mtr_letsplay:cinderace_line
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| mtr_letsplay:cinderace_line [2024/01/13 05:08] – CinderaceOTS | mtr_letsplay:cinderace_line [2024/11/16 04:13] (current) – CinderaceOTS | ||
|---|---|---|---|
| Line 8: | Line 8: | ||
| | **Owner(s)** |[[Terralith Rapid Transit|Terralith Rapid Transit]] | | | **Owner(s)** |[[Terralith Rapid Transit|Terralith Rapid Transit]] | | ||
| | **Area Served** | Hana-koshi, Llanmara | | | **Area Served** | Hana-koshi, Llanmara | | ||
| - | | **Transit type** | [[wp> | + | | **Transit type** | [[wp> |
| + | | |[[wp> | ||
| | **Line Number** | S11 | | | **Line Number** | S11 | | ||
| | **Number of stations** | 48(Current) | | | **Number of stations** | 48(Current) | | ||
| - | | | 49(Plan) | | + | | | 49(Plan) | |
| | **Real-Life Inspiration** | [[wp> | | **Real-Life Inspiration** | [[wp> | ||
| | **Colour on map** | Fire Orange (#BB492B) | | | **Colour on map** | Fire Orange (#BB492B) | | ||
| Line 23: | Line 24: | ||
| | **Drive system** |Iron wheel type linear induction motor (aka: Linear Metro)| | | **Drive system** |Iron wheel type linear induction motor (aka: Linear Metro)| | ||
| | **Electrification** | [[wp> | | **Electrification** | [[wp> | ||
| - | | **Maximum speed** | 80 km/h | | + | | **Maximum speed** | 90 km/h | |
| | **Top operational speed** | 80 km/h | | | **Top operational speed** | 80 km/h | | ||
| | @# | | @# | ||
| Line 67: | Line 68: | ||
| The final section, between Black Lea and Llanmara stations, will open in late August 2023. All sections are now open except for Twynn Station along the way. | The final section, between Black Lea and Llanmara stations, will open in late August 2023. All sections are now open except for Twynn Station along the way. | ||
| + | |||
| + | From the end of 2023, due to server lag due to an increase in the number of players, a stuck area occurred near the Depot, so the service frequency was temporarily reduced to 6 minutes from December 30, 2023. | ||
| + | April 4, 2024. By moving the Depot to the south and changing the alignment to make it difficult for passengers to get stuck, the service frequency was returned to 2 and a half minutes. The site of the old Depot will be used as the [[Jigglypuff Line]] Depot. | ||
| ===== Rolling Stocks ===== | ===== Rolling Stocks ===== | ||
| Line 74: | Line 78: | ||
| All trains operate in 9-car formations. All trains run clockwise from Ying Chuk, return to Ying Chuk, and continue towards Llanmara. | All trains operate in 9-car formations. All trains run clockwise from Ying Chuk, return to Ying Chuk, and continue towards Llanmara. | ||
| - | AtAt the time of opening, the train frequency was 2.5 minutes, same as other SMTR lines, but from December 30, 2023, the train frequency will be 6 minutes | + | As mentioned above, it used to be 6 minutes, but after relocating the Depot, it has been returned to 2 and a half minutes. |
| <WRAP center> | <WRAP center> | ||
| Line 81: | Line 85: | ||
| | @# | | @# | ||
| | **Time Session** | | **Time Session** | ||
| - | | \\ All hours \\ < | + | | \\ All hours \\ < |
| </ | </ | ||
| Line 87: | Line 91: | ||
| ===== Future Plans ===== | ===== Future Plans ===== | ||
| The only unopened Twynn station is currently under construction. | The only unopened Twynn station is currently under construction. | ||
| + | In parallel with this, Llanmara station is being renovated. | ||
| Refreshment work is currently underway to gradually update the old style tunnels to obj model tunnels. | Refreshment work is currently underway to gradually update the old style tunnels to obj model tunnels. | ||
mtr_letsplay/cinderace_line.1705122523.txt.gz · Last modified: 2024/01/13 05:08 by CinderaceOTS