User Tools

Site Tools


mtr_letsplay:cinderace_line

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
mtr_letsplay:cinderace_line [2024/01/02 15:06] cinderaceotsmtr_letsplay:cinderace_line [2024/11/16 04:13] (current) cinderaceots
Line 7: Line 7:
 |  @#BB492B:  **Overview**  || |  @#BB492B:  **Overview**  ||
 | **Owner(s)** |[[Terralith Rapid Transit|Terralith Rapid Transit]] | | **Owner(s)** |[[Terralith Rapid Transit|Terralith Rapid Transit]] |
-| **Area Served** | (Wide Area) +| **Area Served** | Hana-koshi, Llanmara 
-| **Transit type** | [[wp>Rapid_Transit|Rapid_Transit]] |+| **Transit type** | [[wp>Rapid_Transit|Rapid Transit]] | 
 +| |[[wp>Medium-capacity_rail_system|Light Metro]]|
 | **Line Number** | S11 | | **Line Number** | S11 |
-| **Number of stations** | 33(Current) | +| **Number of stations** | 48(Current) | 
- | 49(Plan) |+| | 49(Plan) |
 | **Real-Life Inspiration** | [[wp>Toei_Ōedo_Line|Toei_Ōedo_Line]] | | **Real-Life Inspiration** | [[wp>Toei_Ōedo_Line|Toei_Ōedo_Line]] |
 | **Colour on map** | Fire Orange (#BB492B) | | **Colour on map** | Fire Orange (#BB492B) |
Line 23: Line 24:
 | **Drive system** |Iron wheel type linear induction motor (aka: Linear Metro)| | **Drive system** |Iron wheel type linear induction motor (aka: Linear Metro)|
 | **Electrification** | [[wp>List_of_railway_electrification_systems#1,500_V_DC|1500V DC Overhead systems]] | | **Electrification** | [[wp>List_of_railway_electrification_systems#1,500_V_DC|1500V DC Overhead systems]] |
-| **Maximum speed** | 80 km/h |+| **Maximum speed** | 90 km/h |
 | **Top operational speed** | 80 km/h | | **Top operational speed** | 80 km/h |
 |  @#BB492B:  **Construction Specifications**  || |  @#BB492B:  **Construction Specifications**  ||
Line 67: Line 68:
  
 The final section, between Black Lea and Llanmara stations, will open in late August 2023. All sections are now open except for Twynn Station along the way. The final section, between Black Lea and Llanmara stations, will open in late August 2023. All sections are now open except for Twynn Station along the way.
 +
 +From the end of 2023, due to server lag due to an increase in the number of players, a stuck area occurred near the Depot, so the service frequency was temporarily reduced to 6 minutes from December 30, 2023. 
 +April 4, 2024. By moving the Depot to the south and changing the alignment to make it difficult for passengers to get stuck, the service frequency was returned to 2 and a half minutes. The site of the old Depot will be used as the [[Jigglypuff Line]] Depot.
  
 ===== Rolling Stocks ===== ===== Rolling Stocks =====
Line 74: Line 78:
 All trains operate in 9-car formations. All trains run clockwise from Ying Chuk, return to Ying Chuk, and continue towards Llanmara. All trains operate in 9-car formations. All trains run clockwise from Ying Chuk, return to Ying Chuk, and continue towards Llanmara.
  
-AtAt the time of openingthe train frequency was 2.5 minutes, same as other SMTR lines, but from December 302023, the train frequency will be 6 minutes for a limited time.+As mentioned aboveit used to be 6 minutes, but after relocating the Depotit has been returned to 2 and a half minutes.
  
 <WRAP center> <WRAP center>
Line 81: Line 85:
 |  @#BB492B:  || |  @#BB492B:  ||
 |  **Time Session**  \\  (in [[wp>UTC+08:00|UTC+8]])  |  **(S11)Cinderace Line**  | |  **Time Session**  \\  (in [[wp>UTC+08:00|UTC+8]])  |  **(S11)Cinderace Line**  |
-| \\ All hours \\ <html>&nbsp</html> \\ 6 - 7 |+| \\ All hours \\ <html>&nbsp</html> \\ 2.5 |
  
 </WRAP> </WRAP>
Line 87: Line 91:
 ===== Future Plans ===== ===== Future Plans =====
 The only unopened Twynn station is currently under construction. The only unopened Twynn station is currently under construction.
 +In parallel with this, Llanmara station is being renovated.
  
 Refreshment work is currently underway to gradually update the old style tunnels to obj model tunnels. Refreshment work is currently underway to gradually update the old style tunnels to obj model tunnels.
mtr_letsplay/cinderace_line.1704207965.txt.gz · Last modified: 2024/01/02 15:06 by cinderaceots