Table of Contents

Lilac Light Rail Route 802, 802S

Lilac Light Rail Route 802 (Chinese: 麗蓮輕鐵802綫) is a Lilac Light Rail route connecting Light Rail Depot stop and Hot Springs stop, and is jointly owned by Qingli Railways and Lilypad Rail. This is the first light rail route built by Qingli Railways, which goes via Karest Lake, Kallos Ferry Pier, Toitoi, towards Hot Springs.

Lilac Light Rail Route 802S (Chinese: 麗蓮輕鐵802S綫) is a Lilac Light Rail route connecting Light Rail Depot stop and Icesert Estate stop, and is jointly owned by Qingli Railways and Lilypad Rail. This is a special route which through runs with Hi-Sko Schwarz LRT after running on route 802 till Icesert Estate stop.

Lilac Light Rail Route 802
麗蓮輕鐵802綫

A Phase I train arriving at
Hot Springs stop (October 2023)
Overview
Operate locationKallos
Toitoi
Spawn
Service typeLight Rail Transit
StatusOperational
Starting stopLight Rail Depot
TerminusHot Springs
Technical
Maximum Speed80km/h
Number of stations12
Track gauge1435mm
(4 ft 0.5 in)
standard gauge
Electrification750 DC Third Rail
DepotKallos Light Rail Depot
Rolling stockLight Rail Phase I
Light Rail Phase II
Light Rail Phase III
Light Rail Phase IV
Light Rail Phase V
Number of cars1 or 2
Service
Opened5 October 2022, 1 year ago
Owner(s)Qingli Railways
Lilypad Rail
Operator(s)Qingli Railways
Lilac Light Rail Route 802S
麗蓮輕鐵802S綫
Overview
Operate locationKallos
Toitoi
Spawn
Service typeLight Rail Transit
StatusOperational
Starting stopLight Rail Depot
TerminusIcesert Estate
Technical
Maximum Speed80km/h
Number of stations17
Track gauge1435mm
(4 ft 0.5 in)
standard gauge
Electrification750 DC Third Rail
DepotKallos Light Rail Depot
Rolling stockLight Rail Phase III
Number of cars1 or 2
Service
Opened4 December 2022,
10 months ago
Owner(s)Qingli Railways
Lilypad Rail
Operator(s)Qingli Railways

History

On 5 August 2022, the first route built by Qingli Railways, route 801 went fully operational. The original 801 runs from Kallos to Kallos Ferry Pier.

On 11 August 2022, route 801 has been splitted into 2 routes, routes 801 and 801P. This is the original form of the current route 801, which runs from Kallos to Karest Lake Beach.

On 13 August 2022, New Harmony Railways proposed to extend route 801P to Puketeraki and interchange with AT Metro. The construction started on 20 August 2022. On 3 September, Chin Ka Village light rail (Route 762) was completed which runs between Toitoi and Lei Yue Mun, owned by Jonathan Railway Authorities. New Harmony Railways released a proposal next day of setting up a peak hour route running from Kallos to Puketeraki, Toitoi, and continue to run on tracks of Route 762 until Lei Yue Mun. The route number of this route was later decided to be 801X. The extension completed on 10 September 2022.

On 10 September 2022, the Eastern terminus of route 801X was moved from Kallos to Light Rail Depot. The Eastern terminus of route 801P was also moved on the next day.

On 4 December 2022, the frequency of route 801P was increased to the same as other routes and was renamed into 802. The route was extended from Puketeraki to Hot Springs. Route 801X was discontinued since that day as it cannot increase the efficiency significantly anymore.

On the same day, route 802S went fully operational and has a frequency of 1 hour.

On 29 October 2023, Royal Park stop is added in Hot Springs bound for future connections to Elizebeth Line and route 804.

On 1 November 2023, Kallos stop is removed from route 802 and 802S

Stations

Fare
Zone
Name District Connections Opened
Lilac Light Rail Route 802, 802S














1
Light Rail Depot
輕鐵車廠
Kallos 10 September 2022

Light Rail Depot  Guri Bay Line 

Royal Park
皇家園
29 October 2023
Kallos West
麗灣西
5 August 2022
Kallos  AT Metro 
 Kallos Express 
Kallos Mountain Forest
麗山森林
Karest Lake (East)
麗林湖(東)
Kwai Lam
葵林
Karest Lake (West)
麗林湖(西)
Kallos Ferry Pier
麗灣碼頭
Kallos Ferry
Puketeraki
普基蒂拉基
Toitoi 10 September 2022
Puketeraki  AT Metro 








3
Toitoi
泰太
Toitoi  Azalea CL 
 North Coast Line 
 AT Metro 
 AT Regional 
Two Point Five Ka Tsuen
二點五家村
4 December 2022
Yau Tong
油塘
Hot Springs
炎春
Spawn 24 August 2022
Calcite Village
方解石村






3A
Hot River
熱河
Snow Beach
雪灘
Tuff Village
凝灰岩村
Icesert Estate
雪漠鎮
Icesert Estate  Spawn Grand Circular 
 Ship Line 
Remarks
Bolded station names means that the station is served by 802S but not 802.
: Schwarz LRT
: Weiss Express Line

Fare Zones

-      Fare Zone 1: Light Rail Depot ⇄ Puketeraki
-      Fare Zone 3: Toitoi ⇄ Calcite Village (Section between Hot Springs and Calcite Village only suitable for route 802S)
-      Fare Zone 3A: Hot River ⇄ Icesert Estate (Only suitable for route 802S)
Route 802 can meet up with other light rail routes: 115, 483P, 762, 801, 801P, 804, 810, 882.

Independent Sections

- Track section between Karest Lake (West) and Puketeraki

Reference Pages

- Lilac Light Rail
- Lilac Light Rail Route 801
- Lilac Light Rail Route 801P
- Lilac Light Rail Route 115
- Lilac Light Rail Route 803