User Tools

Site Tools


mtr_letsplay:hung_ngai_tung_station

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
mtr_letsplay:hung_ngai_tung_station [2024/04/16 08:28] – [Timeline] fix typo and change some wordings bdark000mtr_letsplay:hung_ngai_tung_station [2024/10/12 07:50] (current) – [Layout] Update platform 1 destination bdark000
Line 1: Line 1:
-====== Hung Ngai Tung Station [WIP] ======+====== Hung Ngai Tung Station ======
  
  
Line 25: Line 25:
  
 </WRAP> </WRAP>
-**Hung Ngai Tung Station** (Chinese: //紅崖洞站//) is a station in the Sakura Stream Area built by [[mtr_community:staff:bdark000|BDark000]] on behalf of [[/west_lake_transport_authority|West Lake Transport Authority (WLT)]]. It is the temporary northern terminus of [[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]] before the renovation between [[/northern_snow_village_station|Northern Snow Village]] station and this station is done. It will become a mid-way stop of Line 1 (Meyan Line) afterwards+**Hung Ngai Tung Station** (Chinese: //紅崖洞站//) is a station in the Sakura Stream Area built by [[mtr_community:staff:bdark000|BDark000]] on behalf of [[/west_lake_transport_authority|West Lake Transport Authority (WLT)]]. It is a mid-way stop of Line 1 (Meyan Line). It was once the temporary northern terminus of [[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]] before the renovation between [[/northern_snow_village_station|Northern Snow Village]] station and this station is done. 
  
 The literal meaning of the Chinese name means //Red Clift and Cave//, comes from the Siberian Taiga biome, clifty terrain and large lush cave near the station. The station also shares a very similar name to a tourist attraction in Chongqing also located at a clift //Hongyadong (洪崖洞)//, but it is just a coincidence. The literal meaning of the Chinese name means //Red Clift and Cave//, comes from the Siberian Taiga biome, clifty terrain and large lush cave near the station. The station also shares a very similar name to a tourist attraction in Chongqing also located at a clift //Hongyadong (洪崖洞)//, but it is just a coincidence.
Line 42: Line 42:
   * early December, 2023: A small renovation on the stairs is done. Most of the staircases in the station are extended and leave a small space in the middle for better safety and passengers experience. Due to the staircases at Exit C being long, two spaces are added at around 1/3 and 2/3 of their length.    * early December, 2023: A small renovation on the stairs is done. Most of the staircases in the station are extended and leave a small space in the middle for better safety and passengers experience. Due to the staircases at Exit C being long, two spaces are added at around 1/3 and 2/3 of their length. 
   * 31 December, 2023: As the section between **Hung Ngai Tung** station and Northern Snow Village station is closed for renovation, incoming trains from the south only stop at platform 2 and then reverse back to the south.    * 31 December, 2023: As the section between **Hung Ngai Tung** station and Northern Snow Village station is closed for renovation, incoming trains from the south only stop at platform 2 and then reverse back to the south. 
-===== Layout (WIP) =====+  * 18 May, 2024: Platform 1 is used again as the section between this station and Northern Snow Village station has renovated. 
 +===== Layout =====
  
-Not counting exits, there are a total of floors in the station. **L1** is concourse and is separated into north and south part not directly accessible to each otherdue to [[/kwong_chow_grand_canal|the Grand Canal]] in betweenNorth part connects Exit C, D while south part connects Exit A, B. **L2** and **L3** are platforms under the canal+There are a total of floors in the station. **U4** is platform and **U3** is concoursealong with exit A. Exit B is located two floors underneath the concourse at **U1**, the lowest floor of the station. Exit C is in a structure at the northwest of the stationfrom concourse level **U3** goes up to highest floor **U5** by a pair of long escalators and staircases adjacent
  
-Platforms 1, 3 stack on top of platforms 2, 4 on the two sides. In between is the core structureUnder the concourse on two endsit consists of walls, passages, staircases and escalators. Under the canal, it has the famous high ceiling spacious and open designwith chandeliers hung between the pillarsTo facilitate the interchange at the upper platformsa passageway in the middle is built to further connect up platforms 1 and 3. And since future interchange between [[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line)]] south of Kwong Chow and [[mtr_letsplay:wlt_line_2|Line 2 (Kwong Chow - North Coast Line)]] requires going down from upper platforms to lower platforms, a staircase and two escalators connecting the two floors are also built+Platform layout is island platformIt makes the door opening direction different from the previous and next station Northern Snow Village and Sakura Stream Junctionallowing passengers to enter and exit the train at the less crowded side and hence improving efficiency. The island platform layout also requires fewer escalatorsstairs and lifts to be built, saving construction costsOpenness in the middle part of the platformas well as the tree kept in the platform level, is also one of the advantages of the adopted island platform design
  
