mtr_letsplay:fryskeline
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
mtr_letsplay:fryskeline [2024/05/25 04:13] – wow! updates! now includes 50% more actual info on construction, future plans, and uh *checks notes* wait all stations are finished? szandorthe13th | mtr_letsplay:fryskeline [2025/02/24 10:56] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 9: | Line 9: | ||
| @# | | @# | ||
| **Owned by** | Moszyan Transport | | **Owned by** | Moszyan Transport | ||
- | | **Opening Date** | + | | **Opening Date** |
| **Serving Districts** | | **Serving Districts** | ||
| ::: | Taipa | | | ::: | Taipa | | ||
Line 38: | Line 38: | ||
On May 22nd, construction of **Rykkam**' | On May 22nd, construction of **Rykkam**' | ||
+ | |||
+ | On June 1st, the very first public journey was made using the Moszyan Railways FLIRT, from Kallos Royal Park to Hylkemare. The event was memorable for all the wrong reasons, due to the excessive amount of visitors present at the opening creating huge lag that almost broke the server. The normally 15-minute drive took well over half an hour due to this, and as the train was being driven back to Kallos, the regular FLIRT 3 trains began operating. | ||
===== Stations ===== | ===== Stations ===== | ||
| @# | | @# | ||
- | | **Hylkemare** | + | | **Hylkemare** |
| **Hylkemare Wieringawijk** | | **Hylkemare Wieringawijk** | ||
| **De Marren** | | **De Marren** |
mtr_letsplay/fryskeline.1716610381.txt.gz · Last modified: 2024/05/25 04:13 by szandorthe13th