User Tools

Site Tools


mtr_letsplay:cinderace_line

This is an old revision of the document!


Cinderace Line

(S11)Cinderace Line
Overview
Owner(s) Terralith Rapid Transit
Area Served (Wide Area)
Transit type Rapid_Transit
Line Number S11
Number of stations 33(Current)
49(Plan)
Real-Life Inspiration Toei_Ōedo_Line
Colour on map Fire Orange (#BB492B)
Service & Operation
Began passenger operation October 2022
Operator(s) ShimanoMTR
Train length 9 vehicles per trainset
Technical
No. of tracks 2
Track gauge 1435mm
Drive system Iron wheel type linear induction motor (aka: Linear Metro)
Electrification 1500V DC Overhead systems
Maximum speed 80 km/h
Top operational speed 80 km/h
Construction Specifications
Distance between nodes 3 blocks
Ballast block Stone
Sound barrier/support block Orange yellow block
Tunnel Model 5m Shield Tunnnel
Cinderace Line
Traditional Chinese 閃焰王牌綫
Simplified Chinese 闪焰王牌线
Transcriptions
Standard Mandarin
Hanyu Pinyin Shǎn yàn wáng pái xiàn
Yue: Cantonese
Yale Romanization Shǎn yàn wáng pái xiàn
JyutPing sim2 yim6 wong4 paai4/paai2 sin3

The Cinderace Line (Chinese: 閃焰王牌綫) is a core part of the ShimanoMTR network and runs in a figure 6 through the northwestern area of Spawn and through Llanmara.

History

Planning for this line began in August 2022, and a sign announcing its existence was installed at Extreme Hot Springs Station.

A Cinderace Line reservation platform was also installed at Shirokaba Mansion Station, which was completed in September 2022.

Construction began at Azalea Station in September 2022, and Line S11T opened between Azalea Station and Extreme Hot Springs Station in October 2022.

In November 2022, Line S11 will open between Kurokusa Mansion Station and Shirokaba Mansion Station.

Line S11T opened in early December 2022 between Extreme Hot Spring Station and Ying Chuk Station, and between Ying Chuk Station and Cinderace Station.

It will open between Azalea Station and Kurokaba Mansion Station in early January 2023. Line S11T has been merged into Line S11 and has been discontinued.

At the same time, a permanent depot was constructed approximately 1.5 km east of Ying chuk station.

It was extended from Ying Chuk station to Black Lea station in March 2023.

Queen Elizabeth II Station opens in July 2023.

In early August 2023, the entire loop line section opened from Shirokaba Mansion Station to Cinderace Station.

The final section, between Black Lea and Llanmara stations, will open in late August 2023. All sections are now open except for Twynn Station along the way.

Rolling Stocks

Operations

All trains operate in 9-car formations. All trains run clockwise from Ying Chuk, return to Ying Chuk, and continue towards Llanmara.

AtAt the time of opening, the train frequency was 2.5 minutes, same as other SMTR lines, but from December 30, 2023, the train frequency will be 6 minutes for a limited time.

Average Train Intervals (in mins)
Time Session
(in UTC+8)
(S11)Cinderace Line

All hours
 

6 - 7

Future Plans

The only unopened Twynn station is currently under construction.

Refreshment work is currently underway to gradually update the old style tunnels to obj model tunnels.

Stations

mtr_letsplay/cinderace_line.1704207965.txt.gz · Last modified: 2024/01/02 15:06 by cinderaceots