This is an old revision of the document!
Table of Contents
Cinderace Line
(S11)Cinderace Line | |
![]() |
|
Overview | |
Owner(s) | Terralith Rapid Transit |
Area Served | Hana-koshi, Llanmara |
Transit type | Rapid_Transit |
Line Number | S11 |
Number of stations | 48(Current) |
49(Plan) | |
Real-Life Inspiration | Toei_Ōedo_Line |
Colour on map | Fire Orange (#BB492B) |
Service & Operation | |
Began passenger operation | October 2022 |
Operator(s) | ShimanoMTR |
Train length | 9 vehicles per trainset |
Technical | |
No. of tracks | 2 |
Track gauge | 1435mm |
Drive system | Iron wheel type linear induction motor (aka: Linear Metro) |
Electrification | 1500V DC Overhead systems |
Maximum speed | 80 km/h |
Top operational speed | 80 km/h |
Construction Specifications | |
Distance between nodes | 3 blocks |
Ballast block | Stone |
Sound barrier/support block | Orange yellow block |
Tunnel Model | 5m Shield Tunnnel |
Cinderace Line | |
Traditional Chinese | 閃焰王牌綫 |
Simplified Chinese | 闪焰王牌线 |
Transcriptions | |
Standard Mandarin | |
Hanyu Pinyin | Shǎn yàn wáng pái xiàn |
Yue: Cantonese | |
Yale Romanization | Shǎn yàn wáng pái xiàn |
JyutPing | sim2 yim6 wong4 paai4/paai2 sin3 |
The Cinderace Line (Chinese: 閃焰王牌綫) is a core part of the ShimanoMTR network and runs in a figure 6 through the northwestern area of Spawn and through Llanmara.
History
Planning for this line began in August 2022, and a sign announcing its existence was installed at Extreme Hot Springs Station.
A Cinderace Line reservation platform was also installed at Shirokaba Mansion Station, which was completed in September 2022.
Construction began at Azalea Station in September 2022, and Line S11T opened between Azalea Station and Extreme Hot Springs Station in October 2022.
In November 2022, Line S11 will open between Kurokusa Mansion Station and Shirokaba Mansion Station.
Line S11T opened in early December 2022 between Extreme Hot Spring Station and Ying Chuk Station, and between Ying Chuk Station and Cinderace Station.
It will open between Azalea Station and Kurokaba Mansion Station in early January 2023. Line S11T has been merged into Line S11 and has been discontinued.
At the same time, a permanent depot was constructed approximately 1.5 km east of Ying chuk station.
It was extended from Ying Chuk station to Black Lea station in March 2023.
Queen Elizabeth II Station opens in July 2023.
In early August 2023, the entire loop line section opened from Shirokaba Mansion Station to Cinderace Station.
The final section, between Black Lea and Llanmara stations, will open in late August 2023. All sections are now open except for Twynn Station along the way.
Rolling Stocks
Operations
All trains operate in 9-car formations. All trains run clockwise from Ying Chuk, return to Ying Chuk, and continue towards Llanmara.
AtAt the time of opening, the train frequency was 2.5 minutes, same as other SMTR lines, but from December 30, 2023, the train frequency will be 6 minutes for a limited time.
Average Train Intervals (in mins) | |
---|---|
Time Session (in UTC+8) | (S11)Cinderace Line |
All hours   | 6 - 7 |
Future Plans
The only unopened Twynn station is currently under construction.
Refreshment work is currently underway to gradually update the old style tunnels to obj model tunnels.