mtr_letsplay:kwong_chow_station
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
mtr_letsplay:kwong_chow_station [2024/01/22 05:47] – Restructure Line / Train Services bdark000 | mtr_letsplay:kwong_chow_station [2024/10/12 08:00] (current) – Update destinations and L2(KNL) name bdark000 | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Kwong Chow Station ====== | ====== Kwong Chow Station ====== | ||
- | <WRAP todo> | ||
<WRAP right> | <WRAP right> | ||
Line 12: | Line 11: | ||
| **Operator** | [[/ | | **Operator** | [[/ | ||
| **Lines** | [[/ | | **Lines** | [[/ | ||
- | | ::: | [[/ | + | | ::: | [[/ |
- | | **Owner** | [[mtr_community: | + | | **Owner** | [[mtr_community:staff: |
| **Region** | [[mtr_letsplay: | | **Region** | [[mtr_letsplay: | ||
| **Platforms** | 4 | | | **Platforms** | 4 | | ||
Line 26: | Line 25: | ||
| **Opened** | 22 December, 2022 | | | **Opened** | 22 December, 2022 | | ||
| **Electrification** | 25kV Overhead Cable AC (WIP)\\ //(Line 1 (Meyan Line) Phase 1)// | | | **Electrification** | 25kV Overhead Cable AC (WIP)\\ //(Line 1 (Meyan Line) Phase 1)// | | ||
- | | ::: | 1.5kV Overhead Cable DC (WIP)\\ //(Line 2 (Kwong | + | | ::: | 1.5kV Overhead Cable DC (WIP)\\ //(Line 2 (Kwong |
</ | </ | ||
- | **Kwong Chow Station** (Chinese: 光州站) is a station in the [[mtr_letsplay: | + | **Kwong Chow Station** (Chinese: |
The station gets featured for a couple of times in Jonathan' | The station gets featured for a couple of times in Jonathan' | ||
===== History ===== | ===== History ===== | ||
- | | + | When [[/ |
+ | |||
+ | After the planned light rail routes are upgraded to rapid transit, the area is no longer sufficient to support two stations. Hence, they are merged to one, and **Kwong Chow** is picked while **Chai Chow** is dropped. It was planned to have a vast space for the platform | ||
+ | |||
+ | Unfortunately, | ||
+ | |||
+ | Although the plan that brings the most convenience to passengers doesn' | ||
+ | |||
+ | ==== Timeline ==== | ||
+ | * late July, 2022: Initial plan of transportation in the West Lake Area is out. Stations are not yet confirmed but planned to have two near now **Kwong Chow** station. | ||
+ | * early August, 2022: WLT confirms that only one **Kwong Chow** station will be built. | ||
+ | * early September, 2022: Station starts planning for Line 1 split side platforms and Line 2 stacked double-sided side platforms proposal. | ||
+ | * mid October, 2022: Station layout is revised to how it looks now. | ||
+ | * 22 December, 2022: Station is open to the public as well as the extension of WLT Line 1 Phase 1 from Birch Hill station to this station. | ||
+ | * early January, 2023: Step-free access is now fully available after a new lift exit is added to Exit D. | ||
+ | * 24 June, 2023: Line 2 (Kwong Pak Kwun Line) (called | ||
* early December, 2023: A small renovation on the stairs is done. Most of the staircases in the station are extended and leave a small space in the middle for better safety and passengers experience. Also, the downward escalator from south concourse to platform 1 has been removed and become part of the staircase for better crowd control. | * early December, 2023: A small renovation on the stairs is done. Most of the staircases in the station are extended and leave a small space in the middle for better safety and passengers experience. Also, the downward escalator from south concourse to platform 1 has been removed and become part of the staircase for better crowd control. | ||
+ | * 18 May, 2024: Station becomes a mid-way stop of Line 1 (Meyan Line) Phase 1 when the line extends to [[/ | ||
