middle is built to further connect up platforms 1 and 3. And since future interchange between [[mtr_letsplay: |
One lift is serving between north concourse and the platforms, while another is serving between south concourse and the platforms. The lift serving south concourse is larger due to a higher anticipated passengers flow and capacity needed. | One lift is serving between north concourse and the platforms, while another is serving between south concourse and the platforms. The lift serving south concourse is larger due to a higher anticipated passengers flow and capacity needed. | ||
Line 69: | Line 70: | ||
| **L2** | **Upper Platforms** || | | **L2** | **Upper Platforms** || | ||
| ::: | @#EB7AE9: || | | ::: | @#EB7AE9: || | ||
- | | ::: | Platform **1** | [[mtr_letsplay: | + | | ::: | Platform **1** | [[mtr_letsplay: |
| ::: | | | ::: | | ||
- | | ::: | Platform **3** | <- [[mtr_letsplay: | + | | ::: | Platform **3** | <- [[mtr_letsplay: |
| ::: | @#FFDA33: || | | ::: | @#FFDA33: || | ||
| **L3** | **Lower Platforms**|| | | **L3** | **Lower Platforms**|| | ||
| ::: | @#EB7AE9: || | | ::: | @#EB7AE9: || | ||
- | | ::: | Platform **2** | <- [[mtr_letsplay: | + | | ::: | Platform **2** | <- [[mtr_letsplay: |
| ::: | | | ::: | | ||
- | | ::: | Platform **4** | [[mtr_letsplay: | + | | ::: | Platform **4** | [[mtr_letsplay: |
| ::: | @#FFDA33: || | | ::: | @#FFDA33: || | ||
Line 97: | Line 98: | ||
===== Train Services ===== | ===== Train Services ===== | ||
- | Passengers may take Line 1 (Meyan Line) Phase 1 heading towards Sakura Stream Area or Line 2 (Kwong | + | Passengers may take Line 1 (Meyan Line) Phase 1 heading towards |
| **[[mtr_letsplay: | | **[[mtr_letsplay: | ||
| @#EB7AE9: | | | @#EB7AE9: | | ||
- | | //< | + | | |
- | | **[[mtr_letsplay: | + | | **[[mtr_letsplay: |
| @#FFDA33: | | | @#FFDA33: | | ||
- | | **Kwong Chow** - //< | + | | **Kwong Chow** |
mtr_letsplay/kwong_chow_station.1707831710.txt.gz · Last modified: 2024/02/13 13:41 by bdark000