mtr_letsplay:kallos_express
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
mtr_letsplay:kallos_express [2023/10/16 07:29] – Added some light rail routes tea_bocchi | mtr_letsplay:kallos_express [2024/04/20 01:50] (current) – Fix a terminal error xpgd | ||
---|---|---|---|
Line 9: | Line 9: | ||
|**Owner**|[[/ | |**Owner**|[[/ | ||
|**Locale**|[[/ | |**Locale**|[[/ | ||
- | |**Termini**|[[/ | + | |**Terminal**|[[/ |
|**Connecting Lines**|@# | |**Connecting Lines**|@# | ||
| ::: |@# | | ::: |@# | ||
Line 38: | Line 38: | ||
</ | </ | ||
- | The **Kallos Express** (Chinese: 麗灣特快) is one of the five metro lines of the [[/ | + | The **Kallos Express** (Chinese: 麗灣特快) is one of the five metro lines of the [[/ |
The line first opened on 1 August 2022. As of 2023 it travels 23.2 kilometres (14.4 mi) in 14 minutes along its route, serving 7 stations. The line is indicated by the colour greenish-blue on the Let’s Play System Map. | The line first opened on 1 August 2022. As of 2023 it travels 23.2 kilometres (14.4 mi) in 14 minutes along its route, serving 7 stations. The line is indicated by the colour greenish-blue on the Let’s Play System Map. | ||
Line 49: | Line 49: | ||
===Improvement of transportation to Jonathan’s Resort=== | ===Improvement of transportation to Jonathan’s Resort=== | ||
- | The Lilac Light Rail (former Qingli Light Rail or Kallos Light Rail) Route 882 was built to connect Kallos and Jonathan’s Resort. However, the journey takes over 25 minutes between the two places, and it is low in efficiency. The Qingli Railways suggested to let Jonathan’s Resort to be one of the stops in the Kallos Express Future Development project to greatly reduce the time to travel, with construction starting in October | + | The Lilac Light Rail (former Qingli Light Rail or Kallos Light Rail) Route 882 was built to connect Kallos and Jonathan’s Resort. However, the journey takes over 25 minutes between the two places, and it is low in efficiency. The Qingli Railways suggested to let Jonathan’s Resort to be one of the stops in the Kallos Express Future Development project to greatly reduce the time to travel, with construction starting in November |
The Jonathan’s Resort interchange opened on 18 December 2022, and proved to be a much efficient method of travelling, reducing the travel time from Kallos to Jonathan’s Resort from 25 minutes to 2 minutes. The Lilac Light Rail 882 is still kept running to serve places between the two stations. | The Jonathan’s Resort interchange opened on 18 December 2022, and proved to be a much efficient method of travelling, reducing the travel time from Kallos to Jonathan’s Resort from 25 minutes to 2 minutes. The Lilac Light Rail 882 is still kept running to serve places between the two stations. | ||
Line 93: | Line 93: | ||
|@# | |@# | ||
|::: | |::: | ||
- | |:::|:::|@#E979E7:<color white>WLT Line 1 (proposed)</ | + | |:::|:::|@#EB7AE9:<color white>[[wlt_line_1|Line 1 (Meyan Line)]] (WIP)</ |
|@# | |@# | ||
|::: | |::: | ||
Line 102: | Line 102: | ||
|::: | |::: | ||
|::: | |::: | ||
- | |::: | + | |::: |
- | |:::|:::|@#000000:<color white>High Speed Rail</ | + | |:::|:::|{{hsrlogo.jpeg? |
|@# | |@# | ||
- | |:::|:::|@#D3A80A:<color white>Light Rail</ | + | |:::|:::|{{lrtlogo.png? |
|@# | |@# | ||
|::: | |::: | ||
|@# | |@# | ||
|::: | |::: | ||
- | |:::|:::|@#D3A80A:<color white>Light Rail</ | + | |:::|:::|{{lrtlogo.png? |
mtr_letsplay/kallos_express.1697441352.txt.gz · Last modified: 2023/10/16 07:29 by tea_bocchi