mtr_letsplay:hung_ngai_tung_station
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
mtr_letsplay:hung_ngai_tung_station [2024/02/14 09:49] – Correct opening date bdark000 | mtr_letsplay:hung_ngai_tung_station [2024/10/12 07:50] (current) – [Layout] Update platform 1 destination bdark000 | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Hung Ngai Tung Station | + | ====== Hung Ngai Tung Station ====== |
Line 22: | Line 22: | ||
| **Station Code** | HNT | | | **Station Code** | HNT | | ||
| **Opened** | 11 February, 2023 | | | **Opened** | 11 February, 2023 | | ||
- | | **Electrification** | 25kV Overhead Cable AC (WIP)\\ | + | | **Electrification** | 25kV Overhead Cable AC (WIP)\\ | |
</ | </ | ||
- | **Hung Ngai Tung Station** (Chinese: // | + | **Hung Ngai Tung Station** (Chinese: // |
+ | |||
+ | The literal meaning | ||
===== History ===== | ===== History ===== | ||
- | When [[/ | + | This station is first proposed |
- | After the planned light rail routes | + | The station location is picked right at the clift, since tracks |
- | + | ||
- | Unfortunately, | + | |
- | + | ||
- | Although | + | |
+ | **Hung Ngai Tung** station isn't expected to serve many passengers before nearby station developments are done. Also, since it requires more planning and preparation, | ||
==== Timeline ==== | ==== Timeline ==== | ||
- | * late July, 2022: Initial plan of transportation in the West Lake Area is out. Stations are not yet confirmed | + | * early September, 2022: The station location and design |
- | * early August, 2022: WLT confirms that only one **Kwong Chow** station | + | * early January, 2023: As Kwong Chow station opens to the public and finishes construction, |
- | * early September, 2022: Station | + | * 11 February, 2023: Station |
- | * mid October, 2022: Station | + | * early December, 2023: A small renovation on the stairs is done. Most of the staircases in the station are extended and leave a small space in the middle for better safety and passengers experience. |
- | * 22 December, 2022: Station is open to the public | + | * 31 December, 2023: As the section between **Hung Ngai Tung** station and Northern Snow Village station is closed for renovation, incoming trains |
- | * early January, 2023: Step-free access is now fully available after a new lift exit is added to Exit D. | + | * 18 May, 2024: Platform 1 is used again as the section between this station and Northern Snow Village station has renovated. |
- | * 24 June, 2023: Line 2 (Kwong Chow - North Coast Line) runs a shuttle service (later known as W. Section Temp Shuttle) between | + | |
- | * early December, 2023: A small renovation on the stairs is done. Most of the staircases in the station are extended and leave a small space in the middle for better safety and passengers experience. | + | |
===== Layout ===== | ===== Layout ===== | ||
- | Not counting exits, there are a total of 3 floors in the station. **L1** is concourse | + | There are a total of 5 floors in the station. **U4** is platform |
- | Platforms 1, 3 stack on top of platforms 2, 4 on the two sides. In between | + | Platform layout |
- | One lift is serving between | + | Concourse is underneath the platform. It has extended outwards under the arch of railway bridge for more space putting in a lift and the customer service centre. Passengers can enjoy the view of the lake and the island nearby here. Ticket machine |
+ | |||
+ | One lift is serving | ||
<WRAP left> | <WRAP left> | ||
- | | **U1** |**South Side Exits**|**North Side Exits**| | + | | **U5** |**South Side Exits**|**North Side Exits**| |
- | | ::: | Exit A2 | | | + | | ::: | Exit D | Exit C | |
- | | **G** |**South Side Exits** | **North Side Exits** | | + | | **U4** | **Platform** || |
- | | ::: | Exit A1, Exit B | Exit C, Exit D | | + | |
- | | **L1** | **South Concourse** | **North Concourse** | | + | |
- | | ::: | Customer Service Centre, Tickets || | + | |
- | | **L2** | **Upper Platforms** || | + | |
| ::: | @#EB7AE9: || | | ::: | @#EB7AE9: || | ||
- | | ::: | Platform **1** | [[mtr_letsplay: | + | | ::: | Platform **1** | [[mtr_letsplay: |
| ::: | | | ::: | | ||
- | | ::: | Platform **3** | <- [[mtr_letsplay: | + | | ::: | Platform **2** | <- [[mtr_letsplay: |
- | | ::: | @#FFDA33: || | + | |
- | | **L3** | **Lower Platforms**|| | + | |
| ::: | @#EB7AE9: || | | ::: | @#EB7AE9: || | ||
- | | ::: | Platform | + | | **U3** |
- | | ::: | Island Platform | + | | ::: | Exit A, Customer Service Centre, Tickets |
- | | ::: | Platform | + | | **U2** |
- | | ::: | @# | + | | **U1** |**Exit** |
+ | | ::: | Exit B || | ||
</ | </ | ||
Line 80: | Line 73: | ||
===== Exits ===== | ===== Exits ===== | ||
- | * A: | + | * A: Azalea Cave |
* A1: [WIP] | * A1: [WIP] | ||
- | * A2: | + | * A2: Azalea Cave |
* B: Shore {{mtr: | * B: Shore {{mtr: | ||
* C: Little House on the Clift | * C: Little House on the Clift | ||
Line 91: | Line 84: | ||
===== Train Services ===== | ===== Train Services ===== | ||
- | Passengers may take Line 1 (Meyan Line) Phase 1 heading south towards Sakura Stream Junction station and [[/ | + | Passengers may take Line 1 (Meyan Line) Phase 1 heading south towards Sakura Stream Junction station and [[/ |
| **[[mtr_letsplay: | | **[[mtr_letsplay: | ||
| @#EB7AE9: | | | @#EB7AE9: | | ||
- | | //< | + | | |
mtr_letsplay/hung_ngai_tung_station.1707904153.txt.gz · Last modified: 2024/02/14 09:49 by bdark000