mtr_letsplay:hung_ngai_tung_station
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| mtr_letsplay:hung_ngai_tung_station [2024/04/14 09:40] – [History] some formatting BDark000 | mtr_letsplay:hung_ngai_tung_station [2024/10/12 07:50] (current) – [Layout] Update platform 1 destination BDark000 | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== Hung Ngai Tung Station | + | ====== Hung Ngai Tung Station ====== |
| Line 25: | Line 25: | ||
| </ | </ | ||
| - | **Hung Ngai Tung Station** (Chinese: // | + | **Hung Ngai Tung Station** (Chinese: // |
| The literal meaning of the Chinese name means //Red Clift and Cave//, comes from the Siberian Taiga biome, clifty terrain and large lush cave near the station. The station also shares a very similar name to a tourist attraction in Chongqing also located at a clift // | The literal meaning of the Chinese name means //Red Clift and Cave//, comes from the Siberian Taiga biome, clifty terrain and large lush cave near the station. The station also shares a very similar name to a tourist attraction in Chongqing also located at a clift // | ||
| Line 38: | Line 38: | ||
| ==== Timeline ==== | ==== Timeline ==== | ||
| * early September, 2022: The station location and design is confirmed. | * early September, 2022: The station location and design is confirmed. | ||
| - | * early January, 2023: As Kwong Chow station | + | * early January, 2023: As Kwong Chow station |
| - | * 11 February, 2023: Station opens to the public. WLT Line 1 Phase 1 (now [[/ | + | * 11 February, 2023: Station opens to the public. WLT Line 1 Phase 1 (now [[/ |
| * early December, 2023: A small renovation on the stairs is done. Most of the staircases in the station are extended and leave a small space in the middle for better safety and passengers experience. Due to the staircases at Exit C being long, two spaces are added at around 1/3 and 2/3 of their length. | * early December, 2023: A small renovation on the stairs is done. Most of the staircases in the station are extended and leave a small space in the middle for better safety and passengers experience. Due to the staircases at Exit C being long, two spaces are added at around 1/3 and 2/3 of their length. | ||
| * 31 December, 2023: As the section between **Hung Ngai Tung** station and Northern Snow Village station is closed for renovation, incoming trains from the south only stop at platform 2 and then reverse back to the south. | * 31 December, 2023: As the section between **Hung Ngai Tung** station and Northern Snow Village station is closed for renovation, incoming trains from the south only stop at platform 2 and then reverse back to the south. | ||
| - | ===== Layout | + | * 18 May, 2024: Platform 1 is used again as the section between this station and Northern Snow Village station has renovated. |
| + | ===== Layout ===== | ||
| - | Not counting exits, there are a total of 3 floors in the station. **L1** is concourse | + | There are a total of 5 floors in the station. **U4** is platform |
| - | Platforms 1, 3 stack on top of platforms 2, 4 on the two sides. In between | + | Platform layout |
| - | One lift is serving between | + | Concourse is underneath the platform. It has extended outwards under the arch of railway bridge for more space putting in a lift and the customer service centre. Passengers can enjoy the view of the lake and the island nearby here. Ticket machine |
| + | |||
| + | One lift is serving | ||
| <WRAP left> | <WRAP left> | ||
| - | | **U1** |**South Side Exits**|**North Side Exits**| | + | | **U5** |**South Side Exits**|**North Side Exits**| |
| - | | ::: | Exit A2 | | | + | | ::: | Exit D | Exit C | |
| - | | **G** |**South Side Exits** | **North Side Exits** | | + | | **U4** | **Platform** || |
| - | | ::: | Exit A1, Exit B | Exit C, Exit D | | + | |
| - | | **L1** | **South Concourse** | **North Concourse** | | + | |
| - | | ::: | Customer Service Centre, Tickets || | + | |
| - | | **L2** | **Upper Platforms** || | + | |
| | ::: | @#EB7AE9: || | | ::: | @#EB7AE9: || | ||
| - | | ::: | Platform **1** | [[mtr_letsplay: | + | | ::: | Platform **1** | [[mtr_letsplay: |
| | ::: | | | ::: | | ||
| - | | ::: | Platform **3** | <- [[mtr_letsplay: | + | | ::: | Platform **2** | <- [[mtr_letsplay: |
| - | | ::: | @#FFDA33: || | + | |
| - | | **L3** | **Lower Platforms**|| | + | |
| | ::: | @#EB7AE9: || | | ::: | @#EB7AE9: || | ||
| - | | ::: | Platform | + | | **U3** |
| - | | ::: | Island Platform | + | | ::: | Exit A, Customer Service Centre, Tickets |
| - | | ::: | Platform | + | | **U2** |
| - | | ::: | @# | + | | **U1** |**Exit** |
| + | | ::: | Exit B || | ||
| </ | </ | ||
| Line 86: | Line 84: | ||
| ===== Train Services ===== | ===== Train Services ===== | ||
| - | Passengers may take Line 1 (Meyan Line) Phase 1 heading south towards Sakura Stream Junction station and [[/ | + | Passengers may take Line 1 (Meyan Line) Phase 1 heading south towards Sakura Stream Junction station and [[/ |
| | **[[mtr_letsplay: | | **[[mtr_letsplay: | ||
| | @#EB7AE9: | | | @#EB7AE9: | | ||
| - | | //< | + | | |
mtr_letsplay/hung_ngai_tung_station.1713087610.txt.gz · Last modified: 2024/04/14 09:40 by BDark000