===== Layout ===== | ===== Layout ===== | ||
- | There are in total of 3 floors in the station. One lift is serving between north concourse and the platforms, while another is serving between south concourse and the platforms. | + | Not counting exits, there are a total of 3 floors in the station. |
+ | |||
+ | Platforms 1, 3 stack on top of platforms 2, 4 on the two sides. In between is the core structure. Under the concourse on two ends, it consists of walls, passages, staircases and escalators. Under the canal, it has the famous high ceiling spacious and open design, with chandeliers hung between the pillars. To facilitate the interchange at the upper platforms, a passageway in the middle is built to further connect up platforms 1 and 3. And since future interchange between [[mtr_letsplay: | ||
+ | |||
+ | One lift is serving between north concourse and the platforms, while another is serving between south concourse and the platforms. The lift serving south concourse is larger due to a higher anticipated passengers flow and capacity needed. | ||
<WRAP left> | <WRAP left> | ||
- | | **G** | //Under Construction// | + | | **U1** |**South Side Exits**|**North Side Exits**| |
- | | **L1** | **Concourse** | Exit B: Birch Forest | + | | ::: | Exit A2 | | |
- | | **L2** | @# | + | | **G** |**South Side Exits** | **North Side Exits** | |
- | | ::: | Side Platform | + | | ::: | Exit A1, Exit B | Exit C, Exit D | |
- | | ::: | Platform **1** | [[mtr_letsplay: | + | | **L1** | **South Concourse** | **North Concourse** | |
- | | ::: | Platform **2** | <- [[mtr_letsplay: | + | | ::: | Customer Service Centre, Tickets || |
- | | ::: | Side Platform | + | | **L2** | **Upper Platforms** || |
- | | **L3** | + | | ::: | @# |
- | | **L4** | Transfer Lobby || | + | | ::: | Platform **1** | [[mtr_letsplay: |
- | | **L5** | @#0FBFE4: **[[mtr_letsplay: | + | | ::: | |
- | | ::: | Side Platform | + | | ::: | Platform **3** | <- [[mtr_letsplay: |
- | | ::: | Platform **3** | [[mtr_letsplay: | + | | ::: | @# |
- | | ::: | Platform **4** | <- [[mtr_letsplay: | + | | **L3** | **Lower Platforms**|| |
- | | ::: | Side Platform | + | | ::: | @# |
+ | | ::: | Platform **2** | <- [[mtr_letsplay: | ||
+ | | ::: | | ||
+ | | ::: | Platform **4** | [[mtr_letsplay: | ||
+ | | ::: | @# | ||
</ | </ | ||
Line 65: | Line 88: | ||
* A1: BDark Kwong Chow Castle | * A1: BDark Kwong Chow Castle | ||
* A2: Yu Kwong Village | * A2: Yu Kwong Village | ||
- | * B: Sai Wan (has lift) | + | * B: Sai Wan {{mtr: |
* C: BDark' | * C: BDark' | ||
* C1: BDark' | * C1: BDark' | ||
* C2: Kwong Chow North Area | * C2: Kwong Chow North Area | ||
- | * D: Kwong Chow Pier (has lift) | + | * D: Kwong Chow Pier {{mtr: |
* D1: Kwong Chow Pier | * D1: Kwong Chow Pier | ||
* D2: Welcome Cape | * D2: Welcome Cape | ||
Line 75: | Line 98: | ||
===== Train Services ===== | ===== Train Services ===== | ||
- | Passengers may take Line 1 (Meyan Line) Phase 1 heading towards Sakura Stream Area or Line 2 (Kwong | + | Passengers may take Line 1 (Meyan Line) Phase 1 heading towards |
+ | |||
+ | | **[[mtr_letsplay: | ||
+ | | @#EB7AE9: | | ||
+ | | [[/ | ||
- | | @# | + | | **[[mtr_letsplay: |
- | | ⇅ | [[mtr_letsplay: | + | | @#FFDA33: | |
- | | ⇅ | [[mtr_letsplay: | + | | **Kwong Chow** |
- | | ◉ | Birch Hill | ::: | ◉ | Birch Hill | | + | |
- | | ⇅ | [[mtr_letsplay: | + | |
- | | ⇅ | ... | ::: | ⇅ | [[mtr_letsplay: | + | |
- | | ⇅ | | ::: | || | + |
mtr_letsplay/kwong_chow_station.1705902466.txt.gz · Last modified: 2024/01/22 05:47 by bdark000