User Tools

Site Tools


mtr_letsplay:hung_ngai_tung_station

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
mtr_letsplay:hung_ngai_tung_station [2024/04/16 09:39] – [Layout (WIP)] Finishing section bdark000mtr_letsplay:hung_ngai_tung_station [2024/10/12 07:50] (current) – [Layout] Update platform 1 destination bdark000
Line 1: Line 1:
-====== Hung Ngai Tung Station [WIP] ======+====== Hung Ngai Tung Station ======
  
  
Line 25: Line 25:
  
 </WRAP> </WRAP>
-**Hung Ngai Tung Station** (Chinese: //紅崖洞站//) is a station in the Sakura Stream Area built by [[mtr_community:staff:bdark000|BDark000]] on behalf of [[/west_lake_transport_authority|West Lake Transport Authority (WLT)]]. It is the temporary northern terminus of [[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]] before the renovation between [[/northern_snow_village_station|Northern Snow Village]] station and this station is done. It will become a mid-way stop of Line 1 (Meyan Line) afterwards+**Hung Ngai Tung Station** (Chinese: //紅崖洞站//) is a station in the Sakura Stream Area built by [[mtr_community:staff:bdark000|BDark000]] on behalf of [[/west_lake_transport_authority|West Lake Transport Authority (WLT)]]. It is a mid-way stop of Line 1 (Meyan Line). It was once the temporary northern terminus of [[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]] before the renovation between [[/northern_snow_village_station|Northern Snow Village]] station and this station is done. 
  
 The literal meaning of the Chinese name means //Red Clift and Cave//, comes from the Siberian Taiga biome, clifty terrain and large lush cave near the station. The station also shares a very similar name to a tourist attraction in Chongqing also located at a clift //Hongyadong (洪崖洞)//, but it is just a coincidence. The literal meaning of the Chinese name means //Red Clift and Cave//, comes from the Siberian Taiga biome, clifty terrain and large lush cave near the station. The station also shares a very similar name to a tourist attraction in Chongqing also located at a clift //Hongyadong (洪崖洞)//, but it is just a coincidence.
Line 42: Line 42:
   * early December, 2023: A small renovation on the stairs is done. Most of the staircases in the station are extended and leave a small space in the middle for better safety and passengers experience. Due to the staircases at Exit C being long, two spaces are added at around 1/3 and 2/3 of their length.    * early December, 2023: A small renovation on the stairs is done. Most of the staircases in the station are extended and leave a small space in the middle for better safety and passengers experience. Due to the staircases at Exit C being long, two spaces are added at around 1/3 and 2/3 of their length. 
   * 31 December, 2023: As the section between **Hung Ngai Tung** station and Northern Snow Village station is closed for renovation, incoming trains from the south only stop at platform 2 and then reverse back to the south.    * 31 December, 2023: As the section between **Hung Ngai Tung** station and Northern Snow Village station is closed for renovation, incoming trains from the south only stop at platform 2 and then reverse back to the south. 
 +  * 18 May, 2024: Platform 1 is used again as the section between this station and Northern Snow Village station has renovated.
 ===== Layout ===== ===== Layout =====
  
Line 57: Line 58:
 | ::: | Exit D | Exit C | | ::: | Exit D | Exit C |
 | **U4** | **Platform** || | **U4** | **Platform** ||
-| ::: | @#CCCCCC: || +| ::: | @#EB7AE9: || 
-| ::: | Platform **1** | <color #cccccc>//(currently not in use)//</color> |+| ::: | Platform **1** | [[mtr_letsplay:wlt_line_1|Line 1 (Meyan LinePhase 1]] to Mesa Mei Foo Wan -(Doors open on the right) |
 | ::: |   Island Platform   || | ::: |   Island Platform   ||
-| ::: | Platform **2** | <- [[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]] to Kwong Chow((Omits Sakura Stream Junction station; passengers for Sakura Stream Junction station should change to a train bound for **Hung Ngai Tung** at Providence station)) (Doors open on the left->right) |+| ::: | Platform **2** | <- [[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]] to Tai Po (Doors open on the right) |
 | ::: | @#EB7AE9: || | ::: | @#EB7AE9: ||
 | **U3** | **Concourse** || | **U3** | **Concourse** ||
Line 83: Line 84:
 ===== Train Services ===== ===== Train Services =====
  
-Passengers may take Line 1 (Meyan Line) Phase 1 heading south towards Sakura Stream Junction station and [[/west_lake_area|West Lake Area]]. Train service heading north will resume after renovation works are done+Passengers may take Line 1 (Meyan Line) Phase 1 heading south towards Sakura Stream Junction station and [[/west_lake_area|West Lake Area]] or heading north towards Mesa station via Northern Snowland. Stations in [[/the_biomes_at_x_-4500|The Biomes at X -4500]] is currently work in progress.
  
 |  **[[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]]**  | |  **[[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]]**  |
 | @#EB7AE9: | | @#EB7AE9: |
-|  //<color gray>Northern Snow Village</color>// - **Hung Ngai Tung** - [[/sakura_stream_junction_station|Sakura Stream Junction]] - [[mtr_letsplay:providence_station|Providence]] - [[/birch_hill_station|Birch Hill]] - [[mtr_letsplay:chung_kwo_kok_station|Chung Kwo Kok]] - [[/kwong_chow_station|Kwong Chow]]  |+|  [[/mesa_station|Mesa]] - //<color #cccccc>Chi Chuk</color>// - //<color #cccccc>Ying Mo</color>// - //<color #cccccc>Tung Yuen</color>// - Northern Snow Village - **Hung Ngai Tung** - [[/sakura_stream_junction_station|Sakura Stream Junction]] - [[mtr_letsplay:providence_station|Providence]] - [[/birch_hill_station|Birch Hill]] - [[mtr_letsplay:chung_kwo_kok_station|Chung Kwo Kok]] - [[/kwong_chow_station|Kwong Chow]] - //<color #cccccc>Yuen Chow Kok</color>// - [[/tai_po_station|Tai Po]]  |
  
mtr_letsplay/hung_ngai_tung_station.1713260343.txt.gz · Last modified: 2024/04/16 09:39 by bdark000