User Tools

Site Tools


mtr_letsplay:cinderace_line

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
mtr_letsplay:cinderace_line [2024/04/07 03:33] cinderaceotsmtr_letsplay:cinderace_line [2024/11/16 04:13] (current) cinderaceots
Line 8: Line 8:
 | **Owner(s)** |[[Terralith Rapid Transit|Terralith Rapid Transit]] | | **Owner(s)** |[[Terralith Rapid Transit|Terralith Rapid Transit]] |
 | **Area Served** | Hana-koshi, Llanmara | | **Area Served** | Hana-koshi, Llanmara |
-| **Transit type** | [[wp>Rapid_Transit|Rapid_Transit]] |+| **Transit type** | [[wp>Rapid_Transit|Rapid Transit]] | 
 +| |[[wp>Medium-capacity_rail_system|Light Metro]]|
 | **Line Number** | S11 | | **Line Number** | S11 |
 | **Number of stations** | 48(Current) | | **Number of stations** | 48(Current) |
- | 49(Plan) |+| | 49(Plan) |
 | **Real-Life Inspiration** | [[wp>Toei_Ōedo_Line|Toei_Ōedo_Line]] | | **Real-Life Inspiration** | [[wp>Toei_Ōedo_Line|Toei_Ōedo_Line]] |
 | **Colour on map** | Fire Orange (#BB492B) | | **Colour on map** | Fire Orange (#BB492B) |
Line 23: Line 24:
 | **Drive system** |Iron wheel type linear induction motor (aka: Linear Metro)| | **Drive system** |Iron wheel type linear induction motor (aka: Linear Metro)|
 | **Electrification** | [[wp>List_of_railway_electrification_systems#1,500_V_DC|1500V DC Overhead systems]] | | **Electrification** | [[wp>List_of_railway_electrification_systems#1,500_V_DC|1500V DC Overhead systems]] |
-| **Maximum speed** | 80 km/h |+| **Maximum speed** | 90 km/h |
 | **Top operational speed** | 80 km/h | | **Top operational speed** | 80 km/h |
 |  @#BB492B:  **Construction Specifications**  || |  @#BB492B:  **Construction Specifications**  ||
Line 68: Line 69:
 The final section, between Black Lea and Llanmara stations, will open in late August 2023. All sections are now open except for Twynn Station along the way. The final section, between Black Lea and Llanmara stations, will open in late August 2023. All sections are now open except for Twynn Station along the way.
  
-From the end of 2023, due to server lag due to an increase in the number of players, a stuck area occurred near the Depot, so the service frequency was temporarily reduced to 6 minutes from December 30, 2023, but the service frequency was temporarily reduced to 6 minutes from April 4, 2024. By moving the Depot to the south and changing the alignment to make it difficult for passengers to get stuck, the service frequency was returned to 2 and a half minutes. The site of the old Depot will be used as the [[Jigglypuff Line]] Depot.+From the end of 2023, due to server lag due to an increase in the number of players, a stuck area occurred near the Depot, so the service frequency was temporarily reduced to 6 minutes from December 30, 2023.  
 +April 4, 2024. By moving the Depot to the south and changing the alignment to make it difficult for passengers to get stuck, the service frequency was returned to 2 and a half minutes. The site of the old Depot will be used as the [[Jigglypuff Line]] Depot.
  
 ===== Rolling Stocks ===== ===== Rolling Stocks =====
Line 89: Line 91:
 ===== Future Plans ===== ===== Future Plans =====
 The only unopened Twynn station is currently under construction. The only unopened Twynn station is currently under construction.
 +In parallel with this, Llanmara station is being renovated.
  
 Refreshment work is currently underway to gradually update the old style tunnels to obj model tunnels. Refreshment work is currently underway to gradually update the old style tunnels to obj model tunnels.
mtr_letsplay/cinderace_line.1712460790.txt.gz · Last modified: 2024/04/07 03:33 by cinderaceots