-One lift is serving between north concourse and the platformswhile another is serving between south concourse and the platformsThe lift serving south concourse is larger due to a higher anticipated passengers flow and capacity needed+Concourse is underneath the platform. It has extended outwards under the arch of railway bridge for more space putting in a lift and the customer service centre. Passengers can enjoy the view of the lake and the island nearby here. Ticket machine is put at the north and south side of the concourse, near exit C and the escalator to exit Bbecause of the space constraint. There is also a shop space reserved for a convenience store at the south side of the concourse, near the passageway to exit A 
 + 
 +One lift is serving between the exits in the non-paid area at the south side, stopping at **U1**, **U3** and **U5**. The lift exit at U5 is assigned to a separate letter D as it is some distance away from the structure of exit C at the northwest side. Another lift is serving between concourse **U3** and the platform **U4**
  
 <WRAP left> <WRAP left>
  
-| **U1** |**South Side Exits**|**North Side Exits**| +| **U5** |**South Side Exits**|**North Side Exits**| 
-| ::: | Exit A2 | | +| ::: | Exit | Exit C | 
-| **G** |**South Side Exits** | **North Side Exits** |  +| **U4** | **Platform** ||
-| ::: | Exit A1, Exit B | Exit C, Exit D |  +
-| **L1** | **South Concourse** | **North Concourse** | +
-| ::: | Customer Service Centre, Tickets |+
-| **L2** | **Upper Platforms** ||+
 | ::: | @#EB7AE9: || | ::: | @#EB7AE9: ||
-| ::: | Platform **1** | [[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]] to [[mtr_letsplay:hung_ngai_tung_station|Hung Ngai Tung]] -> (Doors open on the right) |+| ::: | Platform **1** | [[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]] to Mesa / Mei Foo Wan -> (Doors open on the right) |
 | ::: |   Island Platform   || | ::: |   Island Platform   ||
-| ::: | Platform **3** | <- [[mtr_letsplay:wlt_line_2|Line (Kwong Chow - North Coast Line)]] terminating (Doors open on the right)+| ::: | Platform **2** | <- [[mtr_letsplay:wlt_line_1|Line (Meyan Line) Phase 1]] to Tai Po (Doors open on the right) |
-| ::: | @#FFDA33: || +
-| **L3** | **Lower Platforms**||+
 | ::: | @#EB7AE9: || | ::: | @#EB7AE9: ||
-::: Platform **2** | <- [[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]] terminating (Doors open on the left) +**U3** | **Concourse** || 
-| ::: |   Island Platform   || +| ::: | Exit A, Customer Service Centre, Tickets || 
-::: Platform **4** | [[mtr_letsplay:wlt_line_2|Line 2 (Kwong Chow - North Coast Line)]] W. Section Temp Shuttle to [[/sai_mo_island_station|Sai Mo Island]] -> (Doors open on the left) +**U2** | **Mezzanine** || 
-| ::: | @#FFDA33: ||+| **U1** |**Exit** || 
 +| ::: | Exit B || 
  
 </WRAP> </WRAP>
Line 86: Line 84:
 ===== Train Services ===== ===== Train Services =====
  
-Passengers may take Line 1 (Meyan Line) Phase 1 heading south towards Sakura Stream Junction station and [[/west_lake_area|West Lake Area]]. Train service heading north will resume after renovation works are done+Passengers may take Line 1 (Meyan Line) Phase 1 heading south towards Sakura Stream Junction station and [[/west_lake_area|West Lake Area]] or heading north towards Mesa station via Northern Snowland. Stations in [[/the_biomes_at_x_-4500|The Biomes at X -4500]] is currently work in progress.
  
 |  **[[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]]**  | |  **[[mtr_letsplay:wlt_line_1|Line 1 (Meyan Line) Phase 1]]**  |
 | @#EB7AE9: | | @#EB7AE9: |
-|  //<color gray>Northern Snow Village</color>// - **Hung Ngai Tung** - [[/sakura_stream_junction_station|Sakura Stream Junction]] - [[mtr_letsplay:providence_station|Providence]] - [[/birch_hill_station|Birch Hill]] - [[mtr_letsplay:chung_kwo_kok_station|Chung Kwo Kok]] - [[/kwong_chow_station|Kwong Chow]]  |+|  [[/mesa_station|Mesa]] - //<color #cccccc>Chi Chuk</color>// - //<color #cccccc>Ying Mo</color>// - //<color #cccccc>Tung Yuen</color>// - Northern Snow Village - **Hung Ngai Tung** - [[/sakura_stream_junction_station|Sakura Stream Junction]] - [[mtr_letsplay:providence_station|Providence]] - [[/birch_hill_station|Birch Hill]] - [[mtr_letsplay:chung_kwo_kok_station|Chung Kwo Kok]] - [[/kwong_chow_station|Kwong Chow]] - //<color #cccccc>Yuen Chow Kok</color>// - [[/tai_po_station|Tai Po]]  |
  
mtr_letsplay/hung_ngai_tung_station.1713256138.txt.gz · Last modified: 2024/04/16 08:28 by bdark000